5500-PM-OG0005 Checklist Rev. 2/2011 COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WATERSHED MANAGEMENT BUREAU OF OIL AND GAS MANAGEMENT NOTICE OF INTENT (NOI) ADMINISTRATIVE COMPLETENESS CHECKLIST EROSION AND SEDIMENT CONTROL GENERAL PERMIT FOR EARTH DISTURBANCE ASSOCIATED WITH OIL AND GAS EXPLORATION, PRODUCTION, PROCESSING, OR TREATMENT OPERATIONS OR TRANSMISSION FACILITIES (ESCGP-1) Please check the following list to make sure that you have included all the required information. Place a check mark in the column provided for all items completed and/or provided. Failure to provide all of the requested information will delay the processing of the application, may preclude the use of the expedited review, and may result in the application being placed ON HOLD with NO ACTION, or being considered withdrawn and the application file closed. THIS CHECKLIST MUST BE COMPLETED AND ENCLOSED WITH YOUR GENERAL PERMIT NOI CHECKLIST FOR EROSION AND SEDIMENT CONTROL GENERAL PERMIT NOI Minor revisions are not required to be submitted NEW NOI RENEWAL SUBSEQUENT PHASE Major Revision Minor Revision to the regional office for review. If a Renewal, Subsequent Phase or Revision, identify ESCGP-1 Permit Authorization # Applicant Check if Official Included Use Only APPLICANT PROJECT and PHASE NAME 1. 2. Fully completed, properly signed and notarized Notice of Intent form (1 original and 2 copies). (Not required for subsequent phases) Complete Erosion and Sediment Control (E&S) Plans. (3 copies) NOTE: Identify Location as Drawings (D), Narrative (N). (Identify Not Applicable as “N/A”.) a. Topographic features Location: Page: b. Soils information Location: Page: c. Proposed alteration Location: Page: d. Amount of runoff Location: Page: Location of water which may receive runoff and receiving e. water classification, pursuant to Chapter 93 and the Location: “statewide existing use listing”. Page: f. Supporting calculations Location: Page: g. BMPs used before, during, and after earth disturbance, Location: including special protection BMPs. Page: h. Maintenance program Location: Page: i. Plan drawings and narratives Location: Page: j. Sequence of BMP installation and removal Location: Page: Location: Page: Permit filing fee of $500 plus $100/Acre of earth disturbance payable to the appropriate Clean Water Fund. Location: (Not required for subsequent phases) Page: Location map: USGS of scale 1:24,000 indicating project location and boundaries. (3 copies) (Not required for subsequent phases) Page: k. Recycling and disposal methods 3. 4. -1- Location: 5500-PM-OG0005 Checklist Rev. 2/2011 Applicant Check if Official Included Use Only CHECKLIST FOR ESCGP-1 5. Act 14 Municipal Notifications to the local municipality and county governments that specify that the application is for a Erosion and Sediment Control General Permit for Earth Disturbance Associated with Oil and Gas Activities. (3 copies) A "sample" notification letter is provided as Appendix A of the instructions. (Not required for subsequent phases) Location: Page: 6. Proof of receipt of municipal notifications; copies of certified mail receipts or acknowledgment letters from the local municipality and county government. (3 copies) (Not required for subsequent phases) Location: Page: 7. The PNHP Review receipt for the project area. Include impact clearance letters if proof of agency coordination is required. (3 copies) (Not required for subsequent phases if review receipt or impact clearance letters are still valid) Location: Page: 8. Complete Post Construction Stormwater Management (PCSM)/Site Restoration Plan. (3 copies) NOTE: Identify Location(s) by Drawing (D), Narrative (N) and page number(s). Plans must address the following: (Identify Not Applicable as “N/A”.) a. Written Narrative Location: Page: 9. b. Location of BMPs showing final contours Location: Page: c. Plan drawings of permanent stabilization Location: Page: d. Plan drawings of BMPs Location: Page: e. Operation and maintenance procedure Location: Page: f. Supporting calculations or measurements Location: Page: g. Design frequency storm rainfall amount Location: Page: h. Area of impervious surface Location: Page: i. Curve Number or Runoff Coefficient Location: Page: j. Runoff from the design frequency storm Location: Page: k. Volume of water infiltrated through BMPs Location: Page: l. Peak discharge rate from the design frequency storm Location: Page: Expedited Review Is the expedited review being requested? Yes No If yes all of the following items must be completed: a. E&S and PCSM/Restoration Plan drawings and narrative sealed by licensed professional b. Licensed professional prepared, sealed, and certified application/NOI c. Licensed professional listed location and date of DEP training attended in application/NOI -2- 5500-PM-OG0005 Checklist Rev. 2/2011 Applicant Check if Official Included Use Only CHECKLIST FOR ESCGP-1 10. Phased Projects Is the activity being conducted as a phased project? Yes No If yes all of the following must be completed: 11. a. Initial Phase - Is the master plan included? Yes No b. Subsequent Phase – Is the subsequent phase identified on the master plan? Yes No Yes No Certification for Subsequent Phase Expedited Reviews Is the activity being conducted as a phased project and is an expedited review being requested? If yes all of the following must be completed: I do hereby certify to the best of my knowledge, information, and belief, that the Erosion and Sediment Control and PCSM/Site Restoration Plan are true and correct, represent actual field conditions and are in accordance with the 25 Pa. Code Chapters 78 and 102 of the Department’s rules and regulations. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment. Signature Professional Seal Company Address Phone Most Recent DEP Training Attended Location Date EXPEDITED REVIEW PROCESS In addition to the certification required above applicants using the expedited permit review process must attach an E&S and PCSM/Site Restoration Plan developed and sealed by a licensed professional engineer, surveyor or professional geologist. The plans shall contain the following certification: I do hereby certify to the best of my knowledge, information, and belief, that the Erosion and Sediment Control and PCSM/Site Restoration Plan and Post Construction BMPs are true and correct, represent actual field conditions and are in accordance with the 25 Pa. Code Chapters 78 and 102 of the Department’s rules and regulations. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment. 12. Permit Renewals Is a permit renewal being requested? If yes all of the following must be completed: Yes No a. Administratively complete, signed, and notarized Notice of Intent Form, including Items 1-8. (1 signed original and 2 copies of the NOI/application) b. Permit filing fee of $500 plus $100/Acre of earth disturbance payable to the appropriate Clean Water Fund. -3-