Questions for Construction Module 1. What is the most common pollutant discharged from construction sites? a. b. c. d. lumber concrete washout sediment trash 2. What is the process in which soil particles become detached from the soil surface by water or wind? a. b. c. d. sedimentation siltation erosion aggradation 3. How do you calculate surface area under the LUP permit? a. b. c. d. Width of trench Length of pipe Stockpiles All of the above 4. What type of permit is required for land disturbances greater than once acre? a. b. c. d. General land disturbance permit General Construction Permit General Stormwater permit Erosion Permit 5. Storm Water Pollution Prevention Plans are required: a. b. c. d. for projects that discharge to sensitive water bodies on the job site during all phases of construction to be provided by the Regional Board before the start of construction to be read by primary contractor daily 6. Best Management Practices would NOT include: a. b. c. d. Silt fence around perimeter of site Gravel installed at exit points Covered stockpiles Washing down sediment in catch basin 7. What is the most appropriate BMP for this site as shown by this photo? a. b. c. d. Washing down street to remove sediment Stabilized entrance/exit Asphalt ramp Install sand bags in the gutter 8. Dewatering of a construction sites as shown by this photo: a. b. c. d. is allowed as long as adequate filtration occurs prior to discharge is an exemption under the permit regulations should be reported to Regional Board prior to discharge is allowed if you have no other option 9. The SWPPP must contain all the following except: a. b. c. d. Site map Grading permit and building permits Monitoring locations BMPs 10. The Water Quality Management Plans: a. b. c. d. cover site, source and treatment control BMPs cover temporary construction BMPs replace the SWPPP document are not needed after construction ends Answers Construction 1. (c) 2. (c) 3. (d) 4. (b) 5. (b) 6. (d) 7. (b) 8. (a) 9. (b) 10. (a)