SAMPLE LETTER FOR WAIVER REQUEST FROM EROSION AND SEDIMENT CONTROL PLAN From: Date: Erosion & Sediment Control Division Boise City Planning & Development Services 150 N. Capitol Blvd. Boise, ID 83701 Attn. Erosion Control Manager: ………. (Company Name) has applied to the City of Boise for a building permit to (brief description of work) ………. located at (address) …….. Please refer to building permit number BLD1?-00000 (if a building permit is applicable). We are requesting a waiver from the Erosion and Sediment Control Plan submission requirements. This project will occur within the confines of a chain link yard area and in an area that is currently paved. This construction project consists of the following scope of work (Be site specific with actions. Describe BMP’s being used) ………………… The reason for this request is that any excess soils from the excavation process (give a description of what will occur with excess soil)…….. The existing on-site drainage will remain just as it currently is when the project is completed. Illicit discharges will not be discharged into U.S. waters, including, active and intermittent canals, or the MS4. No soil or other construction materials will leave the site. All construction activity will be confined to the internal site. Thank you for considering this request for waiver from the plan requirement. Please call if any additional information is needed. You can reach me at (phone number). Sincerely, Name and Title