Request for Qualifications (RFQ) Engineering and Project Management Services Twin Bridge Replacement Project The Town of Bayfield requires the services of a Professional Civil Engineering firm (the “Consultant”) to provide civil engineering, environmental, and project management services. This project will include federal funds through the Colorado Department of Transportation (CDOT) Off System Bridge Program. SITE WALK-THRU – November 15, 2013 (Friday) at 3 p.m. Submittal Due – November 29, 2013 at 4:00 PM Mountain Standard Time Eligibility -- The Consultant will assist the Town of Bayfield throughout the design and construction of the project. Candidates will be evaluated based on experience, technical merit, construction management, environmental permitting experience, familiarity and experience with Colorado Department of Transportation (CDOT) off-system bridge program, and qualifications. Qualifying applicants should have experience on projects of a similar size, complexity and scale. The project is funded (estimated $3.0 M) but not permitted. The targeted start date is mid-summer of 2014. 1. Site Description – The Town of Bayfield is located in eastern La Plata County, Colorado. The Town of Bayfield recently acquired the ownership, and consequently the maintenance responsibilities, of former US Highway 160B, now referred to as Bayfield Parkway. Bayfield Parkway crosses over the Los Pinos River just west of downtown Bayfield. The river crossing consists of two bridge structures; one structure over the main channel of the Los Pinos River, and a second structure over an overflow channel of the River. The overflow bridge is located at mile post 0.96 on Bayfield Parkway and has a main span of 100’ with two 40’ approach spans utilizing a half through truss configuration. The bridge has a width of 24’ from curb to curb and a pedestrian walkway on the south side of the bridge. The bridge that crosses over the main channel is 325 feet to the east of the overflow bridge. The main bridge is a half through truss configuration with a 100’ main span and two 30’ approach spans with a 24’ curb to curb width. Currently there is a gas line, sewer line, and a telecommunications line hanging from the bridge structure. A 14” water line and a fiber optic line were recently installed under the river bed within the road right-of-way. These bridge structures, built in 1931, have reached the end of their design life and as a result would need significant improvements to bring the structures up to current standards and require significant maintenance on a regular basis in the future to maintain safe and reliable river crossing structures. The Town commissioned Souder Miller & Associates to prepare a Hydraulic and Structure Evaluation Report for the Los Pinos River Bridge Crossings completed in September of 2012. The Report recommends the replacement of the existing bridges with CON/SPAN structures. 2. Scope of Work –The work requires management of a multi-disciplinary team for the design, engineering, construction, plans and specifications, construction management, cost estimating, environmental permitting, grant tracking, monitoring and reporting and all work required to complete the construction of two new bridges on time and within budget. 1. The Consultant will be responsible for the overall management of the project. 2. The Consultant will be responsible for design of the project. 3. The Consultant will be responsible for implementing permit conditions. 4. The Consultant will be responsible for meeting budget(s). 5. The Consultant will be responsible for monitoring, tracking and reporting the requirements for the use of CDOT Off-System Bridge money. ASSUMPTIONS / ADDITIONAL INFORMATION The Town would like to keep traffic on the bridges open for emergency vehicles, and Town residents during construction, but willing to consider closure. Consultant would help evaluate options for closure. An Army Corps of Engineers permit is required. Bridge will be re-constructed within the 100 foot existing ROW. Town desires to include a 10’ bike/walking path under the main channel bridge to tie existing parks together. (see Section 7) 3. Evaluation Criteria -- The consultant will be evaluated and ranked based on experience and technical merit. Added consideration will be given to those applicants who have successfully completed similar projects. If an acceptable work plan, budget, schedule, and contract cannot be developed, the selection panel will meet and select another consultant from the original RFQ submittals and re-start negotiations. EVALUATION CRITERIA and WEIGHTING Bridge Design and Construction Experience ……........................... 25 points Construction Management and Inspection Experience.....................25 points Effective Communication .................................................................20 points Qualifications of Project Staff ..........................................................15 points Permitting Experience.......................................................................10 points References ........................................................................................ 5 points 4. Submittal Requirements -- Proposals should provide adequate information to render the candidate qualified and capable of effectively accomplishing the project. -- Please include a list of names and contact information for recent work. Proposals must be received by 3pm Friday, November 29, 2013. Send (5 COPIES) to: Chris La May, Town Manager Town of Bayfield 1199 Bayfield Parkway, PO Box 80 Bayfield, CO 81122 All information is posted on the Town of Bayfield Website at www.bayfieldgov.org. Emailed submissions will not be accepted. Qualifications received after the deadline will be returned unopened. Limit submittals to 15 pages or less, not including resumes. Please include: PROFESSIONAL QUALIFICATIONS Experience and capabilities of proposed team members Related experience with bridge construction Construction management and inspection expertise Regulatory knowledge and experience Related experience with CDOT Off-System Bridge Program Site knowledge and its unique challenges Town of Bayfield reserves the right to enter contract negotiations with more than one proposer, and to select whomever the Town of Bayfield determines qualified to provide the most cost-effective professional services. The Town of Bayfield will have no financial, contractual or other legal obligation to any proposer until a written contract is fully executed by both parties. 5. Pre-Proposal Meeting -- A PRE-PROPOSAL site walk-thru is scheduled Friday, November 15 at 3 p.m. beginning at Town Hall, 1199 Bayfield Parkway, Bayfield, CO 81122 6. Schedule – Representatives from the Town of Bayfield will interview finalists in December. A final recommendation will be presented to the Board of Trustees for approval on January 7, 2013. The consultant may be asked to attend a special meeting prior to finalizing the agreement. 7. Additional Resources posted at www.bayfieldgov.org (see Announcements) Sample Consultants Services Contract Hydraulic Structure and Evaluation Report for the Los Pinos River Bridge Crossings – Souder Miller and Associates, September 2012.