23+ Years of Project Management, Engineering and Design Experience in the field of Instrumentation and Control Systems Rashesh M Shah Project Manager and Instrumentation Leader, Indcon Engineering Consultants Pvt Ltd Dahisar-West, Mumbai 400068 + 91 22 28918453 indconengg@yahoo.co.in Work Summary ► ► ► ► ► ► ► ► ► 23+ years global experience in Petrochemical, Oil & Gas, Steel, Cement and other Process industries Project Management, Planning, Scheduling and Cost control for green field and revamp/Control Systems upgrade projects Engineering, Design and Project Execution for Instrumentation, DCS, PLC, SCADA and other Automation projects Specialization in Control Systems, DCS and ESD System upgrade projects Cost/Man-Hour Estimates and Feasibility studies ITB Preparation, Procurement services and Construction supervision Selection, Sizing and Specifications of Field Instruments, Control valves, Analyzers, Safety systems, PLC and DCS systems Execution Experience with major DCS systems (like Honeywell, Yokogawa), PLC systems like (Modicon, Yaskawa, Triconex, Honeywell ESD systems) and SCADA systems (like AFE etc.) HAZOP studies and Safety Analysis for process plants Publications ► ► ‘Process Control using PLC' At National Symposium on Current Trends in the Instrumentation organized By Bhabha Atomic Research Center. 'Stock House Automation using PLC - A Case Study' at Bhilai Steel Plant during Indian Steel Industries Exhibition & Seminar organized by Indian Institute of Metal. Training/Special Assignments ► ► ► ► ► ► ► ► ► ► Yokogawa Centum CS3000 DCS system, Jubail, Saudi Arabia Triconex TMR ESD System, Jubail, Saudi Arabia SAP System, Financial and Engg Project Management (PS Module) Jubail, Saudi Arabia SAP System, Investment Management (IM Module) Jubail, Saudi Arabia SAP System, Materials Management (MM Module) Jubail, Saudi Arabia CS3000 system FAT at Yokogawa, Singapore Application Software FAT at Oxy-Vinyl, Houston, Texas, USA Engineering and design review at Mustang Tampa, Florida, USA Engineering and Design review at KTI, Zotermeer, the Netherlands Modicon – 984/U84 Series PLC System, Mumbai, India Rashesh M Shah – Resume’ Page # 1 of 4 ► AFE IC2X series SCADA System, Mumbai, India Professional ► ► Bachelor of Engineering – Instrumentation and Control, Graduated in 1983, first class with Distinction Membership of Instrument Society for Measurement & Control (ISA) Work Experience April 2006 - Present: - Indcon Engineering Consultants Pvt Ltd, Mumbai, India Promoter and Director of Indcon Engineering Consultant Pvt Ltd March 1995 – March 2006: Arabian Petrochemical Co. (Petrokemya)/ SABIC - Shared Services Site Project Management- Al Jubail, KSA Petrokemya is a wholly owned subsidiary of Saudi Basic Industries Corporation (SABIC) having three world scale Ethylene crackers (1 MMTPA each) producing major petrochemical products like Ethylene, Polyethylene, PVC, VCM etc ► ► ► SABIC Shared Services – Site Project Management team member for Project management, Cost control and execution of various SABIC Affiliate Projects working in Plant Engineering (PLE) Department as Sr. Control Systems Engineer responsible for project management and execution of various in-house projects Active member in company Quality (TQM) program and Suggestion schemes Major Projects handled: ► Project Leader for Olefins and PVC Plant APC Project: ◘ Advance Process Control (APC) system and real time optimization for 1 MMTPA Olefins-III, Benzene and Butene-1 plant and 300000 TPA PVC plant. Honeywell Profit Controller is APC supplier. ► Ethane gas Custody Meter for feed from Saudi Aramco ◘ Engineering, Design and Project management of 24” size Ultrasonic Flow Meter (UFM) skids for Custody metering skid ► Propane Liquid Custody Meter for feed from Saudi Aramco ◘ Engineering, Design and Project management of 16” size Turbine meter skid for Custody metering skid with meter prover. ► Project Leader for PVC DCS Upgrade Project: ◘ Process Licensor – Oxy Vinyl (Formerly GEON) ◘ Project Management and Coordination among the Operations dept of Petrokemya, Yokogawa Singapore, Oxy Vinyl USA ◘ Replacing 20 year old Foxboro Spec 200, HIMA PLC and Modicon Process computer system with Yokogawa Centum CS 3000 DCS and Triconex TMR based ESD System. Rashesh M Shah – Resume’ Page # 2 of 4 ◘ ◘ ◘ ◘ ► 6000 + I/O Signals Upgrade and Integration of other sub systems like Area Monitoring, Gas Detector, Fire Alarm, UPS system etc. Challenging Execution Schedule, Concept to commissioning successfully completed in 16 months. Coordinated with Mustang Tampa, USA for PVC debottlenecking project to incorporate all instrumentation related design with the DCS upgrade project Project Engineer for following major PLE projects (Project Cost ranging between SAR 100,000 to SAR 35 Million): ◘ ◘ ◘ ◘ ◘ ◘ ◘ ◘ Utility Burner Management System (BMS) Upgrade Project Olefins III # 3 Butene-1 Control System Tie-In Olefins III Additional Flame Scanner Olefins-II Acetylene reactor Modifications Olefins-I 3rd Cracked gas Dryer Olefins-II/III Replacement of Flare Tips Olefins-II New Green Oil Separator Numerous other Affiliate projects ranging between SAR 100,000 to 1 Million. June 1998 – February 2000: ► Olefins III Furnace Project: ◘ ◘ Responsible for Instrumentation Engineering, Design, Installation and Commissioning of Olefins-III Furnaces (Green-field Ethylene Project) Assigned to KTI (Furnace technology supplier), Holland office for review and approval of Engineering and Design October 1995 – November 1997: ► Olefins II Furnace Expansion Project: ◘ ◘ Responsible for Instrumentation Engineering and Design of Olefins-II Furnace worked with PLE Department on several in-house projects including Industrial Security System, PVC Chilled water system, Polystyrene Hot Oil Heaters, Olefins II Boiler Feed water pump, Utility Sea Water Pump, # 1 Butene-1 Existing Compressor control system, Industrial waste water system etc. June 1993 – October 1995: Radicon Gulf Consult, Al-Khobar, KSA Worked as Lead Instrument Design Engineer. Major Projects Worked on are: ► Glass Fiber Project, Jubail, KSA ► Emergency Back-Up SCADA system, SCECO-East, Dammam ► Saudi ARAMCO projects at Rastnura and Abqaiq Rashesh M Shah – Resume’ Page # 3 of 4 April 1992 – April 1993: Saudi Arabian Kent/ACEC, Al-Khobar, KSA ► Saudi ARAMCO Berri Gas Plant DCS Upgrade Project Worked as Lead DCS Engineer ◘ ◘ ◘ ◘ Existing Foxboro Spec 200 system and Square-D PLC upgraded with Honeywell TDC3000 DCS and Triconex ESD system. Responsible for Plant 471 DCS Upgrade Developed Standard Hardware Design Schematic and Software Database standards. Prepared DCS Database for the plant January 1987 – March 1992: Larsen and Toubro Ltd, Mumbai, India Worked as Systems Design Engineer for Gould Modicon 984/U84 PLC and AFE IC2X SCADA Systems. Responsible for Concept to Commissioning of Automation projects which includes Project Management, Cost and Schedule Control, System Design, Writing software/application programs, System assembly, Installation and Commissioning. Major Projects Worked on are: ► ► ► ► Steel Plant Automation Cement Plant Automation Burner Management System and Boiler Interlocks for Power plants Digester Automation for Paper Plants June 1983 – January 1987: Humphrey’s and Glasgow Consultants, Mumbai, India Worked as Instrument Design Engineer for UK based major engineering company Major Projects Worked on are: ► ► ► ► ► IPCL - Ethylene Cracker Revamping IDL - P.E.T.N (Detonator) Plant Reliance – Polyester Filament Yarn Project GHCL – Soda Ash Plant Larsen and Toubro – Cement Plant Rashesh M Shah – Resume’ Page # 4 of 4