Infrastructure, Hardware, Technical Support, and Software CRITERIA 5 / INFRASTRUCTURE, HARDWARE, TECHNICAL SUPPORT, AND SOFTWARE COMPONENT Pacheco Union School District has beyond meeting the everyday needs of the district, been committed to supporting schools Infrastructure, hardware, technical support, and software needs within the district as the funding, time, and opportunity arises. The District has committed E-Rate, Modernization, API, Grants, Deferred Maintenance, parent group funding, general funds, and donations, literately anything we can get our hands on toward supporting this every expanding black maw of spatial consumption. The monthly Technology Committee (comprised of administrators, teachers, parents, and invited community partners), determines and plans the direction of technology in our district. PUSD is committed to the following: Upgrade the existing Local Area Networks on each school site, removing problem wiring, and bring the existing system up to code. Increasing access to the LAN by adding more cabling in each classroom. Working toward providing updated school labs for student’s access. Planning and implementation of a Network system that allows for the increase of workstations in every classroom. Maintaining and upgrading existing equipment and software that supports our network and applications. Improving communication between the parents, staff, or employees and our offices by modernizing and upgrading existing communication systems. D1. Hardware All computers must meet technical requirements necessary for networking and multimedia applications. Hardware needs to meet the professional development, educational and or management needs. Hardware needs to be purchased from approved vendors with minimum hardware specifications. District computers need to be able to access all District recommended multimedia software. In addition computers need to be able to access the District Internet and Intranet via Ethernet. Each school will have a minimum of 1 computer per 10 students. Each classroom will have computers to allow for exploratory, production and presentation centers. The classroom resides will have - 38 - assess to a centralized networked printers. Each computer will be capable of printing to the networked printer. In addition the classroom will have a presentation system). The schools will do everything to maintain this ratio. Through a yearly analysis of the school’s hardware database, by the District’s IT department, a recommendation of hardware purchases will be given to the school. Installation and setup of these computers will be done by the District’s IT department. Students have access to computers both in the classroom and in the library to accomplish the goal of integrating technology into the core curriculum. During the school day, students are able to access computers in the classroom or at the library during designated periods. In addition, the goal of providing students access to computers after school is accomplished through library or lab. Each Library and lab is available to all students. Teachers bring their students during the day to access a variety of technologies and technology resources. Teachers may use those centers for the goal of providing students an opportunity to use unique learning resources from a technology integrated core curriculum. The will be funded using money from PLA-98. Sites and District personnel purchase hardware through a specific process. The schools requisition hardware based on District standards, appropriate hardware vendors and specifications. Hardware specifications and authorized vendors can be accessed via District’s email system or the District’s technology purchasing agent. Once hardware is delivered a process for installation by the IT department is initiated. The District’s IT department upgrades and installs all hardware and software. Hardware needs to be replaced at a regular interval. When computers are no longer able to access District resources and run necessary software, computer hardware will be replaced. The cost of the repair will be School Sites responsibility until the hardware no longer meets the District’s minimum standards. When computer hardware is no longer able to access District resources and run necessary software, computer hardware will be replaced by the site. 3.2. Goal statements for hardware: Goal 1 of 2: The schools will have the hardware necessary to implement the educational programs and to teach the grade level standards. 3.2.1 Objective By June 2007, 100% of sites will have the designated hardware configuration per classroom. School site will have a 10:1 ratio of students to computer ration per classroom, presentation units, and network printers for each school. Benchmark statements for hardware: 3.2.1.a By June 2003,100% of sites will have the designated hardware configuration per classroom, (a 10:1 ratio of students to computer). 3.2.1.b By June 2004, 100% of sites will have the designated hardware configuration per classroom, (a 10:1 ratio of students to computer, and network printers). - 39 - 3.2.1.c By June 2005, 100% of sites will have the designated hardware configuration per classroom, (a 10:1 ratio of students to computer, and network printers). 10% of the classrooms will have presentation equipment. 3.2.1.d By June 2006, 100% of sites will have the designated hardware configuration per classroom, (a 10:1 ratio of students to computer, and network printers). 20% of the classrooms will have presentation equipment. Responsible Dept. or Position Budget Source* Implementation Plan/Activities Timeline Objective 3.2.1.e By June 2007, 100% of sites will have the designated hardware configuration per classroom, (a 10:1 ratio of students to computer, and network printers). 30% of the classrooms will have presentation equipment. 3.2.1 Secure funds for hardware District IT Annually School 3.2.1 Purchase Computers District IT Purchasing Annually School District IT 3.2.1 Provide each classroom with the hardware necessary to allow for the equitable access to multimedia technology resources, applications, printing and presentation tools by June of 2007 and measured through site surveys. 3.2.1 Add Additional Ethernet drops and switches Annually Site funds, potential grant sources (TLC grant/others) District IT District IT Modern. Def. Maint. District IT School Site - 40 - Monitoring and Evaluation activities Analysis of funding sources applied for and secured. Analyze reports from Database of inventory Analyze reports from Database of inventory Use Network analyzer to determine functionality 3.2.1 Install Computers onto Network, setup presentation stations, and setup printing District IT Monitoring and Evaluation activities Budget Source* Responsible Dept. or Position Timeline Objective Implementation Plan/Activities District IT and Site Tech Assessment of inventory database which shows all computers have been installed Objective 3.2.2 by June 2007, the library will be evaluated as determined by the Library Committee’s reports and evaluations. Benchmarks 3.2.2.a By June 2003, the district’s library plan will be implemented, and evaluated. 3.2.2.b By June 2004, the district’s library plan will be implemented, and evaluated. 3.2.2.c By June 2005, the district’s library plan will be implemented, and evaluated. 3.2.2.d By June 2006, the district’s library plan will be implemented, and evaluated. 3.2.2 Purchase Hardware O b j e c t i v e 3.2.2 Add Additional Ethernet drops, switches, and Fiber Backbone District Librarian, DTC District Librarian, DTC District IT Implementatio Responsibl Budget Source* 3.2.2 Secure funds for hardware Responsibl e Dept. or Position Timeline Implementatio n Plan/Activities Annually School PLA-98 Annually Monitoring and Evaluation activities Analysis of funding sources applied for and secured. School Analyze reports from PLA-98 Database of inventory District Use Network analyzer IT to Modern. determine functionality Def. M. T i m e l B i u n d e g e t S o u r c e * Objective 3.2.2.e By June 2007, the district’s library plan will be implemented, and evaluated. Monitoring and - 41 - n Plan/Activities 3.2.2 Install Computers onto Network, setup presentation stations, and setup printing 3.2.2 In-service staff and students District IT and site Tech comm.. e Dept. or Position Evaluation activities District IT Assessment which shows all computers have been installed and are functioning. District IT Teacher’s survey and actual library media center usage will be analyzed by site Tech committee Benefits from hardware: The hardware will provide equal access to educational opportunities and resources through technology. The classroom configuration will allow teachers and students to communicate with others, access resources, and share information in an effective way. The COW program allows whole classrooms to participate in technology based projects so that students have the necessary time to adequately learn the concepts, themes, and information. In addition, the library media center allows for students to have greater access to learning materials by extending the time and educational learning resources in which students may use. School Site Technology Inventory - 42 - The following inventory identifies required components for both section 5. a. and 5. b. of this section: With Internet Connections Multimedia Computers Pacheco School Prairie School District Office All Other Computers: BusBarn, staff room & Cafe Without Internet Connections In Classrooms In Computer Labs L L D TC D 111 1 L 37 22 TC L D 111 Multimedia Computers With Internet Capabilities Multimedia Computers Without Internet Capabilities All Other Computers 1 L D 59 84 26 D TC In Shared or Common Space (e.g., library) L 10 3 D 59 84 26 37 22 L D 17 4 TC TC In Administrative Offices 13 1 1 TC L 3 3 5 4 4 D TC 17 4 10 3 TC 13 1 1 3 3 5 3 apple IIe’s Site: In Classroom In Computer Lab Desktop Computers Person or Title Responsible for Desktop Workstation Acquisition/Installation: - 43 - In Shared Space (e.g., library) In Admin. Offices Year Use as is 2002 2003 2004 2002 111 59 2003 2004 2002 17 2003 2004 2002 13 2003 2004 Upgrade 0 0 0 0 0 0 2 0 0 0 1 1 To be retired when new or upgraded equipment is available Number needed Pacheco Prairie Laptops 0 0 0 0 0 0 0 0 0 0 0 0 160 72 17 17 17 17 17 3 3 3 3 3 3 Person or Title Responsible for Laptop Workstation Acquisition/Installation: Year Use as is 2002 2003 2004 2002 1 2003 2004 2002 3 2003 2004 2002 3 2003 2004 Upgrade 0 0 0 0 0 0 0 0 0 0 0 0 To be retired when new or upgraded equipment is available Number needed Admin Pacheco Prairie Thin-Client Units Year Use as is 0 0 1 0 0 0 0 0 1 0 0 1 3 20 18 Person or Title Responsible for Thin-Client Workstation Acquisition/Installation: 2002 2003 2004 2002 2003 Number needed PERIPHERALS - 44 - 2004 2002 2003 2004 2002 2003 2004 Peripherals Number on Hand Digital cameras Scanners/digitizers Alpha Pro’s Alpha Pro’s Gooseneck Microscope to monitor Assistive/adaptive devices Printer VCR unit Computer screen projector (e.g., LCD) Video conferencing unit Gate/Library Unger Library Unger 58-Pacheco 8-Prairie 1-Pacheco 27-Pacheco 17 -Prairie 28-Pacheco 17 - Prairie 1-Pacheco 90-Pacheco 90-Prairie Site Admin Site Admin D’Amato Site Admin Site Admin Site Admin Site Admin Yearbook/Burhans 2-Pacheco 2-Prairie 25-Pacheco 17 - Prairie Site Admin Site Admin 1-Pacheco 21-Pacheco 1-Library Dist 20-Prairie 0 2 Burhans Library Site Admin 1-Pacheco Burhans 2-Pacheco 2-Dist 22-Pacheco 20-Prairie 20-Pacheco 19-Prairie Burhans/Admin Evans/Admin SITE NETWORKS AND CONNECTIVITY Is the school site connected to the Internet by a permanent (non-dial-up) connection? Yes No If so, how is your school connected to the Internet? ISDN Frame relay ATM/DS3 Cable-modem Fractional T-1 ATM/SONET OC3 xDSL Full T-1 Microwave Wireless (not microwave) Other, please specify: _____________________________________ Do you know the speed of your connection? less than 56K bps 128 K bps Person or Title Responsible 4 4 Interactive white board Personal digital assistant Proposed Purchase Date 1 – Pacheco 1 - Prairie 2 – Pacheco 1 - Prairie Video camera TV monitor Graphing calculator Number Needed Yes 30M bps 40M bps 1.5M bps 5M bps - 45 - No 256 K bps 384 K bps 512 bps greater than 40M bps 20M bps 15M bps 20M bps What is the total number of classrooms that are connected to the Internet by a permanent (non-dial-up) connection? ____39____________________ Currently Connected to the Internet Need to be Connected to the Internet Currently Connected to a LAN Need to Be Connected to a LAN Number of Classrooms Average Number of Drops/Classroom Number of Administrative Offices 39 2.5 drops K-3 7 drops 4-8 6 0 39 0 0 6 0 Who is the school’s Internet service provider? District office County Office of Education California State University/University of California Commercial provider (e.g., Earthlink, MCI, Sprint, etc.) SITE TELEPHONE SYSTEMS Number of lines: _Pacheco – 6 Praire-3 DO-5_________ SITE LIBRARIES Days and Hours that the site library is open: _____See Appendix I_ - 46 - Baseline Workstation Requirements For Future District Planning Future workstation purchases at Sample Unified School District will follow the minimum specifications outlined for both Windows and Macintosh Platforms. Workstation Requirements: Windows Operating System 95, 98, NT, ME or Windows 2000, XP Processor Speed 120 MHz or faster Memory 16 MB RAM Browsers Netscape 4.0 (+), Internet Explorer 4.0 (+) Browser Plugins Adobe Acrobat Reader, Flash, RealPlayer Internet Connection 56 kbps or faster Sound/Video Card Required CD-ROM Required Monitor 14" (800 x 600) resolution, 256 colors or higher - 47 - D2. Software The District is implementing a complete process for inventorying, selecting, purchasing, installing and monitoring software that meets the educational, legal and technical standards. The District maintains standardized software systems in business, student, database, spreadsheet, word processing, email, grade book, language arts assessment software, and browser. The District standards are the following: Aeries, MS Office, Measures, IE5, MS Works, Athena. When changes are necessary, the District’s technology planning committee provides recommendations. The Administration authorizes new District standards. For software needs beyond the District standards, site committees will provide additional recommendations based on the District’s scope and sequence as well as technical requirements. On all new computers, a software package of District-needed software is ordered and installed upon delivery. The price of the software is automatically included at the purchase of the computer. In addition to adding new software resources, presently, schools have access to a variety of software learning resources already at their campus. At the 4th-8th school level, students may access specific network math courseware (Accelerated Math, Star Math, Edmark: [Algebra, Calculating Crew, Number Heroes],, MathBlaster, Sunburst: [Icecream Truck, Hotdog Stand, How the West was 1x2x3, Math Arena], and Math for the real world),that provides Computer Assisted Instruction. LA Courseware (Hough Mifflin and Glencoe) that provides tutorials and individualized Computer Assisted Instruction in the area of reading. At all schools in the District, students are assessed electronically through the Accelerated Reader and Star Reader software. This software not only assesses reading level but provides feedback to parents and recommended action steps that need to be taken with the student. Specialized software for the 4th-8th includes Perfect Copy, All the Right Type and lab sets of software listed in Appendix J. The site will establish a technology committee that will include the Site Technology Trainer. (Each site will identify either one or two software trainers who receive a stipend for training, and monitoring software at the school.) When new software, such as courseware, is needed, the committee will review the software based on content standards, District’s technology scope and sequence, school site plan, and technical requirements to determine if the software is appropriate. This committee will publish site software standards and recommendations. After software is reviewed by the site technology committee, software is requisitioned and a copy of the purchase requisition is sent to the District’s IT department. After the technology purchasing agent reviews the requisition, the purchase order is processed through the regular channels. When the software is received by the District, the licensing information is recorded and supporting licensing documentation is maintained by the IT department. The software is installed by District’s IT department and/or the site’s Software Trainer. The physical media is brought to the library where the librarian barcodes it, enters data such as the number of licenses into database and, if necessary, checks-out the software to the appropriate teacher. - 48 - All software licenses are inventoried at the District level through the District’s IT department. Physical software media (like CD’s) are barcoded and placed at the site’s library or library media center to be checked-out. The librarian or aide barcode the materials and enter records about the physical media into the database. When software needs to be reinstalled or moved to another location, the software is checked back in at the library and removed from the harddrive (if necessary). The librarian checks- out the software to the new person; the Software Trainer or District IT is responsible for installing the software on the new machine and checking to see that the software installs hasn’t exceeded the number of licenses. In addition to the checks and balances by the Software Trainers and the District IT, each site will have an electronic means for insuring legal software compliance. Each site will have a server based system that will ensure client workstation compliance. The server will ensure that only authorized copies of software are installed and used. If software needs to be changed to a different computer, the Software Trainer is informed and the software is reissued or checked-out to the new teacher via the library’s circulation system. The Software Trainer reinstalls the software and makes necessary changes in the server-based system. 3.4. Goal statements for software: Schools will use a process for selecting, installing and using software that aids students in the achievement of grade level standards and increases District efficiency. Objective 3.4.1 By June 2007, 100% of sites will have the Districts standardized computer software installed on their computer. Benchmark statements for software: 3.4.1.a By June 2003, 60% of sites will have the Districts standardized computer software installed on their computer 3.4.1.b By June 2004, 70% of sites will have the Districts standardized computer software installed on their computer 3.4.1.c By June 2005, 80% of sites will have the Districts standardized computer software installed on their computer 3.4.1.d By June 2006, 90% of sites will have the Districts standardized computer software installed on their computer 3.4.1.e By June 2007, 100% of sites will have the Districts standardized computer software installed on their computer - 49 - Objectiv e Implementation Plan/Activities Responsible Dept. or Position Timeline Budget Source* 3.4.1 Secure funds for Software District IT Ongoing General Analysis of funding Fund sources applied for and secured. 3.4.1 Purchase Software District Purchasing Ongoing General Analyze reports Funds from Database of inventory 3.4.1 Publish Software standards District IT Jan of 2004 General District IT Funds department 3.4.1 Inventory and record District IT licenses into database budget 3.4.1 Install Software onto District IT computers District IT dept. Jan of 2005 Ongoing 3.4.1 Train Users in the use of the software Annually District budget Surveys and sign-in sheets at trainings 3.4.1 Install minimum District standardized IT software package for all business and educational computers and establish a process forselecting new software tools Annually District budget IT dept Data report analysis District IT - 50 - Monitoring and Evaluation activities District IT General Assessment of Funds inventory which shows all Software have been installed and is functioning Objective 3.4.2 By Jan 2007, 100% of sites will be using the District’s formal process for selecting and purchasing new software. Benchmarks 3.4.2.a By June 2003, sites will be begin the process for formal process for selecting, purchasing and implementing new software. 3.4.2.b By June 2004, sites will formalize the process for selecting, purchasing and implementing new software. 3.4.2.c By June 2005, sites will implement the formal process for selecting, purchasing and implementing new software. 3.4.2.d By June 2006, sites will implement the District’s formal process for selecting, purchasing and implementing new software. Implementation Plan/Activities District IT Annually General Analysis of Fund funding sources applied for and secured. 3.4.2 Purchase and Inventory Software District Purchasing Annually General Analyze reports Funds from Database of inventory 3.4.2 Identify Site School Technology Committee School 3.4.2 Provide Training to Site District IT Committee & STT 3.4.2 Setup software monitoring servers District IT - 51 - Budget Source* 3.4.2 Secure funds for Software Objectiv e Responsible Dept. or Position Timeline 3.4.2.e By June 2007, 100% of sites will be using the District’s formal process for selecting, purchasing and implementing new software. Monitoring and Evaluation activities Annually General sign-in sheets Fund Annually General Assess surveys Fund given to committee General Analyze server Fund logs Budget Source* Responsible Dept. or Position Timelin e Objecti ve Implementation Plan/Activities Monitoring and Evaluation activities 3.4.2 Establish a process for acquiring, installing, inventorying, and monitoring software that meets the educational, legal and technical needs of the District tools District IT Annually General IT meetings and fund site surveys 3.4.2 Install Software onto computers District IT Annually General Assessment of Funds inventory which shows all Software have been installed an is functioning Benefits from Software: There are benefits from acquiring new standardized software and implementing a new Software Program. By supplying staff members and educational leaders with the District Technology Plan standardized software tools, productivity can be increased through leveraging resources such as training and minimizing total cost of ownership. The educational needs can be met by aligning software choices with specific educational goals and standards. The new process will ensure that alignment between educational needs and software selection. In addition, legal and ethical guidelines will be followed so that the school District can maintain its integrity and legal duty by following its licensing obligation. D3. Infrastructure Through the District’s network, documents, resources, email, and printers can be shared. The District has 2 school sites that have a fully functional Local Area Network that is connected to the rest of the District through the District’s wide area network. This wide area network has access to the Internet through its Internet Service Provider, the Shasta County Office of Education. All school offices and all classrooms (all computers but 3 apple IIe’s), are able to access the Internet. The goal is to provide users access to a variety of network services and network resource for educational and management purposes. This purpose is accomplished through the - 52 - site’s LAN, WAN, Internet Connection and servers. Through services such as the District’s Intranet, users can access lesson plans, District forms, learning resources, community resources and student and business databases from the network. The District educational community can access their email, calendar and other educational resources from any computer that has Internet access. This includes access from users’ homes. The access to email, online professional development calendar, electronic calendaring system, and special District bulletin boards complement the other services provided by the District’s Intranet. The network is monitored on a regular basis by the District’s IT department. When maintenance or fixes are necessary the District’s IT department provides this function. Bandwidth usage on the LAN, WAN and Internet connection is monitored and assessed yearly through reports from a variety of technology tools. The server’s usage as compared to its capacity is also analyzed through reports generated from software analyzers. All of these functions and services are maintained and monitored by the District’s IT department and its budget. Students and teachers can explore other educational resources on the Internet with the protection of a filtering system. Within the District’s network, users are protected from violent, pornographic and other inappropriate Internet material through the District’s Internet content filter contracted through the County. The website is maintained by the District’s IT department. Necessary upgrades are funded through the IT Department’s annual budget. Through committee feedback, the web content is reviewed by administration and modified the District’s IT department. On a monthly basis, content is updated by the web programmer. Dynamic content will be updated regularly by Teachers and site secretaries. To further the goal of providing relevant learning resources and information to the community, school websites are being developed to better communicate relevant information to particular school communities within the District. The web programmer, STT, site Technology committee, Site Administrator and Education and Technology Coordinator will be working together to develop each school site’s website. These websites will benefit parents, students, teachers, administrators, and local communities of particular schools. This benefit will be from information that is more relevant and particular to each site’s needs. The District in conjunction with the County Office of Education maintains the network connectivity, network services and network security. To ensure the goal of network security both physical and electronic security are addressed and implemented by the IT department. Through a tiered approach, security is maintained. Passwords, IP Filtering, Firewall, Network Address Translation and Network Authentication are combined to build the network’s security. Physical security is addressed by maintaining cabinets and rooms that are locked. The District IT department will ensure that as additional switches and servers get installed, those network devices are stored in cabinets that are locked. Data is physically - 53 - secured by keeping backups of the data in a fireproof safe. Backups of data are also stored off site. Backups of all critical data will continue to be stored off-site. The District’s IT department will maintain, coordinate and fund the backup’s security. 3.1 Goal statements for infrastructure: Schools will have the infrastructure necessary to access educational resources, to increase the quality of instruction, and to promote student achievement through a reliable and speedy network. Objective 3.1.1 By June 2007, 100% of sites will have upgrades to their LAN, WAN, and Internet connection to increase the bandwidth and speed to utilize multimedia client/server programs and data management applications measured by analysis of data systems reports. *(LAN Speed to be increased to 100 mbs to desktop) *(WAN Speed to be increased to 10 mbs to utilize Internet II) Benchmark statements for infrastructure: 3.1.1.a By June 2003, 20% upgrade to site LAN, WAN, and Internet connection to increase the bandwidth and speed to utilize multimedia client/server programs and data management applications. 3.1.1.b By June 2004, 40% upgrade to site LAN, WAN, and Internet connection to increase the bandwidth and speed to utilize multimedia client/server programs and data management applications. 3.1.1.c By June 2005, 60% upgrade to site LAN, WAN, and Internet connection to increase the bandwidth and speed to utilize multimedia client/server programs and data management applications. 3.1.1.d By June 2006, 80% upgrade to site LAN, WAN, and Internet connection to increase the bandwidth and speed to utilize multimedia client/server programs and data management applications.. 3.1.1.e By June 2007, 100% upgrade to site LAN, WAN, and Internet connection to increase the bandwidth and speed to utilize multimedia client/server programs and data management applications. - 54 - Respon sible Dept. or Positio n Timeline Budget Source* 3.1. 1 Secure funds for infrastructure District IT annually Bond 3.1. 1 Prioritize sites for completion plan District IT Annually 3.1. 1 Purchase Hardware at sites to accommodate increased LAN and WAN speeds District IT 3.1. 1 3.1. 1 Contract with Vendors to install media Setup, install, test and configure all hardware District IT District IT 3.1. 1 Upgrade the network to accommodate the reliable, delivery of multimedia instructional technology as well as data management applications over the LAN, WAN, and Internet connection by expanding the capacity of the District’s network to increase speed and bandwidth to and within sites tools District IT Objective Implementation Plan/Activities Monitoring and Evaluation activities Analysis of funding sources applied for and secured Completed planning matrixes describing infrastructure completion timeline General Fund Inventory and analysis of items purchase vs. items needed using network maps/documentation Annually District IT budget Assessment which shows all sites have been completed and are fully functional Annual improvements General funds, IT budget Data systems report analysis - 55 - Objective 3.1.2 By June 2007, 100% of sites will have the expanded number of access points for the classrooms Benchmarks 3.1.2.a By June 2003, 20% expanded number of access points for the classrooms. 3.1.2.b By June 2004, 40% expanded number of access points for the classrooms. 3.1.2.c By June 2005, 60% expanded number of access points for the classrooms. 3.1.2.d By June 2006, 80% expanded number of access points for the classrooms. Responsi ble Dept. or Position Budget Source* Implementation Plan/Activities Timeline Objective 3.1.2.e By June 2007, 100% expanded number of access points for the classrooms. Bond Monitoring and Evaluation activities 3.1.2 Secure funds to increase classroom nodes District IT Analysis of funding sources applied for and secured. 3.1.2 Prioritize jobs for completion plan District IT Annually 3.1.2 Contract cable/fiber runs. Install wireless hardware District IT Annually General Fund Assessment which shows all sites have been completed and are fully functional. 3.1.2 Expand the number of access nodes at each site to accommodate greater classroom access District IT Annual improvements General funds, IT budget Analysis of data systems reports Completed planning matrixes describing infrastructure completion timeline Benefits from Infrastructure Upgrade: There are three main benefits to the upgrades in the network. Students, staff and management will be able to access multimedia learning resources and large databases for increases in achievement, productivity and efficiency. In addition through increases in - 56 - network performance resources can be shared and leveraged. Finally, communication can be more effective through the asynchronous and multimedia communication made possible by high-speed networks. D4. Technical Support The District’s Information Technology Department (IT) provides support and maintenance for computer-related equipment used by teachers and staff. The Department will provide technical assistance for hardware, software, and network issues. The current ratio of User Support to computers is one support person for every 200 computers. As the number of computers in the District grows, the district will maintain that ratio. The service that is provided is evaluated through service ratings based on surveys. · IT Department will review submitted work orders to determine severity and priority. Once User Support personnel receive work orders for a site. · IT Department will visit each school once a week to address any current normal priority work orders for that site and resolve open work orders. · IT Department will determine if repairs are to be done in-house, contracted out, or handled through warranties. Project Development The IT Department will assign project status to any request that requires more than one full work day by a technician and is a new or improvement request. For any requests that are assigned a project status TSS will: · Assign Project leads and develop a Project plan that will include projected start and end dates. · Determine priority of the project in alignment with priorities established by the CBO, Principals, and Superintendent). · Coordinate all tasks that need to be completed by IT and other District departments. · Help to determine if outside resources/contractors will be needed to complete the project. · Provide follow-up service after the project has been completed. 3.3 Goal statements for technical support: School will receive professional and reliable technical support in order to maintain and support the educational programs in the schools. Objective 3.3 By June of 2007 all hardware and software problems will be resolved in a one-week period by the District’s IT support team and measured through site surveys. Benchmark statements for technical support: 3.3.a By June 2003, 20% of site technical problems will be resolved within a week by either fixing the problem or providing a loaner. - 57 - 3.3.b By June 2004, 40% of site technical problems will be resolved within a week by either fixing the problem or providing a loaner. 3.3.c By June 2005,60% of site technical problems will be resolved within a week by either fixing the problem or providing a loaner. 3.3.d By June 2005, 80% of site technical problems will be resolved within a week by either fixing the problem or providing a loaner. Implementation Plan/Activities Responsible Dept. or Position Timeline 3.3 Secure funds for additional User Support Person and loaner equipment District IT annually General Analysis of Fund funding sources applied for and secured 3.3 Post and Hire Additional User Support And Purchase loaner equipment Personnel 3.3 Develop Rotation Schedule so that sites get weekly support District IT Budget Source* Objectiv e 3.3.e By June 2005, 100% of site technical problems will be resolved within a week by either fixing the problem or providing a loaner. Monitoring and Evaluation activities Signed Paperwork at completion May of 2007 Site Surveys Benefits from technical support: Through technical support, students will be able to have greater access to learning resources because computer hardware will be functioning for longer periods. In addition productivity of support staff will be increased because technologies that assist them in their work will be functioning. In addition, with application support staff will be more efficient in their work. - 58 -