ERCOT TECHNICAL ADVISORY COMMITTEE (TAC) MEETING ERCOT Met Center / 7620 Metro Center Drive, Austin, Texas 78744 May 5, 2011; 9:30 a.m. – 3:00 p.m. Call-in Number: 1.888.894.0587 Participant Code: 248 528 1. 2. 3. 4. Antitrust Admonition ERCOT Board Update TAC Action Items from February Event Approval of Draft April 7, 2011 TAC Meeting Minutes (Vote) Protocol Revisions Subcommittee Report Nodal Protocol Revision Requests (NPRRs) (Vote): o NPRR264, Clarification of Nodal Protocol Requirements for Generators With Multiple Points of Interconnection o NPRR311, Correction of Wind Adjust Formula to Account for Daylight Savings Time o NPRR317, Clarification of Entity Responsible for Hydro Responsive Testing o NPRR318, Alignment of Nodal Registration Requirements with Current Registration Process o NPRR326, Adjust the Calculation of the Real-Time Settlement Point Price for a Resource Node o NPRR330, Change in Frequency of Five Protocol Required Audits from Annual to Periodic o NPRR350, Change to the Security Classification of the System Ancillary Service Capacity Monitor Dashboard – URGENT o NPRR352, Real-Time HSL Telemetry for WGRs – URGENT 5. 6. 7. 8. 9:30 a.m. 9:35 a.m. B. Jones S. Morris 9:45 a.m. 10:20 a.m. B. Jones 11:20 a.m. K. Patrick 11:25 a.m. K. Donohoo 11:40 a.m. D. McKeever 12:00 p.m. 12:45 p.m. Revision to List of Other Binding Documents (Vote): o Removal of Competitive Meting Guide o Removal of Generation Asset Aggregation Application Form Revisions to PRS Procedures (Vote) Revision Requests Tabled at TAC * NOGRR052, Conductor/Transformer Facility Rating (Vote) Retail Market Subcommittee Report* RMGRR097, Synchronization with NPRR291, Reduce the Comment Period for NPRRs and SCRs (Vote) Reliability and Operations Subcommittee Report * NOGRR056, Synchronization with NPRR291, Reduce the Comment Period for NPRRs and SCRs (Vote) PGRR006, New Planning Guide Section 6.5, Annual Load Data Request (Vote) PGRR007, New Planning Guide Section 6, Data/Modeling and 6.4, TPIT Report and Data Requirements (Vote) Lunch Commercial Operations Subcommittee Report* 5/5/11 TAC B. Jones B. Jones 1 Public 9. 10. 11. 12. Approval of COPS Vice Chair, Harika Basaran – Austin Energy (Vote) COPMGRR025, Synchronization with NPRR291, Reduce the Comment Period for NPRRs and SCRs (Vote) Review of IMM February 2, 2011 EEA Report to PUCT Wholesale Market Subcommittee Report* SCR764, Public Access to Select MIS Dashboards – URGENT Valley Import – Proposed New Maximum Shadow Price (Vote) ERCOT Operations, Planning, and IT Report Update on CFTC Issue Other Business Future Agenda Items o 2011 TAC Goals Adjourn Future TAC Meetings June 2, 2011 July 7, 2011 D. Jones E. Goff 1:00 p.m. 1:30 p.m. ERCOT 2:30 p.m. B. Jones 2:55 p.m. B. Jones 3:00 p.m. *Activity reports available for questions only. Voting items scheduled for discussion. Open Action Items from Previous Meeting(s) 12/03/09 - Review Protocols and the new definition of WGR as changed with PRR830, Reactive Power Capability Requirement, for any unintended consequences. 6/15/10 - No later than September 2011, provide ERCOT Board with evaluation of standard costs, verifiable costs and if there are alternatives. (See 6/15/10 Board discussion on NPRR225, Standard Cost Option in Responsible Party ROS/WMS TAC Verifiable Costs) 8/5/10 – Creation of operational checklist for Resource interconnection. ROS 10/7/10 – Develop alternatives to incent timely posting of comments. PRS 12/6/10 – Stabilization Action Items: o Review RUC Allocation Methodology & report back to March TAC o Review Ancillary Service Deliverability & report back to March TAC o Review Market Data Transparency SLA for possible improvements (originally assigned to NATF) o Review RUC reporting (originally assigned to NATF) 1/6/11 – Stabilization Action Items Assigned for Review: o Frequency of SCED o Use of ONTEST status o Settlement Point Price calculation and weighting issues o Treatment of constraints when Shadow Price Cap reached o Frequency of reaching the Shadow Price Cap 1/18/11 – ERCOT Board approved NPRR302, Correct Fuel Type Language for Mitigated Offer Cap; noted that NPRR302 provides a short term fix and requested TAC to track the issue, to provide a long term fix schedule and to provide update to March Board. 2/3/11 – Tabled NOGRR052, Conductor/Transformer Facility Rating, until NPRR is in process. 5/5/11 TAC 2 WMS WMS MIS UG MIS UG WMS TAC TAC Public 3/3/11 – Review treatment of Non-Spin units that were RUC’d, not needed to be brought online in Real-Time, but were then brought online because they had been RUC’d. 3/3/11 –Provide TAC monthly updates on SCR760 and Planning Go-Live progress. 3/3/11 – Review at April TAC the scope of ROS’s NERC Reliability Working Group. 3/22/11 – ERCOT Board request for TAC to review the actions taken by WMS ROS ROS TAC ERCOT (including Market Participants) surrounding the February event and the ERCOT Protocols and Operating Guides and make recommendations on appropriate changes that would make those actions, Protocols and Guides more efficient or appropriate. TAC should also consider the recommendations in the report “ERCOT Emergency Operation, December 21-23, 1989” and determine if the recommendations are appropriate and should they be implemented if not already implemented. 4/7/11 – review Valley Max Shadow Price Cap and Protocols 6.5.7.1.10; bring back recommendations to TAC. 4/7/11 – Request for ERCOT update on CFTC regulations at May TAC. 4/19/11 – ERCOT Board request for TAC to review the declining amount of fuel oil capacity which is able to back up natural gas units. 4/19/11 - ERCOT Board request for TAC to evaluate whether the Planning Working Group should approve the Seasonal Assessment recommended by the ERCOT Board Task Force on Operations. 5/5/11 TAC 3 WMS ERCOT TAC TAC Public