Six monthly Summary Reports

advertisement
SUMMARY REPORT ON
MINERAL EXPLORATION
(Separate form for each licence)
Mineral Resources Division
Exploration licence no.
Operator/manager
For six months ending
Prepared by
Date
Principal mineral sought
during reporting period
Telephone
(Nominate ONE only, e.g. Copper,
Copper-Gold, Gypsum)
Fax
Email
SUMMARY OF OPERATIONS
1.
2.
3.
Summarise the type of exploration activities undertaken, including: number and type of samples; line kilometres and type of surveys; number of holes
drilled and total metres (provide drilling statistics in table below); rehabilitation completed etc.
Using the table on the following page, provide an itemised statement of exploration expenditure incurred during the period (allowable expenditure items
are detailed in Earth Resources Information Sheet M05, Mineral exploration licences – general conditions, procedures and information, under
‘Expenditure requirements’)
If field activities are undertaken, attach an A4-size map showing location and type of activities within the tenement area.
TABLE – Drilling statistics*
Cored
Number of holes
Open (RC)
Total metres
Number of holes
Total metres
Open (other)
Number of holes
Total metres
* If more than one type of drilling occurred for a hole, please add the total metres for each type in the appropriate columns above. In such cases
the ‘number of holes’ should be allocated to the drilling type column accounting for the majority of metres drilled.
EXPENDITURE
Expenditure for period
(Add detailed statement)
Total expenditure for CURRENT LICENCE
$
$
Group
Management
Logistics
Item
Tenement mgt and reporting
Statutory fees
Food, accommodation and travel
Vehicle costs
Salaries
Insurance
Data review
Mapping
Geochemistry
Geophysics
(Where applicable, please
indicate if conducted by air or
ground)
Geological
Drilling
Remote sensing
Technical studies
Survey
Other
Land access
Project studies
and research
Detail
Employees
Consultants and contractors
(pro-rata across all projects)
Geological, structural, etc
Rock chip sampling
Soil/calcrete sampling
Biogeochemistry
Other:
Magnetic
(air/ground)
Radiometric
(air/ground)
Gravity
(air/ground)
Electromagnetic
(air/ground)
Induced polarisation (air/ground)
Magnetotelluric
(air/ground)
Seismic
Other:
Auger
RAB
Air core
Sonic
Rotary mud
RC
Diamond
Other:
Landsat
ASTER/multispectral
Aerial photography and DTM
Other:
Hydrogeology
Geotechnical
Petrology
Downhole (gyro/density/etc.)
Surface locations
Trench/costean
Site preparation
Rehabilitation
Sample assays
Native title negotiations
Aboriginal heritage survey
Environmental survey
Landowner negotiations
Compensation payments
Project development studies
Scoping study
Prefeasibility study
Feasibility study
University research project
Other
Subtotal
Administration
Total
(Please justify below)
Item:
Item:
10% of subtotal
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Download