SUMMARY REPORT ON MINERAL EXPLORATION (Separate form for each licence) Mineral Resources Division Exploration licence no. Operator/manager For six months ending Prepared by Date Principal mineral sought during reporting period Telephone (Nominate ONE only, e.g. Copper, Copper-Gold, Gypsum) Fax Email SUMMARY OF OPERATIONS 1. 2. 3. Summarise the type of exploration activities undertaken, including: number and type of samples; line kilometres and type of surveys; number of holes drilled and total metres (provide drilling statistics in table below); rehabilitation completed etc. Using the table on the following page, provide an itemised statement of exploration expenditure incurred during the period (allowable expenditure items are detailed in Earth Resources Information Sheet M05, Mineral exploration licences – general conditions, procedures and information, under ‘Expenditure requirements’) If field activities are undertaken, attach an A4-size map showing location and type of activities within the tenement area. TABLE – Drilling statistics* Cored Number of holes Open (RC) Total metres Number of holes Total metres Open (other) Number of holes Total metres * If more than one type of drilling occurred for a hole, please add the total metres for each type in the appropriate columns above. In such cases the ‘number of holes’ should be allocated to the drilling type column accounting for the majority of metres drilled. EXPENDITURE Expenditure for period (Add detailed statement) Total expenditure for CURRENT LICENCE $ $ Group Management Logistics Item Tenement mgt and reporting Statutory fees Food, accommodation and travel Vehicle costs Salaries Insurance Data review Mapping Geochemistry Geophysics (Where applicable, please indicate if conducted by air or ground) Geological Drilling Remote sensing Technical studies Survey Other Land access Project studies and research Detail Employees Consultants and contractors (pro-rata across all projects) Geological, structural, etc Rock chip sampling Soil/calcrete sampling Biogeochemistry Other: Magnetic (air/ground) Radiometric (air/ground) Gravity (air/ground) Electromagnetic (air/ground) Induced polarisation (air/ground) Magnetotelluric (air/ground) Seismic Other: Auger RAB Air core Sonic Rotary mud RC Diamond Other: Landsat ASTER/multispectral Aerial photography and DTM Other: Hydrogeology Geotechnical Petrology Downhole (gyro/density/etc.) Surface locations Trench/costean Site preparation Rehabilitation Sample assays Native title negotiations Aboriginal heritage survey Environmental survey Landowner negotiations Compensation payments Project development studies Scoping study Prefeasibility study Feasibility study University research project Other Subtotal Administration Total (Please justify below) Item: Item: 10% of subtotal Cost $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $