Safe Work Method Statement XYZ Surveyors Pty Ltd Traffic Hazards in Road Reserve Surveys Version 1 Page 1 of 2 Do not commence work if you think it is unsafe, use your common sense and err on the side of caution. Spend a few minutes each day prior to starting work to ensure all controls are in place. Warning: If the risk is assessed as high, Traffic Management is to be carried out by a company specialising in Traffic Management services. REF NO. DATE SITE LOCATION MANAGER /SUPERVISOR: 1. Select type of road1: Collector or Rural C Local Road Secondary or Rural A or B Arterial or Rural M Freeway 2. Select the posted speed limit of the road: Up to 60 km/h 70 km/h 80 km/h 90 km/h 100 km/h 110 km/h 3. Select the separation between personnel and traffic2: Less than 1.2 metres 1.2 metres to 3 metres 3 metres to 9 metres More than 9 metres 4. Select the duration of the survey job3 : No more than 5 minutes More than 5 minutes and not more than a day More than a day 5. Select weather conditions: dry wet low visibility windy other: 6. Record other hazards present4 : 7. By considering the above answers, assess the risk level5 by using the risk matrix below and record risk levels in the table on page 2: RISK MATRIX LIKELIHOOD CONSEQUENCE RARE COMMON MINOR LOW LOW MEDIUM SIGNIFICANT LOW MEDIUM HIGH MEDIUM HIGH HIGH LIFE THREATENING 1 OCCASIONAL Melways and VicRoads Country Directory will indicate the type of road by a colour scheme set out in the legend of these directories. 2 Separation refers to the minimum distance at any point in time any personnel may be from moving traffic during the work covered by this SWMS. 3 The Code of Practice requires more controls the longer the job is. 4 Such as hilly terrain, service stations, schools, narrow shoulder, pedestrians etc. 5 Please assess the risk level for each task of the job. Example of tasks include: work at the intersection of X and Y streets, taking measurement on the road at point X, crossing roads, using tripod along north side of X street etc. For long term works please refer to Risk Rating Table 5 of Code. If the risk level according to that table is high or very high, the Code has specific requirements. Safe Work Method Statement XYZ Surveyors Pty Ltd Traffic Hazards in Road Reserve Surveys Version 1 Page 2 of 2 Record of Risk levels Task Risk Task Risk Use the principles and diagrams identified in the Surveyor’s Field Guide To Safe Work Practices Within Road Reserves to assist in determining your control measures for short term works. Traffic Management Plan