f9e3b00f1da96d5f7389a7dd54725b08

advertisement
FEBIN BASHEER
febinmb@gmail.com
+966535743521
INSTRUMENTATION ENGINEER
PROFESSIONAL RESUME
EXECUTIVE SYNOPSIS
Highly accomplished professional with over 5 years of multifaceted experience in
Instrumentation Engineering. Possessing valuable insights, keen analysis and team approach
to implement best practices to achieve business excellence. Adept at working in high-pressure
environments with strict deadlines and multiple deliverables. Demonstrated ability to manage
human, financial and material resources towards achieving stated targets, to lead, motivate and
provide effective guidance to a team of professional and support staff. Superior
communications and interpersonal skills, multitasking with an ability to interact with a wide
range of people.
EDUCATION
Passed with first class in B.Tech - Electronics & Instrumentation Engineering from Government
Engineering College, Kozhikode under Calicut University, Kerala, INDIA.
SPECIAL SKILLS

Familiar with the IS codes RC Standards, SAUDI ARAMCO STANDARDS,ISA RP12.6,ISA RP
12.2.02,ISA TR12,ANSI MC96.1,IEEE 518,IEEE 1100, IEC 60529, API, UL, ANSI, ASTM,
ASME, AEIC, ICEA, NEMA ICS6,NEMA 250,NEMA VE1,NEMA VE 2,NFPA 70/NEC, NETA.

Can easily read and understand all types of instrumentation drawings.


Can independently do installation, commissioning, testing and trouble-shooting of
instruments.
Testing and trouble shooting of PLC and Loop Testing
Familiar with STEP 7, WINCC and WONDERWARE.
Familiar with AUTOCAD ELECTRICAL.
Co-ordinate project deliverables from different teams, system integration and final
testing
Interacting with Support, Development and Manufacturing to resolve vendor issues.

Familiar with QA procedures: able to adapt test plans as products evolve.




FEBIN BASHEER
febinmb@gmail.com
+966535743521
INSTRUMENTATION ENGINEER


Assist engineering groups and operations with drawing reviews to ensure consistency in
designs
Strong Leadership Qualities, Interpersonal skills, People Management skills, Written and
Verbal Communication skills.
COMPUTER / IT SKILLS:

Is well versed with all of Microsoft's Operating Systems including Windows 98/ME/XP/VISTA
etc.

Expert in Design software AUTOCAD-ELECTRICAL

Expert in Microsoft Office applications – Microsoft Word, Microsoft Excel, Microsoft Access,
Microsoft PowerPoint, etc.
EXPERIENCE SUMMARY

Working as Instrumentation QA/QC in EPURE INTERNATIONAL ENGINEERING PVT LTD ,Al Jubail,
Saudi Arabia.

Worked as Instrumentation Engineer (Operation readiness program) in SETE ENERGY SAUDIA
FOR INDUSTRIAL PROJECTS LTD, Jeddah, Saudi Arabia.

Worked as Instrumentation Site Engineer in Bharath Petroleum Corporation Ltd, Kochi,
India.

Worked as Instrumentation Site Engineer in MINJUR DESALINATION PLANT, Chennai, India.
EXPERIENCE IN DETAIL

INSTRUMENTATION QA/QC INSPECTOR IN MARAFIQ TP9 PROJECT
August 2011 to Till the date
-
EPURE INTERNATIONAL ENGINEERING Pte. Ltd.
Project
-
Upgrade & Expansion of Sanitary Waste Water Treatment Plant
Client
-
Marafiq, Power & Water Utility Company for Jubail & Yanbu
Project management
-
Jacobs
Designation
-
Instrumentation QA/QC Inspector
FEBIN BASHEER
febinmb@gmail.com
+966535743521
INSTRUMENTATION ENGINEER
DUTIES & RESPONSIBILITY

Preparation of ITP as per client requirements.

Monitor daily discipline activities for Instrumentation and verifies compliance to project
procedure specifications and standards.

Preparation of RFI as per work completion and coordination with client for inspection.

Commissioning & testing of instruments(E+H,Detcon,Krohne,Siemens,ifm,Foxboro,vegason).

Calibration Prepare punch list for the activities carried out by the construction group.

Preparation of documents for functional test, SAT and Loop Folders.

Calibration of instruments – pH, DO, Turbidity, Density, Chlorine Analyzers.

SAT & testing of program in PLC (Siemens S7 400, 300, 1200) with PLC vendor.

Preparation of Loop Folders and loop testing.

Conducting inspection for fire detection and suppression works.(Honeywell).

Conducting inspection for telecommunication works.

Maintenance of instruments & trouble shooting of PLC.

Preparation of O&M manual and handover documents.

INSTRUMENTATION ENGINEER (OPERATION READINESS PROGRAM) IN MARAFIQ
TP8 PROJECT
March 2011 to August 2011
-
SETE ENERGY SAUDIA FOR INDUSTRIAL PROJECTS LTD
Project
-
Expansion of Stage III Industrial Waste Water Treatment Plant
Client
-
Marafiq, Power & Water Utility Company For Jubail & Yanbu
Project Management
-
Jacobs
Designation
-
Instrumentation Engineer (Operation Readiness Program)
DUTIES & RESPONSIBILITY

To monitor, control and manage defects status for instrumentation activities.

To report in a weekly basis the status of defects list to owner and contractor.

To conduct and attend regular weekly meeting regarding ORP (Operation Readiness Program).

To have a data base to control and report all the status of defects lists.
FEBIN BASHEER
febinmb@gmail.com
+966535743521
INSTRUMENTATION ENGINEER

Set-up effective communication with both PMC organization and own contractor leaders.

Ensure that the project QA/QC procedures and checklists during project cover ORP related
items.

Implement an effective tracking and reporting system of all ORP actions from the master plans
and risks and readiness reviews and ensure regular ORP progress reporting in the project
progress and keep both PMC and contract management well informed.

Develop and implement an Assurance/Auditing system i.e. inspections, testing etc., to ensure all
activities in the master plans are executed successfully and on time during the construction precommissioning phase.


Provide and arrange presentation on ORP matters like status of defects lists, observations,
defects findings etc.,
Develop and implement a reporting system like observation, non-conformities etc.

INSTRUMENTATION SITE ENGINEER IN SMEC INSTRUMENTATION AND CONTROLS,
Kochi, India.
June 2009 to FEB 2011
-
SMEC INSTRUMENTATION AND CONTROLS
Project
-
Expansion of Sulphur recovery units
Client
-
BPCL KOCHI REFINERY, KERALA, INDIA
Designation
-
Instrumentation Site Engineer
DUTIES & RESPONSIBILITY

Checking of the Field instruments, recalibration and re-ranging of the instrument.

Loop checking simulating with the Hart Communicator 385 for the field instruments such as
Ultrasonic Level transmitter, Air Control Valve, Temperature Transmitter, Pressure Transmitters,
DPIT etc.

Loop checking for the Medium voltage & Low Voltage Switch Gears, Soft Starters, VFDs, check
the communication with the modbus and profibus serial links.

Coordinated with other discipline for functional test of motor(DOL, VFD, SS), Valves etc
FEBIN BASHEER
febinmb@gmail.com
+966535743521
INSTRUMENTATION ENGINEER

INSTRUMENTATION SITE ENGINEER IN MINJUR DESALINATION PLANT, CHENNAI, INDIA.
June 2009 to MAY 2010
-
MINJUR DESALINATION PLANT
Project
-
DESALINATION PLANT 07
Client
-
CMWSS Board, CHENNAI
Designation
-
Instrumentation Site Engineer
Duties & Responsibility

Prepare for and participate in daily construction review meetings.

Supervision/execution, checking and assuring that the construction is as per the final issued for
construction drawings and project specifications.

Coordination with sub contractors for the smooth flow of work.

Proper management of materials and workmanship.

To notify the forthcomings shortage for Material.

Ensure that all the works meet the stipulated quality standards.

Installation and commissioning of instruments

Installation of foundation field bus.
PERSONAL DETAILS

Age
: 27

Marital Status
: Married

Nationality
: Indian

Iqama No.
: 2302664624

Saudi Driving License No.
: 5484128

Passport No.
: H 7382762
DECLARATION
I do hereby declare that the above information is true and correct to the best of my
knowledge
FEBIN BASHEER
Download