Research Project Statement Fiscal Year 2003 Project Number: Title: 0-4028 Modification? Yes No Statistical Analysis of Highway Work Zone Hazards and Their Associated Risks 4 RMC Number: 04 JAN 2002 Project Statement Date: TxDOT Project Personnel Program Coordinator (PC) Project Director (PD) Project Monitoring Committee (PMC) Name Office Area Code/Phone Number Email Fax Number Elizabeth Boswell CST (512) 416-3252 eboswell@dot.state.tx.us (512) 416-2537 Jerry Tallas TRF (512) 416-3153 jtallas@dot.state.tx.us (512) 416-3161 (Project Advisors Optional) Duration (# of years): Total Budget: Other Funding Available? Project Description: Yes $ First Year FY Second Year FY Additional FYs No Budget by year: $ $ $ Objective: Quantify the hazards present in Highway Work Zones and recommend design or operational changes to eliminate or mitigate hazards and thereby reduce risk to both drivers and work zone workers. Description: Work zones accidents are a major concern for TxDOT, its contractors, and Texas drivers. In safety literature, a hazard is a “condition” which may result in an accident. A work zone is safe if it is free of hazards. Risk is the probability of an accident times the expected loss if the accident occurs. If a hazard can be eliminated the associated risk is reduced to zero. Similarly, mitigating a hazard reduces its risk by reducing the probability that the hazard will result in an accident or by reducing the expected loss if an accident occurs. This project will: 1. 2. 3. 4. Gather, organize, and analyze data on work zone hazards on the state highway system from hard copy peace office accident reports and other sources. Define typical hazards found in highway work zones. Determine the risks associated with each hazard. Develop procedures to eliminate or mitigate each risk. The Project Director will require monthly updates from the researcher, and, as a minimum, will schedule project meetings around October and April. Project kickoff and wrap-up meetings may also be scheduled. Minimum Deliverables: Products: P1 – A listing of typical hazards found in work zones, their associated risks, and procedures to eliminate or mitigate each risk. Reports: 1 – A final research report that provides detailed documentation of all research performed, methods used, and that fully supports the recommendations and conclusions contained therein. S – Project summary report outlining the research, findings, and recommendations (4 pages) RMC 4 0-4028 Page 1 of 2 Implementation: The research will produce recommendations concerning which hazards can be mitigated or eliminated and how and when such actions and/or design changes should be implemented. Pre-Proposal Meeting: Yes No Sole-Source Project: Yes No Mandated Project Rating & Justification: Critical Important Desirable Additional Information: Schedule of Activities should include a column next to the Task/Description that shows estimated percentages of the total project budget for each task. This information will be used to help the PC/PD more completely understand the level of effort that is planned for each task. Deadlines (for RTI use only): 1. 2. 3. RMC 4 All individuals interested in proposing are encouraged to contact the PC or PD by February 15, 2002. Proposals are due to RTI by 4:00 p.m. on Wednesday, March 27, 2002. All proposals from researchers should be sent directly to your university Research Liaison’s office for final submission to RTI. The Research Liaison is TxDOT’s official point of contact with the university. 0-4028 Page 2 of 2