DEBRIS RECOVERY PLAN Pre-Demolition/ Pre-Construction Project Address: City, Zip: Date: Contractor: Contact: Title: Phone: Email: Project Type: ____ SF Residential-New ____ SF Residential-Remodel ___ Commercial-New ___ Commercial-TI ___ Multifamily Specify whether materials will be reused, recycled or disposed by completing the table below. You must recycle at least 50% of all waste generated. Check the designated box and provide the name of each facility or service provider to be used. If the materials are to be reused on site, describe under the facilities/service providers column. For example, wood waste chipped on site for mulch in plant beds. Salvaged materials from deconstruction should be designated as reuse. Material Asphalt Brick Cardboard Carpet Reuse Recycle Dispose Facility/Service Provider to be used* Concrete Dirt/Clean Fill Dry Wall Metal Pallets Plant Debris Plastics Roofing – asphalt composition shingle, tile, wood shake, tar or gravel Wood - clean Wood - treated Other Other For assistance in recovering materials at the jobsite, visit the following websites for a Builders Guide to Reuse and Recycling. Alameda County Contra Costa County Marin County Napa County San Francisco County San Mateo County Santa Clara County Solano County Sonoma County 877/Stopwaste 925/335-1225 415/499-6647 707/257-9292 415/554-7329 888/442-2666 408/924-5453 707/421-6765 707/565-3375 www.stopwaste.org/docs/buildersguide-05.pdf www.co.contra-costa.ca.us/depart/cd/recycle/c-n-d/Builders_2005-screen.pdf www.co.marin.ca.us/depts/CD/main/pdf/BEST_pdf/C&D_Resource_Matrix.pdf www.co.napa.ca.us/living/apps/recycle/ www.sfenvironment.com/aboutus/innovative/greenbldg/resource_guide/guide.pdf www.recycleworks.org/pdf/CD_office_guide.pdf http://recyclestuff.org/Guides/BuildersGuide.pdf www.recycle-guide.com/ www.recyclenow.org/BuildersGuide_Reuse&Recy.pdf DEBRIS RECOVERY STATEMENT – Post Demolition/Construction Project Address: City, Zip: Date: Contractor: Contact: Title: Phone: Email: Project Type: ____ SF Residential-New ____ SF Residential-Remodel ___ Commercial-New ___ Commercial-TI ___ Multifamily Identify which materials were reused, recycled or disposed by completing the table below. Check the designated box and provide the name of each facility or service provider and weight of materials. If the materials were reused on site, describe the reuse application under the facilities/service providers column. Salvaged materials from deconstruction should be designated as reuse. Attach copies of receipts, gate tags, or other verifying documentation. Material Asphalt Brick Cardboard Carpet Concrete Dirt/Clean Fill Dry Wall Metal Pallets Plastics Plant Debris Roofing - asphalt composition shingle, tile, Reuse Recycle Dispose Facility/Service Provider wood shake, tar or gravel Wood - clean Wood - treated Other _________________ Other _________________ MATERIAL GENERATION SYNOPSIS A. B. C. D. Total tons of materials generated for the project: Total tons of materials disposed (not recycled): Total tons of materials salvaged, reused, or recycled: Percentage of materials recycled/reused (divide C by A): % Weight (tons)