DEBRIS RECOVERY PLAN: Pre-Construction and/or Pre-Demolition
All GreenPoint Rated projects must account for all waste generated. New Home projects must recycle at least 50% by weight of all waste
generated by construction of a new building and, if applicable, demolition of an old structure. Existing Home projects must recycle all
cardboard, concrete, asphalt & metals. This form prepares builders to meet these requirements by identifying wastes and the facilities which
will process them. Page 1 of this form shall be completed by the builder/developer and submitted by the Rater at the beginning of the project.
Instructions: Builder indicates whether each material will be reused on site, recycled or land-filled by placing an X in the corresponding cell.
Write what form of documentation is expected to track each material, for example, hauler tags, monthly invoice, etc. If materials will be
reused on site, mark as reuse and state the application, for example, “wood chipped on site for landscape.” For any donated materials, check
reuse and write “donated to {recipient}” in facility column. For all other wastes, a specific facility should be identified. Please print clearly.
Project ID Number
City
Builder OR company name
Builder’s contact person, title
Material
Reuse
Recycle
Landfill
Documentation
method
Facility, service provider
to be used, or recipient
Asphalt
Cardboard, Mixed Paper
Carpet
Concrete, Brick, Masonry, Stucco
Drywall/gypsum
Metal
Pallets
Plastics
Wood, Lumber, Plant Debris
Other:
Other:
Builder’s signature, job title, date:
Page 1
March 1, 2012
DEBRIS RECOVERY STATEMENT: Post-Construction and/or Post-Demolition
Page 2 is required to be completed by the Builder and/or Rater, and kept in Rater’s records for verification and Q.A. Filing page 2 of this
document with GreenPoint Rated is not mandatory. Summarize debris recovery here based on copies of receipts, tags, invoices, etc.
Instructions: Indicate which materials were reused, recycled, land-filled or donated by checking the appropriate box and providing the name
of each facility or service provider and the weight. If materials were reused on site, mark as reuse and state the application, for example,
“wood chipped on site for landscape.” For any donated materials, check reuse and write “donated to {recipient}” in facility column. If
documents do not itemize each waste, and show only mixed C&D debris, write “mixed C&D” beside ‘other’ in the material column. For more
information, including verification and estimating various weights, see “additional resources” for measure A2 in any GreenPoint Rated Manual.
Material
Reuse
Recycle
Landfill
Documentation method
Facility or service provider
Tons
Asphalt
Cardboard, Mixed Paper
Carpet
Concrete, Brick, Masonry, Stucco
Drywall/gypsum
Metal
Pallets
Plastics
Wood, Lumber, Plant Debris
Other:
Other:
MATERIALS SUMMARY REPORT FOR PROJECT:
A. Project address or development name
B. Total tons of materials generated for the project:
C. Total tons of materials disposed (not recycled):
D. Total tons of materials donated, reused, or recycled:
E. Total percentage recycled or reused (divide D by B):
Page 2
%
March 1, 2012