Helen Burns Graduate structural engineer

advertisement

RESUME

D.ASHWANI

B

oiler

-

Erection & Commissioning

Engineer

PERSONAL SUMMARY

: Possessing a comprehensive knowledge of designing & developing projects to required specifications, focusing on economy, safety, reliability, quality & sustainability. At present working for an established company that is involved in construction, inspection, repair and maintenance projects throughout the project. Easy going by nature & able to get along with both work colleagues & senior managers, currently looking for a suitable engineer position in firm.

ACADEMIC QUALIFICATIONS:

B.Eng Mechanical Engineering

Pdt.ravi Shankar Shukala University 67.85%

Rungta collage of engg & technology Bhilai C.G 2004-2008

CURRENT WORK EXPERIENCE – Currently working PELLET MECHANICAL MAINT

SENIOR ENGINEER: RASHI STEELS & POWER LTD : DEC 2014- PRESENT

CURRENT SITE : JAIRAMNAGAR-PARAGHAT (C.G)

WORK EXPERIENCE – Fabrication&Erection Structural Steel & Boiler & Axullaries Erection

SENIOR ENGINEER : INDWELL CONST PVT LTD : Sep 2012 – Nov 2014

CURRENT PROJECT : CSPGCL 2x500 MW Marwa District, Champa C.G

Involved in projects from the concept and detail of the design through to implementation, testing and handover. Part of a team that ensures a building is fit-for-purpose and adheres to the project budget and schedule.

EPC Contractors for Thermal Power Plants

Traveling Grate Boilers,

Waste Heat Recovery Boilers

Oil / Gas Fired Boilers,

Centrifugal Fans,

Other Boiler Components,

Pressure Vessels & Heat Exchangers.

Manufactures of AFBC & CFBC Type Boilers,

For various Captive Power Plants and various process industries under Inspection

IBR as per ASME & IBR Codes and Standards .

PROFESSIONAL WORK EXPERIENCE:

Composite materials: design, processing, and testing

Large-scale structuring composite materials

Product design and development

Design optimization & Testing

Quality control and management

Duties & Responsibilities :

Pressure Parts & Non-Pressure Parts Works: Erection

Estimating material, construction, and labour costs, and project timescales. Involved in producing due diligence surveys. Liaising with local contractors. Load assessments of new and existing structures. Giving PowerPoint presentations to managers and clients.

Communicating with government agencies and local authorities. Evaluating, organizing

& prioritizing work within the overall project schedule. Preparing sketches, marking-up drawings and writing specifications etc. Engineering technicians and IT staff. Structural inspections/assessments and making appropriate

Recommendations. Providing expert technical advice including structural reports, crack monitoring.

Technical Responsibilities:

Mobilization of various contractors for Fabrication and Erection works in Boiler ans

ESP in Thermal Power Plant.

Receive the drawing about Boiler, ESP, Belt conveyor etc. Read the drawing according to that prepares Bill of Materials (BOM).

Arranging and distribute the raw Materials for making of BOILER and ESP Components and Accessories.

Allocation of various works in Boiler, ESP & FHS (FUEL HANDLING SYSTEM).

Following the IBR rules during pressure parts erection in Boiler and also arranges a visit for ground inspection.

Planning the erection sequence & follow the working activities.

The work should follow the Safety Working Procedure (SWP).

Singing of Protocols, Records, Punching check list prior to Hydro test and witnessing the hydro test and hand over to commissioning dept.

Involve in Preparation of Quality plan & Implemented in various stages of Erection.

Involved in Supervision of Erection works of Static and Rotating Equipments such as feed pumps, fans, blowers etc.

Assisting commissioning Team in Pre – commissioning .

Managerial Responsibilities:

Involved in site activities, customer co**ordination, Man power management, Project schedule & Implementation.

Planning Man Power resources with required tools, consumables.

Planning the monthly & weekly erection & fabrication schedule.

Co**ordination with consulting management and clients to handover all relevant documents.

Maintained safety procedures and records conducted safety meeting and audits

Planned and reviewed daily progress of projects and experienced in implementation of project schedule with effective man power

Settling of Sub**contractors Bills & Payments.

KEY SKILLS AND COMPETENCIES

: Ability and also willingness to work in all weather

Condition, Able to explain technical design ideas clearly. On site survey and client liaison experience. Experience of preparing arboriculture and topographical reports.

Constantly focusing on a client's objectives of Quality, Cost and Programme. Knowledge of Stock Condition Surveys. Fully conversant with the relevant structural British

Standards. Self-motivated with a positive and friendly attitude. Experience in design of foundations and retaining walls.

Developed, implemented, and improved testing procedures for Erection &

Commissioning in thermal power projects. Worked directly with Senior Engineers on the design of plant equipments.

Attention to detail Time management & Good team player Problem solving.

ADITIONAL WORK EXPERIENCE:

A) Company: DCPL/Zillion infra power projects

2x240 MW, Indiabulls, Nashik, M.H, Sinnar (under GDCL),

Thermal power project – Mar-2012 to Sep-2 Senr. E

The project comprises CHP Structure

TP-Columns, Mill bunker Structure works.

Project works consist of 12000MT Of Steel structure.

Fabrication & erection of the steel structural works.

B) Company : S implex Infrastructure Ltd Vindh nager, Singruali, M.P

Vindhyachal Super Thermal Power Project, Stage-IV (2x500 MW)

Simplex Infrastructure Ltd (under NTPC)-C2416- july-2011 to Feb-2012

Asst.Eng- Grade-2 Execution engg – Fabrication

The project comprises of fabrication and erection

Of 44000 MT Of structural steel including Fabrication

& Erection of Mill &Bunker, ESP and VFD Control

Room Building, TG-Building, Compressor house building and

Chimney steel structure of 2X 500 MW .

C) Company: Sbec Const Pvt ltd.Sipat, NTPC,-bilaspur c.g

Engineer (GET-Contract Basis)- Jan-2009 to June-2011

2) Fabrication responsibilities:

Assure & Control the Quality & Execution of whole area.

Daily monitoring the all Structural activities such as verifying the cutting plans,

Fit up inspection, conducting final inspection after completion,

of welding along with all necessary NDT.

Preparing monthly planning for maximum output.

Involve in the site activities Costumer co- ordination & man power management..

Coordination with consulting management & Client to handover the relevant

Documents.

Maintaining Safety Procedure Record Conducting Meeting & Audits.

Signing of Protocols, records & Punching Check List.

Involve in the Quality plan & Implementation in Various stages of Erections.

Follow up jobs, as per approval drawing from vendor.

Giving the idea how to reconcile the material which can give max. Profit to the company.

Successfully looking after the fabrication and erection of various structures on the site.

Fabrication of base plate Shim plate for heavy equipment erection & alignment..

Fabrication of SS Steel works & MS Steel works.

KEY Task Handled ► Execution of Main Columns, Crane Girders, Gable End Columns,

Auxiliary Columns, Trusses, Main beam, Secondary beams, Vertical, Horizontal, Top and

Bottom chord Bracings and Purlins.

► Painting- Basting & panting work of steel structure also been execute.

► Painting work is inspected by profile test, scratch test & paint profile is checked by elcometer.

► Regularly inspection of fabricated material as per drawing fit up check & weld visual checking.

AREAS OF EXPERTISE :

Sequence of Erection works

Construction documentation

Structural alterations

Structural inspections

Technical report writing

Billing status.

COMPUTER SKILLS : MS office package & internet surfing

LOCATION: C.G, M.P, M.H, W.B, NCR

CURRENT SALARY: 30 per Month

Expected salary

:

4o per Month

Interest : working I in projects field.

PERSONAL DETAILS:

D.Ashwani: Heamu Nagar Bundhwa Para Pump House Road, Bilaspur C.G- Pin No:

495004

M.No: 7869724550, Email: d.ashu.ashwani61@gmail.com

DOB: 09-08-1985, Father Name: D.DALAYYA

Nationality: Indian

Marital Status: Single

Reference:

Download