Lower Lee Steering Group meeting 20 February 2012, City Hall Attendees: British Waterways Environment Agency GLA Groundwork London London Borough of Enfield London Wildlife Trust Thames Water UK Regeneration Leela O’Dea Sandra Spinks, Rob Argent, Jennie Marshall Kevin Reid Matthew Carrington Sue McDaid Mathew Frith David Todd Ralph Ward Actions and decisions: Action Draft wording for vision and share with group for review. Arrange first biodiversity subgroup meeting (British Waterways to provide venue?). Who Environment Agency By when? 2 March Mathew Frith Arrange first water quality subgroup meeting. Kevin Reid Ask LVRPA if they would be willing to arrange first community/people subgroup meeting. Draft text to explain where we are now and what our next steps are (to support creation of subgroups) Discuss membership of subgroups with colleagues and report back to group. Make previous Lower Lee reports available to all on Sharepoint Provide available information about projects completed (since 2009), underway, planned or aspirational to Jennie Marshall for GIS layer. Create visual depiction of status and element information for catchment and share with group Share list of key tasks for subgroups Arrange next Steering Group meetings (possible telecon and face-to-face in April) Ralph Ward meet before Easter meet before Easter 2 March (but asap) 2 March Environment Agency All Environment Agency All Sandra Spinks Environment Agency Sandra Spinks 2 March (but asap) 2 March 2 March (but ongoing) 9 March 2 March Availability email by 2 March Decisions: The group will focus on three broad outcomes covering biodiversity, water quality and community/people (each outcome will have a separate subgroup). Underneath each overarching outcome will be more detailed outcomes/targets for the subgroups to focus on. Several organisations within the steering group are likely to have an interest in all three outcome subgroups – it is up to each organisation to decide whether they prioritise one, have the same person attend more than one subgroup, or different people at each. Draft membership of subgroups: Biodiversity London Wildlife Trust LVRPA London Boroughs Groundwork Thames Rivers Restoration Trust Natural England British Waterways Herts and Middlesex Wildlife Trust Thames21 Smaller community groups Water Quality GLA Environmental health departments Environment Agency Users e.g. Lee Anglers Society Thames Water Community/People LVRPA London Boroughs British Waterways Thames21 Groundwork Canoe England London Cycle Group Natural England September 2012 is a more realistic target for a draft catchment plan (rather than March 2012). Catchment Restoration Fund – aim to submit one bid for each subgroup in the September opening. Audience for catchment plan – those that ‘live, work and play’ within the catchment. Content and language of plan should reflect this. Subgroups to meet before Easter. Steering Group to meet again in April (with addition of telecon catch-up beforehand).