SIGNATURE PAGE Country: Vietnam Project Title: Promoting Climate Resilient Infrastructure in Northern Mountain Provinces of Vietnam UNDP Strategic Plan Environment and Sustainable Development Primary Outcome: Promote climate change adaptation UNDP Strategic Plan Secondary Outcome: Mainstreaming environment and energy Expected Outcome/UN One Plan Outcome 1.3 (2012-2016): By 2016, key national and sub-national agencies, in partnership with the private sector and communities, have established and monitor multisectoral strategies, mechanisms and resources to support implementation of relevant multilateral agreements and effectively address climate change adaptation, mitigation and disaster risk management Expected Output/ UN One Plan Output 1.3.1 (2012-2016): Planning and investment processes are climate proofed and specific programs have been formulated and operationalized for long-term adaptation to reduce climate change vulnerabilities Implementing Partner: Ministry of Agriculture and Rural Development (MARD) Responsible Partners: Agriculture Projects Management Board, MARD; Programme Period: Programme Component: Sustainable Development 2012-2016 Environment and Atlas Award ID: Project ID: PIMS # 00060373 00075992 3741 Project Duration: 4 years (Sep 2012-Aug 2016) Total budget Total allocated resources: Manage by UNDP: GEF/SCCF/UNDP: Manage by others: $148,565,000 $1,400,000 GEF/SCCF/ADB: Government:: $30,000,000 Government in-kind: ADB: UNDP parallel: $1,400,000 $2,000,000 $400,000 $108,000,000 $6,765,000 Agreed by MARD (Government): Date/Month/Year Agreed by UNDP: Date/Month/Year Page 1 Brief Description In recent years, Vietnam has taken great strides to overcoming economic and human poverty. Yet, despite these overall achievements, poverty persists in some areas, notably in the rural areas of the Northern Mountainous provinces. Poor infrastructure is a key factor limiting poverty reduction - the fifteen provinces of Northern Vietnam have very poor infrastructure compared to the rest of Vietnam. To address these imbalances, the Vietnamese government, with assistance from the international community, plans a series of large infrastructure investments in the rural areas of the Northern Mountainous provinces. Significant national and provincial funds are to be allocated to rural infrastructure development over the coming years. Vietnam is one of the most disaster prone countries in the world, suffering from typhoons, floods, droughts, landslides, etc. Climate change threatens to exacerbate this. Studies suggest that the Northern Mountains of Vietnam is one of the areas the most vulnerable to climate change in Southeast Asia. Disasters, exacerbated by climate change, are likely to have impacts on infrastructure in the Northern provinces, thereby undermining efforts to reduce poverty. This project aims to address these threats by increasing the resilience of infrastructure to climate change in the northern mountains. The programme directly addresses the anticipated impacts of climate change on poverty and poverty reduction. The project shall do this by: Contributing to a national level enabling environment that is conducive to adaptation in rural infrastructure projects. This will include a series of practical tools for practitioners, as well as recommendations towards improved policies and standards; Developing capacity to plan, design, implement and monitor infrastructure projects at the provincial level, and developing capacity to assess climate change during provincial planning; Demonstrating how to mainstream climate change adaptation into 4 infrastructure projects. The 4 demonstration projects are in the road rehabilitation, irrigation system rehabilitation and river embankment protections sub-sectors*. Given that this project is one of the first rural infrastructure projects in the SCCF portfolio, and that it is one of the first projects in northern mountainous Vietnam to undertake adaptation measures, it has a strong emphasis on learning and knowledge management. The entire project approach is one of ‘capacity development by doing’; in this national and provincial level capacity will be developed by involving concerned institutions and individuals in all steps of the process at the 4 demonstration infrastructure projects. *Note: The project is a coordinated package supported by Government of Vietnam, SCCF/GEF, ADB and UNDP. Notably, for the ‘demonstration’ component, the baseline investments are financed through the GOV/ADB SRIDP investment ($138 million investment described in Annex 12), and the additional activities to adapt the investments to climate change are financed by SCCF/GEF through ADB (described through a separate ADB TA paper in Annex 13). Page 2 Table of Contents List of Acronyms ........................................................................................................................................... 4 1. Situation Analysis ............................................................................................................................... 5 1.1. Climate Change Induced Problems ................................................................................................... 7 1.2. Context ............................................................................................................................................... 9 1.2.1 Rural development and infrastructure policy .............................................................................................. 9 1.2.2 Climate change policy ........................................................................................................................ 11 1.3. Long-term Solution and Barriers to Achieving the Solution ............................................................. 12 1.3.1 Preferred situation. ............................................................................................................................ 12 1.3.2 Barriers to reaching the preferred situation.............................................................................................. 13 1.4. Stakeholder Analysis........................................................................................................................ 14 2. Strategy ............................................................................................................................................ 18 2.1. Project Rationale and Policy Conformity.......................................................................................... 18 2.2. Country Ownership: Country Eligibility and Country Drivenness ..................................................... 18 2.3. Design Principles and Strategic Considerations .............................................................................. 20 2.4. Project Objective, Outcomes and Outputs/Activities ....................................................................... 22 2.5. Key Indicators, Risks and Assumptions ........................................................................................... 35 2.6. Cost-effectiveness ............................................................................................................................ 36 2.7. Sustainability .................................................................................................................................... 37 2.8. Replicability ...................................................................................................................................... 38 2.9 Stakeholder Involvement Plan .......................................................................................................... 38 3. Project Results Framework .............................................................................................................. 39 4. Total Budget and Workplan .............................................................................................................. 43 5. Management Arrangements ............................................................................................................. 49 6. Monitoring Framework and Evaluation ............................................................................................. 51 7. Legal Context ................................................................................................................................... 55 Annex 1: Risk Analysis ............................................................................................................................ 56 Annex 2: UNDP – ADB Implementation Cooperation Agreement .......................................................... 58 Annex 3: References ............................................................................................................................... 60 Annex 4: Summary of Rapid Provincial Capacity Assessment............................................................... 62 Annex 5: Relevant Internationally Supported Initiatives ......................................................................... 66 Annex 6: Background Information on Bac Kan and Son La Provinces .................................................. 72 Annex 7: Detailed Information on the Selected Demonstration Sub-projects ......................................... 75 Annex 8: Stakeholder Involvement Plan ................................................................................................. 77 Annex 9: Capacity Scorecard.................................................................................................................. 81 Annex 10: Terms of Reference ............................................................................................................... 85 Annex 11: Overall Project Management and Organizational Structure .................................................. 91 Annex 12. Memorandum Of Understanding Between The Asian Development Bank And The Government Of Viet Nam for the Technical Assistance Project: Promoting Climate Resilient Rural Infrastructure In Northern Vietnam .......................................................................................................... 93 Annex 13: ADB TA Paper: VIETNAM: Promoting Climate Resilient Rural Infrastructure in Northern Viet Nam ......................................................................................................................................................... 94 Page 3 Annex 14: Co-financing letter .................................................................................................................. 95 LIST OF ACRONYMS ADB ALM APMB APR/PIR ATLAS QPR AWP CBTA CGPRS CoP CO CPAP CPMU DARD DOC DONRE DOT DPI EA ERC GEFSEC GHG IFAD INC M&E MARD MOC MONRE MOT MPI NIM NPD NTP OCCA PB PPC PPR PPTA RCU SCCF SEDP SNC SRIDP UNDAF Asian Development Bank UNDP-GEF’s Adaptation Learning Mechanism Agricultural Project Management Board Annual Project Review/Project Implementation Reports ATLAS Quarterly Production Report Annual Workplan Capacity Building Technical Assistance Comprehensive Growth and Poverty Reduction Strategy Conference of the Parties (to the UNFCCC) (UNDP) Country Office (UNDP) Country Programme Action Plan Central Project Management Unit Provincial Department of Agriculture and Rural Development Provincial Department of Construction Provincial Department of Natural Resources and Environment Provincial Department of Transport Provincial Department of Planning and Investment Executing Agency (UNDP) Evaluation Office Evaluation Resource Center Secretariat of the Global Environment Greenhouse gas emissions International Fund for Agricultural Development Initial National Communication Monitoring and Evaluation Ministry of Agriculture and Rural Development Ministry of Construction Ministry of Natural Resources and Environment Ministry of Transport Ministry of Planning and Investment National Implementation National Project Director National Target Programme to Respond to Climate Change Standing Office for Climate Change Adaptation (of MARD) Project Board Provincial Peoples Committee Project Progress Report (ADB) Preparatory Project Technical Assistance UNDP-GEF Regional Coordination Unit Special Climate Change Fund Five Year Socio-Economic Development Plan Second National Communication Sustainable Rural Infrastructure Development Project in the Northern Mountains United Nations Development Assistance Framework Page 4 1. SITUATION ANALYSIS Vietnam is one of the most disaster prone countries in the world. It suffers from typhoons, floods, droughts, landslides and forest fires. Flooding triggered by typhoons and storms is the most prevalent natural disaster. In the decade up to 2005, storms caused 6,000 deaths, destroyed 320,000 houses and almost 9,000 boats, and resulted in capital stock loss of more than $2.5 billion, representing about 5% of gross annual capital formation1. Since the adoption of market-oriented reforms almost two decades ago, and the opening of the economy to international trade, Vietnam has taken great strides to overcoming economic and human poverty. It is now well on its way to achieving middle-income status. The national poverty rate declined from 58% in 1993 to 16% in 2008, and rural poverty declined from 64% to 20% over the same period2. Despite overall achievements in overcoming poverty, poverty remains persistently entrenched in some areas: rural areas have far more poverty than urban areas; areas with a large ethnic minority population often have high poverty levels, and; hilly and mountainous areas experience high poverty levels. Poverty is particularly entrenched in the Northern Mountains, where: The lack of infrastructure, rural roads, irrigation facilities, clean water supplies, sanitation, adequate schooling facilities, and health services makes day to day living more difficult for local communities. For ethnic minorities inhabiting these areas, the difficulties are exacerbated by structural and attitudinal problems that can lead to exclusion from participation in decision making and planning for their own welfare and development. For women and girls in particular, living under such challenging conditions results in commitment to the more arduous tasks of meeting essential household needs for water and sanitation. It often results in reduced opportunities to attend school, reduced participation in other income generating activities, and poor health care.3 Development studies consistently show that poor infrastructure is a key factor limiting economic growth and poverty reduction. The fifteen provinces of Northern Vietnam (see map in Figure 1) have very poor infrastructure compared to the rest of Vietnam. The number of roads is amongst the lowest in the countries. Likewise, there is a low proportion of irrigated land. The communities often lack reliable and convenient access to clean water. Market structures tend to be poorly sited and constructed. 1 World Bank. 2005. Project Appraisal Document on a Proposed Credit to the Socialist Republic of Vietnam for a Natural Disaster Risk Management Project. 2 ADB Preparatory Project Technical Assistance (PPTA) 7215-VIE Interim Report (2009) 3 ADB PPTA 7215-VIE Inception Report (2009) Page 5 Figure 1: Map of Northern Vietnam In addition, much of the existing infrastructure is either of poor quality or in a poor state of repair. As noted in the ADB PPTA 7215-VIE Inception Report: the proportions of unsealed rural roads are high for all categories of roads across all provinces and is significantly higher in mountainous districts; irrigation areas in need of rehabilitation are large, but are found mainly in the lowland areas of target provinces where drainage (of excessive seasonal flooding from the compromised catchments supplying the scheme) is as much of the design challenge as is delivery of irrigation water itself; there is a need for canal lining in most locations; there is a need for improvement and establishment of rural water supplies as some provinces have less than half the households with access to clean water (in the mountainous areas, the capacity and willingness to pay water service charges makes the unsubsidized operation of large schemes relatively costly for local administrations); and there are a large number of ‘temporary’ market structures that are unlikely to be able to meet future rural market needs and, in their current state, constitute a significant food safety risk. In general, the demand for rural infrastructure is by far in excess of available funds to meet these requirements. As will be seen in the following sections, the existing infrastructure is threatened by damage from climate change. More importantly, ongoing and planned programmes to construct and rehabilitate infrastructure Page 6 are also threatened by damage from climate change. This, in turn, threatens to undermine efforts to reduce poverty in Vietnam, particularly in the Northern provinces. The Northern provinces generally share the following tendencies: low population densities, large ethnic minority population, high dependence on agriculture, and high levels of persistent poverty. 1.1. Climate Change Induced Problems Viet Nam’s topography and exposure to monsoons and typhoons make it highly prone to climate-change and climate-related disasters. The climate related hazards include typhoons, coastal surges, floods, droughts, saltwater intrusions, landslides and forest fires. The impacts of climate related disasters are high and increasing, due, in addition to climate change, to a series of ecological and socio-economic factors that increase vulnerability, including: growing populations in low-lying areas and valley floors and deforestation. Table 1 summarises the likely impacts of climate change on different geographical areas, sectors and communities across Vietnam. Climate Change Impact Temperature increase Vulnerable Areas Mountainous areas (Northeast, Northwest and North Central) Red River Delta Sea level rise Coastal Areas, especially deltas and flooded areas (Mekong River Delta, Red River Delta and coastal Central Part) Islands Floods, flash floods, and landslides Coastal Areas (including delta areas and flooded areas: Delta and coastal Northern Part, Mekong River Delta and coastal Central Part) Mountainous areas: Northwest, Northeast, North Central areas and Central Highlands Tropical Coastal Areas: especially coastal Vulnerable Sectors Agriculture and food security Aquaculture Natural ecology systems and biodiversity Water resources Energy (production and consumption) Community health care Agriculture and food security Aquaculture Sea and coastal ecological systems Water resources (surface and ground water) Energy Tourism Residential Space Infrastructure, industrial zones Agriculture and food security Aquaculture Transportation Water resources Infrastructure Residential Space Health care and life Trade and Tourism Agriculture and Vulnerable Communities Poor farmers Ethnic minority people, senior citizens, children and women Coastal communities, especially poor farmers and fishermen Senior citizens, children and women Coastal communities Mountainous communities, especially ethnic minority groups Senior citizens, children and women Coastal communities, Page 7 Climate Change Impact cyclones Droughts Vulnerable Areas Central Part, Red River delta and Mekong river Islands Central Part, especially South Central Part Delta and Northern Part Midland Mekong Delta Highlands Vulnerable Sectors food security Aquaculture Transportation Energy Offshore and coastal activities Infrastructure Place of Residence Health care and life Trade and Tourism Agriculture and food security Water resources Energy (hydro power) Waterways Health care and life Vulnerable Communities especially fishermen Senior citizens, children and women Poor farmers Rural communities Table: 1 Summarizing likely climate change impacts in Vietnam (Source: National Target Programme Background documentation, 2008) Meteorologically, Vietnam is divided into seven regions. Two of these are in the North: the Northwest region and the Northeast region. The fifteen Northern provinces cover two of these regions. The Northwest region covers the following four provinces: Lai Chau, Dien Bien, Son La and Hoa Binh. The Northeast region covers the following 11 provinces: Lao Cai, Ha Giang, Cao Bang, Yen Bai, Tuyen Quang, Bac Kan, Phu Tho, Thai Nguyen, Lang Son, Bac Giang and Quang Ninh. Compared to the Northwest, the Northeast provinces have more rain – particularly in the rainy season, and they are warmer - particularly in the summer. However the daily temperature fluctuations in the Northwest are greater than in the Northeast. For both regions, annual and monthly average temperatures have shown an increasing trend over the past 50 years, with increases in summer and winter averages. Average rainfall has marginally decreased, with significant annual and inter-annual variation. With respect to changes in rainfall intensity and flood impacts, data is limited, although anecdotal evidence indicates an increasing number of extreme events. It is the extreme events, in particular, that lead to damage to infrastructure. All fifteen provinces already experience a large number of climate related challenges. The most notable of these are: Increasing intensive and regular flash floods leading to damage to public and private property and lives. These are typically caused by either the heavy, lengthy monsoon rains, or the passage of tropical storms; Increasing intensive and regular landslides leading to damage to infrastructure, in particular to closing roads – also caused by monsoon rains and the passage of tropical storms; Localized droughts leading to water shortages for agriculture and domestic consumption. Efforts to downscale global circulation models for regions of Vietnam show differences in mean effects for different IPCC emissions scenarios. Vietnam’s projections as per different emissions scenarios show a rise in average temperatures and average rainfall for both Northwest and Northeast Vietnam (Tables 2 and 3). The downscaling shows a steady rise in mean annual temperatures for the two regions with relatively small differences between the two regions. But these mean changes can be small compared to seasonal and annual weather variability, whilst geographical weather variability in mountainous regions can be Page 8 large on a single day. The models only provide averages of climate change effects, whereas more understanding of climate extremes is needed, i.e. on the changed risks for extreme climatic effects to which infrastructure will be exposed. Changes in these risks are expected to be fairly constant over the two regions, but could be quite diverse at the micro scale because of the effects of topography and for example comparative exposure to prevailing wind directions, leading to differences in likely impacts and damage. Hence a regional scenario is not always useful when planning development at the village or watershed level. Climatic Region North West North East 2020 0.5 0.5 2030 0.7 0.7 Decades in the 21 Century 2040 2050 2060 2070 2080 1.0 1.3 1.6 1.9 2.1 1.0 1.2 1.6 1.8 2.1 2090 2.4 2.3 2100 2.6 2.5 Table: 2 Predicted changes in Annual Mean Temperature (oC) relative to period of 1980-1999, Medium Emission Scenario (B2) (Source: Climate Change and Sea Level Rise in Vietnam, 2009) Climatic Region North West North East 2020 1.4 1.4 2030 2.1 2.1 Decades in the 21 Century 2040 2050 2060 2070 2080 3.0 3.8 4.6 5.4 6.1 3.0 3.8 4.7 5.4 6.1 2090 6.7 6.8 2100 7.4 7.3 Table: 3 Predicted changes in Annual Rainfall (%) relative to period of 1980-1999, Medium Emission Scenario (B2) (Source: Climate Change and Sea Level Rise in Vietnam, 2009) Studies, for example by Yusuf and Francisco4, suggest that the Northern Mountains of Vietnam (particularly the Northwestern provinces) is one of the areas the most vulnerable to climate change in Southeast Asia. This vulnerability is a factor of the likely climate changes and of the present capacity of the people and communities to resist and adapt. It is generally predicted that in the future, due to climate change, more extreme climatic events are likely to lead to increases in water flows, to increases in maximum water levels, to increases in the number and intensity of flash floods, to increases in soil erosion, and to increases in the number and intensity landslides. In turn, these are likely to have impacts on infrastructure in the Northern provinces, including causing damage to roads, embankments, irrigation systems and water supply systems. This is a major threat to poverty reduction and socio-economic development, although the details and financial details remain unclear. The nature of the climate combined with the fragility of the ecosystems and the irregular terrain ensures that climate risks are quickly translated into threats to infrastructure and therefore poverty reduction. 1.2. Context 1.2.1 Rural development and infrastructure policy The guiding document for social and economic development in Vietnam is the Five Year Socio-Economic Development Plans (SEDP), implemented through five year national, sectoral and provincial plans. The government and its agencies are currently preparing the SEDP 2011-2015. Overall, SEDP 2011-2015 4 (2009) Climate Change Vulnerability Mapping for Southeast Asia. Page 9 aims, amongst other objectives, to develop the agriculture of every region, to reduce poverty - with a priority on remote regions and regions with a large ethnic minority population, and to enhance natural resource protection. Under the SEDP, each Ministry prepares a sectoral five-year Plan, and each Province prepares five-year Provincial development Plans. The ministerial sectoral plans – for example the five year plan for the agricultural and rural development sector - are based partly on guidance from national government, and are based partly on proposals from provinces. The Provincial plans are based partly on proposals from districts, partly on guidance from the national government, and partly on proposals from national sectoral ministries. Hence, together the sectoral and area plans form a matrix of plans covering the nation. In line with its mandate for rural development, the Ministry of Agriculture and Rural Development (MARD) is responsible for developing most small and medium-scale infrastructure serving rural areas. MARD is currently finalizing its five-year plan for 2011-2015. The draft has six Goals, of which two are: improved living standards and conditions, especially of the poor; and, developed infrastructure systems to improve productivity, and the protection of natural resources. The local departments of the Ministry of Construction (MOC) and of the Ministry of Transport (MOT) also have responsibilities for improving infrastructure in remote and rural areas. MOT local departments are responsible for road building, supporting road building projects, and implementing regulations and standards. Likewise, MOC local departments are responsible for some water supply systems. MOT and MOC are also currently developing their respective five year plans for 2011-2015. Also, MOT is responsible for preparing and updating Rural Transport Development Strategies. The most recent (2006) emphasizes the importance of developing roads in remote areas, including the Northern provinces, in order to promote socio-economic development. This strategy is currently being updated. In addition to the five year plans, the government implements a series of focused investment Programmes to address key issues such as poverty alleviation. These include: Programme 135, for Socio-Economic Development in Communes Facing Extreme Hardship in Ethnic Minority and Mountainous Areas. The first two phases of Programme 135 supported thousands of communes with participatory planning, small-scale investments, stimulating agricultural production and local infrastructure. The third phase of the programme (135-III) is due to start in 2011; Programme 30A for Poverty Reduction in Disadvantaged Districts in Vietnam, running through to 2015. Over half of the activities are to support agricultural production in northern districts; Programme 134 to Improve the Livelihoods of the Ethnic Minority Population in the Northern Provinces. Decision making and government revenue has been increasingly decentralized to the provincial level in recent years. Each province, under the Provincial Peoples Committee (PPC) prepares five year plans, coherent with the national SEDP and the ministerial plans. In each Northern mountainous province, the provincial plans contain significant investments in rural infrastructure, including roads, irrigation, water supply and embankment protection. Accordingly, it is expected that significant national and provincial funds are to be allocated to rural infrastructure development over the coming years. Once finalized and approved, the five-year plans are implemented through annual implementation plans with budget allocations. The major component of the annual implementation plans (and annual plans under the National Programmes) is a list of investment and infrastructure projects. Once the plan has been approved, funds are available to implement the project. The concerned government agency is responsible Page 10 for the following: (i) hiring consultants to prepare the detailed investment design, through a competitive process; (ii) hiring consultants to construct the projects, again through a competitive process, and; (iii) hiring a third set of consultants to supervise project construction, again through a competitive process. For the majority of rural infrastructure projects in remote areas of the Northern provinces, the provincial agencies under the PPC are responsible for the three steps set out above. Given the importance of rural infrastructure to poverty reduction and socio-economic development, several international partners have been supporting the government of Vietnam for several years in order to improve rural infrastructure in northern Vietnam. These include: The Asian Development Bank has financed seven rural infrastructure projects, the most recent being: the Rural Infrastructure Sector Project, the Emergency Rehabilitation of Calamity Damage Project, and the Integrated Rural Development Sector Project in the Central Provinces. Although each focuses on poor areas, including rural areas, none focus on the northern mountains; The World Bank has implemented the Northern Mountains Poverty Reduction Project, which include support to micro- and small-scale infrastructure projects. The Second Phase of the Project is to start in 2010, with funds for a large number of local infrastructure projects, including village roads; The Japanese Government through Small-Scale Pro-Poor Infrastructure Development projects (SPL I – SPL VI) since the early 1990’s. Projects have included a focus on Northern Mountains. The new loan for Small-Scale Pro-Poor Infrastructure Development Project (III) (SPL VI) should start up in 2010; The International Fund for Agricultural Development (IFAD) has supported infrastructure development in rural parts of northern Vietnam through the Rural Income Diversification Project in Tuyen Quang Province and the Decentralised Program for Rural Poverty Reduction in Ha Giang Province. A major constraint to all infrastructure in Vietnam is operations and maintenance of infrastructure after construction. By international standards, and even when compared to neighboring countries, Vietnam has not yet found the mechanisms to ensure that adequate operations and maintenance takes place. This is particularly true for rural infrastructure that is under the responsibility of sub-national agencies or district Peoples Committees or local communes. 1.2.2 Climate change policy Overall, adaptation to climate change is guided by the ‘National Target Programme to Respond to Climate Change’5 (NTP). This target programme sets out the need for a series of assessments, plans and research projects in order to develop capacity to adapt to climate change. As a national programme, its scope covers all sectors and all provinces. Implementation is to be coordinated by the Ministry of Natural Resources and Environment (MONRE). Although the NTP adopts a mainstreaming approach, as it provides guidance on actions in all sectors, it does not set out the specific investments to be made. It is mainly a foundational planning document, setting out information and knowledge needs and the steps required to gather the information and knowledge. The NTP also directs each Ministry and each province to prepare sectorial/provincial target programmes to respond to climate change. As of yet, MARD is the only Ministry to have prepared such a target programme (see next paragraph). The ‘MARD Action Plan Framework for Adaptation and Mitigation of Climate Change of the Agriculture and Rural Development Sector Period 2008-2020’ (the MARD Action Plan), sets out initial actions 5 Ministry of Natural Resources and Environment, 2008 Page 11 related to agriculture and rural development, and covers to some extent rural infrastructure. The MARD Action Plan has the following five Tasks: Conduct a communication and information programme to disseminate knowledge and experiences to enhance awareness of CC impacts and adaptation and mitigation activities of the sector; Develop human resources and conduct studies to develop and consolidate scientific foundations for providing adaptation and mitigation solutions; Develop a policy system and integrate CC in sectoral development programmes; Promote international cooperation in CC adaptation and mitigation in the sector; Priority activities for implementing adaptation and mitigation policies in the agriculture and rural development sector. The MARD Action Plan promotes a comprehensive approach, across all sub-sectors and down to all levels of government. This Action Plan includes a series of assessments, planning and research projects in order to develop understanding and capacity to adapt to climate change. However, the Action Plan does not set out the specific measures to be taken to adapt. Again, it is more of a foundational planning document. 1.3. Long-term Solution and Barriers to Achieving the Solution 1.3.1 Preferred situation. As can be seen from the previous sections, the Vietnamese government (including a range of national agencies as well as provincial and local agencies) is undertaking a large programme to develop rural infrastructure in order to reduce poverty. This programme has been ongoing for several years, and is likely to take many more years before the problems are resolved. The infrastructure development has benefitted from, and will continue to benefit from, broad support from international development partners. However, as has also been made clear in earlier sections, this infrastructure is at danger from climate change, notably from increased flooding, water flows, landslides and soil erosion. In order to reduce and limit the damage from climate change, the preferred situation would be: National enabling environment. The national laws, regulations and standards would provide incentives to local agencies to prepare and implement infrastructure that is not at risk from climate change. More importantly, national level agencies would have the knowledge and understanding to provide information and technical support on climate change scenarios and impacts that is useful to supporting investment decision-making at the infrastructure project level. Also, national agencies would provide the tools and expertise to support local agencies as they develop their infrastructure, and to support them technically through all stages of the planning and project cycles. Provincial capacity. In the Northern provinces, the agencies would have the information, tools and expertise necessary to plan provincial development and construct/rehabilitate infrastructure that is resilient to expected climate related impacts. This would include detailed information of the types and geographical distribution of climate change and the likely impacts, knowledge of alternative approaches, and knowledge of how to assess and compare costs. In addition, the consulting companies would have the knowledge to design, construct and supervise infrastructure projects that are climate proof. There would be the necessary technical specifications and tools for assessing cost-effectiveness. Page 12 First-hand experience on how to climate-proof infrastructure projects in a cost-effective manner would be available. Ultimately, all rural infrastructure projects should be constructed in a manner to be resilient to expected climate change, and this should be done in a manner whereby the benefits of the increased resilience greatly outweigh the increased construction costs. It should also be done without causing delays to the approval and implementation of infrastructure projects. 1.3.2 Barriers to reaching the preferred situation. Currently, the national level policy, legislation, standards and guidelines do not provide the incentives, mechanisms or information necessary to stimulate the climate proofing of rural infrastructure. The standards were prepared some time ago, and do not account for the increased likelihood of climate related events. There are no detailed specifications related to dealing with climate change. There is little flexibility with regards to cost-norms, so local developers cannot adapt easily. There is no guidance from the national level on how to mainstream climate change into plans or into projects. Although some flexibility is allowed at provincial level, this is currently insufficient. Finally, nationally, investment funds are limited, and the additional costs of climate-proofing a project are unlikely to be funded in the present context. The level of expertise, nationally, regarding how to plan, design and construct climate-proof rural infrastructure is limited. There is not the combined expertise to assess risks, to undertake cost-benefit analysis and to integrate climate scenarios. This is exacerbated by the inadequate information on climate change and its likely impacts. At present, there is no accuracy in climate models beneath the regional level. When assessing rural infrastructure, project experts can only estimate future climate risks by extrapolating present risks. It is not possible to assess a project site and determine the likely climate related risks, to know: where there will be a problem, how often, and how significant. At provincial level, amongst decision-makers, although there is a general acceptance that climate change exists, there is no understanding of how it could affect infrastructure in the province and what the economic implications will be. There is even less understanding of what could be done to adapt infrastructure. The understanding is too coarse, and cannot be used to support project design. No provinces have developed strategies to address climate change impacts on infrastructure, nor have mainstreamed climate change into the provincial plans. At provincial level, decision-makers have many day-to-day priorities and challenges - they are under pressure to roll out new infrastructure projects to serve poverty reduction. They are unable to adequately consider long-term issues such as climate change. The very long-term nature of climate change makes it especially difficult to integrate into local investment decision-making. The incentive structure currently focuses on getting the infrastructure constructed, and not on accounting for long-term threats such as climate change. Moreover, at provincial level, there is a general perception that adapting to climate change will create additional problems, notably to significantly increased project costs, and to significant delays in designing/approving/implementing projects. The region already faces climate risks, and addressing these is part of the baseline. However, climate change will lead to increased frequency and intensity of extreme events, and currently there is no capacity to anticipate or respond to this risk. There are currently no examples of just how to climate-proof infrastructure in the context of northern Vietnam. The idea of ‘climate-proofing’ remains vague and conceptual. This is evident from the NTP and the MARD Action Plan, both of which focus on assessments and planning, and neither of which provides a clear strategies or set of activities in order to adapt, and so the approach to be taken is not clear at local levels. In Vietnam, national, provincial and local stakeholders do not know what a climate proofed Page 13 infrastructure project would look like, and so are unable to develop one, and even less able to allocate financing to one. In addition, there are a series of specific capacity gaps at provincial level. The rapid capacity assessment undertaken in the preparation of this project (see summary in Annex 4) identified the following capacity gaps at provincial level: Senior and mid-level government personnel have very limited knowledge of climate change; As of yet, national information and planning documents on climate change have not been widely disseminated; The main sources of information on climate change are TV, radio and newspapers; There is some confusion with regards to climate change, its likely manifestation, and its likely impacts on rural development and infrastructure. Notably there is often a confusion between the environmental impact of investments and the potential impacts of climate change on investments; In many cases, climate change is interpreted as a component of natural disasters (flooding and landslides); The long term nature of climate change makes it difficult for system/individuals to respond. I.e. individuals have no incentive to plan for potential impacts 10, 20 years into the future. Likewise, procedures and guidelines do not allow the use of scenarios for planning/decision-making; There is no local specific information available on climate change. The manifestations of climate change at the project or catchment level are not known - i.e. localized scenarios do not exist. This means that even those tasked/willing to address climate change can only do limited things; The efficiency and reliability of information exchange on climate change within and across departments is limited. Local consulting companies are responsible generally for designing, construction and supervision infrastructure projects. At present, they have neither the knowledge not the incentive to integrate climate risks into their work. 1.4. Stakeholder Analysis During the project preparation process, a broad range of national, provincial and local stakeholders were consulted, including both governmental and non-governmental organizations, through bilateral interviews, field surveys and workshops. The key international partners involved in climate change adaptation and in poverty reduction in the northern mountains were also consulted. Table 4 below summarizes the responsibilities of the most pertinent governmental and non-governmental Vietnamese stakeholders that were consulted during the project development. Stakeholders Relevant responsibilities Ministry of Agriculture and Rural Development (MARD) MARD Several Departments have responsibilities related to rural development and improvements of rural infrastructure, notably Department of Construction Management, and Department of Dyke Management and Flood Storm Control. Page 14 MARD – Agriculture Project Responsible for preparation and oversight of rural infrastructure Management Board (APMB) projects. Hence, holds some responsibility for mainstreaming climate change into such projects. Will be partly responsible for disseminating lesson learnt across Vietnam. MARD - Department of Science, Technology and Environment/ Standing Office for Climate Change Adaptation (OCCA) MARD - Department of Dyke Management and Flood Storm Control Responsible for preparation and oversight of MARD strategic response to climate change. Hold technical knowledge and skills on climate change impacts related to agriculture and rural development. Responsible for many issues related to disaster management in northern Vietnam, including: Vietnamese Flood control system; dyke management operations; operations of floods and storm control; plans for dykes, floods and storm control. MARD - National Institute of Responsible for preparation of long term plans and strategies related to Agriculture Planning and rural development, including infrastructure. Projection MARD - National Centre for Prepare plans, strategies, policies and standards/regulations related to Rural Water Supply and water supply in rural areas. Environmental Sanitation. MARD – Department for water Prepare plans, strategies, policies and standards/regulations related to resources. irrigation. Ministry of Natural Resources and Environment (MONRE) MONRE Lead role in addressing climate change issues across all sectors. Standing Vice Chair of the National Steering Committee for the National Target to Respond to Climate Change (NTP), and Chair of the Executive Board of NTP, hosting the office of the Standing Office of the NTP. MONRE - Department. of Prepare draft Guidelines to sectors/provinces on how to implement Meteorology, Hydrology, and NTP and how to prepare Action Plan for responding to climate Climate Change change. MONRE – Viet Nam Institute of Key role in undertaking research in the field of climate change Meteorology, Hydrology and (includes preparing scenarios, adaptation measures). Environment MONRE - National Hydro Key role in managing all issues related to meteorology and hydrology Meteorological Service of (observation network, data collection, short and medium term Vietnam forecasting – for meteorology, hydrology and some environmental factors). Other Ministries Page 15 Ministry of Planning Investment (MPI) and Performs the functions of State management over planning and investment, including the provision of general advice on strategies, planning and plans on national socio- economic development, on mechanism and policies for general economic management and some specific fields, on domestic and foreign investment, etc. Ministry of Transport (MOT) Prepare national master plans and strategies covering rural transport infrastructure. Issue policies, laws and by-laws covering rural transport infrastructure. Issue standards covering rural transport infrastructure. Ministry of Construction (MOC) Prepare national master plans and strategies covering urban water supply and sanitation, including water supply and sanitation in small urban areas. Issue policies, laws and by-laws covering water supply and sanitation infrastructure. Issue standards covering water supply and sanitation infrastructure. Provincial Agencies Provincial People’s Committee Takes key decisions on sustainable development and guides overall (PPC) development. Provincial Departments of Responsible for executing mandate of all MARD departments at the Agriculture and Rural provincial level. This includes the planning, oversight and monitoring Development (DARD) of rural infrastructure projects related to agriculture. Provincial Departments of Responsible for executing mandate of MPI at the provincial level. Planning and Investment (DPI) This includes coordinating socio-economic planning. Provincial Departments of Responsible for executing mandate of all MONRE departments at the Natural Resources and provincial level. This includes drafting provincial action plan to Environment (DONRE) respond to climate change. Provincial Departments construction, transport, (DOC, DOT). of Responsible for executing mandate of concerned Ministries at the etc provincial level. Decide on measures to maintain roads and respond to landslides. Provincial Committee for Flood Responsible for responding to natural disasters. Management and Search and Rescue Others Page 16 Media organisations Inform public on climate change and related issues. NGOs and Mass movement Support people to implement provincial plans, eg in responding to organisations (e.g. Farmers disasters, and implementing awareness raising campaigns in line with Association, Vietnamese Red action plan. Cross) Business Units and private sector (provincial, and local branches of national companies). Responsible for maintaining infrastructure, including clear-up after land-slides and disasters. Based on a competitive selection process, companies will be responsible for the design, supervision and construction of infrastructure projects. Table: 4: Summary of stakeholders Based on these consultations and the related analysis, a stakeholder involvement plan was prepared (see Section 2.9), which outlines the likely roles of the national and local partners in the project implementation. Page 17 2. STRATEGY The Project Objective is to increase the resilience and reduce vulnerability of local, critical economic infrastructure in the northern mountains areas of Vietnam to the adverse impacts of climate change and to support a policy framework conducive to promoting resilient northern mountains zone development. The project will contribute to the preferred situation (as described in section 1.3.1) by: demonstrating how to climate-proof rural infrastructure projects; developing capacity in northern provinces – with a focus in two provinces – to plan for climate change and to design and implement infrastructure projects that are climate resilient; and, making critical interventions at national level in order to make the enabling environment more conducive to climate rural resilient infrastructure. 2.1. Project Rationale and Policy Conformity This project is consistent with pertinent recommendations from the UNFCCC Conference of Parties (CoP) and is in alignment with Vietnam’s Second National Communication (SNC) to the UNFCCC. It conforms with CoP guidance under the Adaptation window of the Special Climate Change Fund (SCCF) as it implements high priority interventions to assist urgent adaptation needs in the priority identified area of infrastructure development. Also, it supports capacity building for preventive measures in areas prone to extreme weather events. The Project catalyzes and leverages co-financing resources from bilateral and multilateral sources. The GEF/SCCF financing will help to cover the additional costs of achieving sustainable development imposed on Vietnam by the impacts of climate change; it is country-driven, cost-effective, and will integrate climate change risk considerations into rural infrastructure projects in areas with high poverty. These are priority interventions and eligible under the SCCF guidelines. The project focus of safeguarding Vietnam’s rural infrastructure against future climate risk by pursuing a range of adaptation measures in the field of infrastructure resilience and capacity development is aligned with the scope of expected interventions as articulated in the SCCF programming paper. As climate impacts fall disproportionately on the poor, the project recognizes the link between adaptation and poverty reduction (GEF/C.28/18, 1(b), 29), and the main ultimate beneficiaries are poor people in remote mountainous regions of northern Vietnam. 2.2. Country Ownership: Country Eligibility and Country Drivenness Vietnam ratified the UNFCCC on 16 November 1994 and submitted its INC in 2003. Vietnam is fully eligible for funding from UNDP and for support from ADB. The GEF Operational Focal Point ratified this project by letter on 8 December 2008. The Project is guided by and is consistent with the following national policies/plans: The SEDP 2006-2010 and the forthcoming SEDP 2011-2015. Both the previous SEDP and the forthcoming one focus on poverty reduction, with an emphasis on disaster stricken areas and on improving rural infrastructure. The project supports those initiatives; Page 18 The SNC uses projections for 21st century carried out in 2009 by the Government of Vietnam based on a range of emissions scenarios6 which confirmed the vulnerability of the northern mountainous regions; The NTP. In particular, this project contributes to the following Specific Objectives of the NTP: (a) to assess climate change impacts on every sector and locality; (b) to identify measures to respond to climate change; (e) to enhance public awareness, responsibility and participation; and, (g) to mainstream climate change issues into socio-economic, sectoral and local development strategies and plans; The MARD Action Plan. Notably, it contributes directly to two of the three stated General Objectives, namely: “ensuring the stability and safety of residents in cities and different zones and regions, especially ….. mountainous areas”; and “ensuring the maintenance of dyke and infrastructure systems…...”. National stakeholders and MARD policy makers, and the GEF Operational Focal Point and the UNFCCC Focal Point, have been fully involved in the development of the project proposal, through regular bilateral meetings, regular sharing of documentation, and their participation in at least two consultative workshops. The United Nations activities in Vietnam are guided by the United Nations One Plan, 2012-2016, whose overall aim is to work with the Government and people of Viet Nam to ensure a balance between economic, human and sustainable development objectives, directing its efforts to supporting the Government to achieve inclusive, equitable and sustainable growth, access to quality essential services and social protection, and enhanced governance and participation. These three ‘Focus Areas’ form the overall conceptual framework for the One Plan 2012-2016 and are aligned to the Socio-Economic Development Plan (SEDP) 2011-2015, which has the following key pillars: economic development; education, training, science and technology; social fields; resources, environment and sustainable development. This project contributes to the first focus area of inclusive, equitable and sustainable growth of the UN One Plan Outcomes. Specifically, as per UNDP commitments under the UN One Plan (2012-2016), the project directly contributes to the Outcome 1.3“By 2016, key national and sub-national agencies, in partnership with the private sector and communities, have established and monitor multi-sectoral strategies, mechanisms and resources to support implementation of relevant multilateral agreements and effectively address climate change adaptation, mitigation and disaster risk management” and its related output 1.3.1 “Planning and investment processes are climate proofed and specific programs have been formulated and operationalized for long-term adaptation to reduce climate change vulnerabilities”. The key institutions responsible for rural infrastructure development are the Ministry of Agricultural and Rural Development and the Provincial Peoples Committee. Under the PPC, the main agency responsible is the Provincial Department of Agriculture and Rural Development (DARD), with appropriate support from the Departments of Construction and Transport (DOC, DOT).The main institution responsible for coordination of adaption to climate change is the Ministry of Natural Resources and Environment (MONRE), with support in provinces from the Provincial Department of Natural Resources and Environment (DONRE). All these institutions were involved in the preparation of the project, and will be involved appropriately in its implementation. The main legal documents guiding this project are: 6 Climate Change, Sea Level Rise Scenarios for Viet Nam. MONRE, Government of Vietnam (2009) Page 19 Decision 158/2008/QD-TTG, of the Prime Minister, on the Approval of the National Target Programme to Respond to Climate Change; No: 2730 /QD-BNN-KHCN of the Minister of Agriculture and Rural Development, on the Issuance of the Action Plan Framework for Adaptation to Climate Change in the Agriculture and Rural Development Sector Period 2008-2020. 2.3. Design Principles and Strategic Considerations Fit into overall SCCF Portfolio The proposed project is fully aligned with UNDPs thematic focuses on adaptation to climate change. In line with the UNDP/GEF M&E Framework for Adaptation, this proposed project makes direct contributions: Thematic Area 4, Disaster Risk Management, Outcome 3, “Capacity developed at the local level to implement climate-related disaster prevention measures, such as improved settlement construction, livelihoods protection, and/or land and water management practices”, and Thematic Area 1. Agriculture/Food Security, Outcome 3: “Climate risks integrated into design and decision-making for agriculture-related investments” and Thematic Area 2. Water Resources and Quality, Outcome 4: “Local level capacity enhanced to cope with climate change impacts on water resources”. The proposed project would become one of a relatively small number of SCCF investments worldwide and an even small number of activities within the Asia Pacific region. The proposed project fits very well into this relatively rarified portfolio given that it focuses on key SCCF priorities of adaptation to climate change, focusing on the transport sector and equally helping to ensure longer term economic diversity in one of Vietnam’s most isolated and vulnerable regions. It is one of the few SCCF projects with an explicit focus on rural infrastructure and the only SCCF initiative in Vietnam – a country generally acknowledged to be one of the most vulnerable countries to climate change within the region. As described in Section 1.2.1 above, the government, with international partners, has a broad programme to expand and upgrade rural infrastructure. This project is linked into that programme and holds the potential to be significantly up-scaled as a result. The entry point for this project into that national programme is the “Sustainable Rural Infrastructure Development Project in the Northern Mountains (SRIDP)”. The SRIDP is to be financed by the Government and an ADB loan. It is scheduled to start operations in 2010, with funding of US30.4 million from the Government and US$108million through a loan from ADB. SRIDP is described in the following section. Detailed information on the SRIDP project is provided in the relevant MoU between Government and ADB in Annex 12. Linkages to national processes The SRIDP has been designed to address the persistent and significant levels of poverty, particularly amongst the ethnic minority communities, in the Northern Mountains provinces. The SRIDP will provide resources in the 15 Northern provinces to rehabilitate and, in some situations, establish new rural infrastructure to improve access to services for the target population. The SRIDP will be implemented under a sector modality whereby a number of infrastructure subprojects – typically 2-3 per province - will be completed in each province. Page 20 To finance the SRIDP, the ADB will issue a loan to the national government, which, in turn, will provide grants to the participating provinces. The provinces will use these funds to undertake rehabilitation of rural infrastructure. Through the detailed design phase, subprojects have been identified by the provinces using participatory approaches and in line with criteria. These criteria include the need to demonstrate a significant impact on poverty amongst its target beneficiaries. This SCCF project builds on the baseline provided by the SRIDP project, and so it is inherently linked to national processes to reduce poverty and to improve the quality of life in northern mountainous rural areas. In order to further facilitate linkages into national processes, the SCCF project will also be closely coordinated with three recently started capacity development projects being financed by UNDP and implemented by key national agencies, namely: “Strengthening national capacities to respond to Climate Change in Viet Nam, reducing vulnerability and controlling green house gas (GHG) emissions”, in collaboration with MONRE and MARD; “Strengthening Sustainable Development and Climate Planning”, in collaboration with MPI; “Strengthening Institutional Capacity for Disaster Risk Management in Vietnam, including Climate Change Related Disasters”, in collaboration with MARD. With support from the international community, the Vietnamese government is currently implementing a number of further initiatives related to climate change. These focus mainly on assessment, research and planning, very few of them include actual activities to adapt, and none of these are in the northern mountainous regions. Annex 5 provides basic information on the most relevant ongoing and planned initiatives supported by international partners. The project will link with all concerned project as appropriate in order to develop synergies and increase lessons learning. National and local benefits: As explained previously, the project is directly linked to ongoing efforts to reduce poverty. As such, it makes a direct contribution to achieving the Millennium Development Goals (MDG), most notably MDG 1. The total rural population of the 15 Northern Provinces is 10,237,000. Ultimately, these people will benefit from the improved, climate resilient infrastructure to be supported through the project. Many of the project’s more detailed capacity development activities are to focus into two representative provinces, Bac Kan and Son La, with respective rural-based populations of 262,000 and 898,000. Ultimately, these people will benefit from improved, climate resilient infrastructure. Background information on Bac Kan and Son La Provinces are provided in Annex 6. The project will directly demonstrate improved climate resilience on four infrastructure sub-projects under the SRIDP. These sub-projects focus on road rehabilitation, irrigation system rehabilitation and river embankment protection. The demonstration sub-projects are: Upgrading rural road from 108 Road to Muong E in Thuan Chau District (in Son La Province); Upgrading irrigation system and landslide protection embankment in Tham Mon Commune, Thuan Chau district (in Son La Province); Cau river bank protection (in Bac Kan Province), and; Page 21 Upgrading rural roads of two districts: Ba Be and Bach Thong (in Bac Kan Province). Detailed information on the demonstration sub-projects is provided in Annex 7. As can be seen from Annex 7, typically, a sub-project will improve the resilience of a road, or an irrigation system, or river embankments. The population using this infrastructure will directly benefit, in terms of access to services and markets, and ultimately will benefit in terms of income, health and/or education. A typical SRIDP infrastructure sub-project aims to serve 2-3,000 people. Hence, with four sub-projects, up to 10,000 people may benefit directly. The indirect benefits as lessons learned are spread to other provinces through activities in the other project components are significantly greater. Comparative advantage. The project is within the comparative advantage of ADB as it emphasizes investment and related technical assistance by blending grant financing from GEF and other sources with investment financing from ADB. As one of the Vietnamese government’s largest financing partners for infrastructure development, ADB brings to the project its strong understanding of social, economic, environmental, and institutional challenges and opportunities to prepare climate resilient infrastructure in Vietnam. It brings a strong technical expertise related to infrastructure development. Furthermore, ADB’s long and significant support to rural areas in Vietnam also enables ADB to garner political support from participating provincial and district level governments to implement the project in a positive and cooperative manner. ADB also brings substantial policy experience through its assistance to the formulation of numerous laws, decrees, circulars, regulations, and guidelines in relevant agencies such as MONRE, MARD and MOC. UNDP’s comparative advantage is in capacity development and policy support, which is an essential component in the development of a climate resilient rural infrastructure. Through this SCCF project, these aspects will promote an enabling environment for government-driven infrastructure investments and enable informed decision-making. They will also lead to significant provincial level capacity. UNDP has been a key partner for Vietnam in establishing an effective governance system with a view to promoting sustainable human development, and in harmonizing the services provided by agencies within the UN system. UNDP has been working with MONRE, MARD, MOC and MPI on the mainstreaming of environmental and climate risk management issues into sectoral policies. The proposed adaptation project will build on these efforts and enhance the government’s adaptive capacity in face of changing climatic conditions. Hence, the project will be able to efficiently connect to the central policy processes that currently shape Viet Nam’s approach on how to deal with evolving climatic risks. 2.4. Project Objective, Outcomes and Outputs/Activities The Goal of the project is to promote climate-resilient development in the northern mountainous regions of Vietnam. The Objective of the project is to increase the resilience and reduce vulnerability of local, critical economic infrastructure in the northern mountains areas of Vietnam to the adverse impacts of climate change and to create a policy framework conducive to promoting resilient northern mountains zone development. In order to achieve this Objective, four Outcomes will be delivered: Page 22 Outcome 1 – Climate Change Adaptation integrated into policy, strategy and planning that relates to rural infrastructure – specifically agriculture, rural water and rural roads (UNDP managed); Outcome 2 – Enhanced capacity to adapt/climate-proof rural infrastructure investments and provincial/local area planning (UNDP managed); Outcome 3 – Effective climate-resilience measures mainstreamed into the MARD rural infrastructure program. (ADB managed) (this Outcome is described in detail in the concerned ADB TA paper, included in Annex 13); Outcome 4 – Lessons learnt and best practices from Outcomes 1, 2 and 3 are disseminated to stakeholders and development partners (UNDP managed). Outcome 1 focuses on the national level enabling environment, making it more conducive to adaptation in rural plans and rural infrastructure projects. It will develop practical tools for practitioners, and it will prepare recommendations for future policy and standards. Outcome 2 focuses on provincial capacity to plan, design, implement and monitor infrastructure projects. Under this Outcome, basic adaptation capacity will be developed for all 15 Northern provinces. Next, in two provinces, Bac Kan and Son La, in-depth capacity to assess climate change, to prepare vulnerability maps, to develop strategies and to adapt infrastructure plans will be developed. This will not only build their capacity, but also serve as a demonstration and spring-board for capacity building in other provinces after the project. Outcome 3 demonstrates the mainstreaming of climate change adaptation into 4 diverse infrastructure SRIDP sub-projects. Through a learning and participatory process, Outcome 3 will demonstrate that climate resilience can be increased at an acceptable cost and without significant delays to the investment implementation schedule. The activities, challenges, lessons and practices learnt under Outcome 3 will also serve as a learning school to feed the capacity development in Outcomes 1 and 2. Outcome 3 will also include training on project design and climate change, and will lead to the development of technical specifications for infrastructure applicable in northern mountainous regions. Outcome 3 is financed by SCCF and managed by ADB, in parallel to components 1, 2 and 4. The whole approach is ‘capacity development by doing’. In this, the demonstration sub-projects will serve as a school of learning, and national and provincial level capacity will be developed by involving concerned institutions and individuals in all steps of the demonstration sub-projects. With the guidance of local and international experts, MARD and technical experts will play a key role in planning, designing, supporting, monitoring and implementing provincial and local activities – thereby developing their capacity to replicate after the project. Overall, the lessons learnt and experiences acquired under Outcomes 1, 2 and 3 will be collected, codified and documented. Under Outcome 4, these lessons will be disseminated in a targeted manner across Vietnam and to other countries. This is one of the first infrastructure projects in the SCCF portfolio, and one of the first projects to take adaptation measures in rural Vietnam, hence every effort will be taken to ensure lessons are learnt and disseminated. The objectives and outcomes of the proposed project are closely aligned to the UNDP/GEF thematic focus areas on climate change adaptation which include: reducing vulnerability to climate change and local and national levels; increasing adaptive capacity at all levels; and promoting the transfer and adoption of suitable adaptation technologies. More details of outputs and activities under each Outcome are provided in the following sections, and in Part III – the Strategic Results Framework. Outcome 1 – Climate Change Adaptation integrated into policy, strategy and planning that relates to rural infrastructure – specifically agriculture, rural water and rural roads (UNDP managed); Co-financing amounts for Outcome 1: $3,265,000 SCCF project grant requested: $398,500 Page 23 Without SCCF Intervention (baseline) In the baseline, in the rural infrastructure sectors, climate change will not be mainstreamed into policies, plans or programmes. For example, the national, sectoral and provincial five-year plans will not be adapted to climate change. The procedures to prepare the plan will not include steps or mechanisms to incorporate climate change. Future strategies (e.g. the Rural Transport Strategy) will not be adapted to climate change. In the baseline, efforts to adapt to climate change will mostly focus on general planning, assessing and researching climate change, but there will be few concrete measures leading to real changes. The National Target Programme will support a series of studies leading to increased understanding, but will not support concrete action. Likewise, the MARD Action Plan will lead to increased understanding in the agriculture and rural development sector, but not to specific changes or investments. Also, in the baseline, provincial actors that wish to address climate change will not benefit from adequate support from national agencies. The baseline also consists of several ongoing projects financed by UNDP which will address some specific issues related to climate change. These have an overall impact on northern mountains and infrastructure, but are not focused on those issues. These projects are: (1)“Strengthening national capacities to respond to Climate Change in Viet Nam, reducing vulnerability and controlling GHG emissions”. This will develop climate change policy, improve the knowledge base for decision-makers, and provide ongoing technical advice; (2) “Strengthening Sustainable Development and Climate Planning”. This will strengthen sustainable development planning at the national level, mainstreaming climate change, and providing knowledge management and advocacy, and “Strengthening Institutional Capacity for Disaster Risk Management in Vietnam, including Climate Change Related Disasters”. With SCCF Intervention (adaptation alternative) The SCCF intervention will lead to the preparation of tools that will strengthen the ability to integrate climate change into the planning, design, implementation and monitoring of rural infrastructure projects. It will also prepare recommendations related to policies and standards; and these recommendations will ultimately feed into the incentive framework for adaptation. The first step will be to prepare a document identifying and analysing all policies, standards and strategies related to rural infrastructure. The dozens of existing policies and strategies, and the hundreds of existing standards, will all be reviewed, screened, and the best entry points for mainstreaming climate change will be determined. These priority policies and strategies will then be assessed in a participatory manner, and recommendations regarding mainstreaming climate change will be developed and introduced to MARD. The next step focuses on guiding planners. Under this step, building on the findings from Outcome 3 (below), a Technical Guidance Paper will be prepared that provides guidance on integrating climate change into provincial planning related to rural infrastructure (i.e. in the agriculture, irrigation and rural transport). In the baseline, national government agencies issue guidelines on how to prepare plans, and on what should be the contents of sectoral plans at provincial level. The Technical Guidance Paper will provide additional, optional guidance to provincial planners, in DPI, DARD, DOT and DOC, on: how to utilize existing information on climate change, how to assess the vulnerability of plans to climate change, how to assess likely climate change impacts, how to assess likely costs of climate change, and how to determine cost-effective, alternative plans that are less vulnerable to climate change. The guidance will be appropriate for rural areas in the Northern Mountains. Over the long term, this may lead to the relocation of some investment projects. Page 24 The next step focuses on guiding project developers. Under this step, a Manual to guide the design, construction and implementation of rural infrastructure projects will be prepared. The existing guidance on the construction of rural infrastructure is outdated, and does not address climate change. The Manual will supplement the existing guidance. This supplement will guide provincial stakeholders as they go through each step when preparing infrastructure projects and addressing climate change. The Manual will provide guidance on: assessing likely climate change at the project site, assessing likely physical impacts of climate change, assessing likely economic impacts of climate change, assessing costs of likely impacts, identifying alternative approaches with costs, and comparing alternatives. The Manual will include a tool for assessing alternative options and determining the costs/benefits of baseline and climate-proofed alternatives. The Manual will build on the findings from Outcome 3. It will also build on best practices from other countries. It will also review measures used across Vietnam to increase resilience to climate events. In the long term, construction standards and codes will need revising. However, that is beyond the scope of this project. However, this project will prepare a technical discussion paper. This paper, prepared in a participatory manner, will review priority standards, discuss strengths and weaknesses regarding climate change, and make initial recommendations on which standards to revise. This paper will feed into later government efforts to revised standards and codes. The Outputs and indicative Activities for Outcome 1 are listed below. Output Indicative Activities 1.1 Documented review 1.1.1 Prepare a list of all concerned policies, strategies and of institutions and standards; existing policies, 1.1.2 Identify the most related policies, strategies and standards for strategies and standards further study; related to rural 1.1.3 Prepare 4 papers (respectively on roads, irrigation, water infrastructure. supply, embankments) which describe how policies presently take account of climate change and identify the priority policies, strategies for modification in order to better account for climate change. 1.2 Technical paper 1.2.1 Review the findings of the demonstration projects (Outcome providing guidance on 3) mainstreaming climate 1.2.2 Review the process to prepare long-term Socio-Economic change into sectoral Development Plans (e.g. 2016-2020, etc,) and identify ‘entry planning related to rural points’ in the process/Plans where climate change issues can infrastructure in northern be mainstreamed; areas. 1.2.3 Based on lessons learnt from Outcome 3 demonstration Note This contributes to projects, and on international best practices, prepare a detailed NTP Activities 13, 14 and technical paper providing guidance on climate change issues 15, and to MARD CC to be used by planners when preparing plans. Action Plan Activity no. 3. 1.3 Manual on 1.3.1 mainstreaming climate change into the design of rural infrastructure Collect information from other countries on possible processes and measures to adapt rural infrastructure (roads, irrigation, water supply and embankments) projects to climate change; Page 25 projects. 1.3.2 Collect information on measures used in Northern Vietnam to increase resilience to climate events (e.g. vented drifts, Note This contributes to bamboo planting) and on the process to choosing to use these NTP Activities 15 and 19, measures; and to MARD CC Action Plan Activity no. 5.2. 1.3.3 Prepare a technical paper describing the strengths of each measure and its potential in northern mountainous Vietnam; 1.3.4 Based on the lessons learnt from Outcome 3 demonstration projects and the technical specifications coming from those demonstrations, prepare a detailed Manual to be used by provincial departments and/or consultants in order to mainstream climate change into rural infrastructure projects (in line with budget, this Manual may not cover all subsectors). The manual will introduce measures, specifications, background institutional and policy issues. It will guide the process of assessing climate change vulnerability, identifying options, and undertaking cost benefits. 1.4 A technical 1.4.1 Collect basic information on all standards/codes related to discussion paper on rural infrastructure (on roads, irrigation, water supply, existing standards and embankments) in Vietnam; codes and the 1.4.2 Identify priority standards/codes which would benefit from implications of climate modification in order to adapt to climate change; change. 1.4.3 Based on lessons learnt from Outcome 3 demonstration Note This contributes to projects, propose technical paper discussing the priority NTP Activities 19, and to standards/codes identified in 1.4.2. MARD CC Action Plan Activity no. 5.2 Outcome 2 – Enhanced capacity to adapt/climate-proof rural infrastructure investments and provincial/local area planning (UNDP managed); Co-financing amounts for Outcome 2: $3,500,000. SCCF project grant requested: $596,500. Without SCCF Intervention (baseline) In the baseline, provincial level capacity to adapt and climate proof infrastructure will be very limited. The provinces do not have the incentives, the information, the tools or the expertise to adapt to climate change. Little work is done to adapt. In the past, scientists have prepared disaster vulnerability maps for two provinces, but: (i) these do not account for climate change; (ii) they cover only two provinces, and; (iii) they were prepared for scientific rather than decision-making purposes. Annex 4 provides additional information on the capacity levels at provincial level and below. In the baseline, the ongoing UNDP projects will address some specific issues related to provincial capacity and climate change. “Strengthening national capacities to respond to Climate Change in Viet Nam, reducing vulnerability and controlling GHG emissions”, will support capacity development at national and local levels, and provide ongoing technical advice, though there will be little focus in Northern areas or on the specific issues arising from rural infrastructure planning and investment. Page 26 “Strengthening Sustainable Development and Climate Planning” is strengthening sustainable development planning at the national level with support mechanisms to provincial planning. This includes support to mainstreaming climate change and providing knowledge management and advocacy. It will also be building capacity of MPI and Provincial DPIs. With SCCF Intervention (adaptation alternative) The SCCF funds will be used to develop the capacity of a range of key stakeholders across the Northern Provinces, as described in the following passages. The first step will be to undertake a coarse vulnerability assessment of all 15 Northern provinces. Based on latest information and best available scenarios, likely climate changes will be projected for northern Vietnam, with national and international experts working together as a means to develop in-country capacity. The information prepared will be used to develop scenarios on how climate change and its impacts may be distributed. This information will be combined with relevant economic, social and environmental data. The maps will indicate vulnerability for each type of ecological zones. This information will be used as a basis for much of the capacity building in the later activities and provide inputs into local area planning. The second step will be to raise awareness of decision-makers, in order to increase political support for adaptation measures. The project will support national teams of experts to prepare vital information on climate change and likely impacts on rural infrastructure, and, in turn, on poverty. Provincial and district leaders will be provided this information and related evidence, through workshops and study tours. Likewise these key decision-makers will be given information on the costs and ways of increasing resilience. Next, in the two target provinces, Bac Kan and Son La, the Project will provide more intensive capacity development through the following steps. National and international experts will first develop two detailed provincial level climate change vulnerability maps. These will downscale the best existing scenarios for climate change, and combine with information on (i) past disasters; (ii) mean temperature and precipitation and extremes; (iii) topography; (iv) hydrology; (v) soil types; (vi) poverty, and other factors in order to determine the areas most vulnerable to climate change. This will be sufficiently accurate to distinguish between individual water sheds/sub-watersheds on the basis of vulnerability to climate change within the two provinces. Prepare jointly by national experts, these maps constitute a simple but powerful tool to guides planners. Based on these vulnerability maps, the project experts will support provincial planners to develop a strategy for climate proofing rural infrastructure - the strategy will set priorities, determine criteria and outline a process for decision-making on climate-proofing measures. This strategy will be a key tool for future planning. Next, SCCF funds will support the two provinces to mainstream climate change adaptation into rural infrastructure components of the provincial socio-economic development plans in Son La and Bac Kan. The project will work with PPC, DARD and DONRE during the planning cycle to determine the entry points, undertake a climate assessment of the plans, and integrate measures to adapt to climate change in the plans listed below (based on Strategy prepared above). Depending on timing, these activities may contribute to the preparation of Provincial Action Plans to Respond to Climate Change7. These activities will also develop a simple methodology and then demonstrate mainstreaming of climate change into the rural infrastructure components of the following: Five-year provincial socio-economic development plan; 7 Provinces have been requested by MONRE to prepare Provincial Action Plans to Respond to Climate Change, in line with the NTP. The timing of the preparation of these Plans is to be determined. Page 27 Annual socio-economic development plans; Five year provincial agriculture and rural development plans; Annual provincial agriculture and rural development plans. Finally, the project will provide training to develop a cadre of technical experts able to prepare vulnerability maps and support mainstreaming. Based on a prior training needs assessment, the experts will be provided practical training: on how to use the Manual (Outcome 1) and to apply it; on using GIS for climate change management, and; on developing climate adaptation strategies. This cadre of experts will be available for work in rural, mountainous areas across the fifteen Northern provinces. Given the growing importance of climate change in Vietnam, and the growing use of GIS tools for planning and for risk assessment in Vietnam, it is expected that this cadre of trained experts will continue to be active in this domain for a long period after the project, thereby ensuring the sustainability of this training. In all cases, capacity development will be done ‘through doing’ – national and international experts will work together as a way to hand capacity to Vietnamese expert institutions and, in turn, as appropriate, to Vietnamese government experts. The Outputs and indicative Activities for Outcome 2 are listed below. Output Indicative Activities 2.1 Climate 2.1.1 Collect latest information on scenarios applicable to northern vulnerability Vietnam; assessment (all 15 2.1.2 Using best regional scenarios, determine likely climate changes northern provinces). in Northern mountains of Vietnam; 2.1.3 Using info from 2.1.2, prepare coarse prediction of climate change impacts and distribution across Northern Vietnam. 2.2 Raised awareness 2.2.1 Identify and describe needs in terms of raised awareness. Targets amongst decisioninclude Leaders of PPC and DPC, and Leaders of Provincial makers on impacts of DARD, DPI, DONRE and other provincial departments; climate change on 2.2.2 Based on best practices in Vietnam and Output 2.1, develop an poverty reduction (all awareness raising programme for decision-makers in the 15 SRIDP provinces). Note northern mountainous provinces, develop awareness raising This contributes to NTP material; Activity 5. 2.2.3 Implement the awareness raising programme, for example by organising conferences, or information workshops, or distributing fact sheets, or organising site visits for senior decision-makers. 2.3 Provincial 2.3.1 Using historical data, and local conditions, and lessons from strategies for climate Outcome 3, prepare climate-related risk maps for Son La and proofing rural Bac Kan Province; infrastructure to climate 2.3.2 Based on climate-risk maps (from 2.4.1), and on vulnerability change (based on levels of the population, and on best available climate change Vulnerability impact scenarios, prepare a ‘vulnerability map’ for both Son La and assessment and maps) Bac Kan Provinces. This map will identify the places that are (Son La and Bac Kan most vulnerable to climate change in the Province; provinces only). 2.3.3 In Son La and Bac Kan, prepare a provincial strategy for climate Page 28 Note This contributes to MARD CC Action Plan activity 2.2 proofing rural infrastructure. This will set priorities, determine criteria for choosing vulnerable infrastructure, criteria for choosing proofing measures, and will determine the process for preparing cost-benefit analysis and decision-making. 2.4 Climate change mainstreamed into rural infrastructure components of Provincial Development Plans (Son La and Bac Kan provinces only). This is linked to preparation/roll-out of Provincial Action Plans to Respond to Climate Change. Note This contributes to NTP Activity 26 and MARD CC Action Plan activity 3.4. Provinces are currently preparing Provincial Action Plans to Respond to Climate Change – an activity led by MONRE. 2.4.1 Review process to prepare Provincial Action Plans to Respond to Climate Change; 2.4.2 Collect and review long-term plans and sectoral planning for rural roads, irrigation and water supply; 2.4.3Provide training to provincial teams preparing the Provincial Action Plans to Respond to Climate Change; 2.4.4 Use maps and strategy (from 2.3.2 and 2.3.3) to assess exposure of existing infrastructure to climate risks and identify high-risk zones; 2.4.5 Using national guidance paper (from 1.2), and information from 2.3.2/2.3.3, ensure that rural infrastructure components of long term Development Plans in Son La and Bac Kan account for climate change. 2.5 A cadre of experts 2.5.1 Undertake training needs assessment for government experts and able (i) to prepare, provincially based consultants, and identify the most suitable interpret and utilize participants; provincial level climate 2.5.2 Develop training material on preparing vulnerability maps and vulnerability maps and on practical measures to mainstream climate change into (ii) mainstream climate development plans; change into 2.5.3 Using the process to implement 2.3 and 2.4 as a training-model, development plans (all run two sets of training courses covering climate mapping, provinces). vulnerability mapping, GIS, and climate adaptation strategy preparation. Outcome 3 – Effective climate-resilience measures mainstreamed into rural infrastructure programs. (This Outcome is managed by ADB, and financed by SCCF. See separate ADB Technical Assistance Paper in Annex 13 for further information). Co-financing amounts for Outcome 3: $123,320,0008. SCCF project grant requested: $2,000,000 Without SCCF Intervention (baseline) 8 Total ADB loan: $108million of which $16,680,000 Project Management costs. Government SRIDP investment: $30million. Page 29 Current rural infrastructure in Viet Nam is designed according to relevant government standards and specifications. These standards and specifications are rigid, out of date, and tend to focus narrowly on issues such as pavement thickness or width of canal but not at the broader environment in which the infrastructure exists. As a result, current infrastructure can be vulnerable to poor performance, rapid deterioration or failure even under existing climatic conditions. The most damaging impacts are associated with frequent flood events, which cause high volume and velocity of surface water movement. This can cause severe erosion leading to damage to rural infrastructure. The ensuing damage results in high maintenance and rehabilitation costs as well as a loss of benefits while the infrastructure remains in poor condition. At present there are few agreed measures which can be taken in the context of existing design standards to prevent or mitigate these impacts, as alternate methods are either not known, or where known they may not be accepted or considered cost-effective Under the baseline situation, rural infrastructure in the northern mountains region of Viet Nam, including the 45 SRIDP supported rural infrastructure sub-projects, will be constructed according to existing design standards and as a result will be vulnerable to damages caused by climate variability. With the addition of future climate change – which is projected to increase the frequency and intensity of high rainfall events and cause more pronounced dry seasons – existing deficiencies with current rural infrastructure designs will be further exacerbated, leading to higher levels of failure and loss of benefits for communities. Further, in the baseline, government officers and planners are not fully aware of the potential impacts of climate change on their projects and even in cases where there is theoretical knowledge of approaches for adapting to climate change, there is limited practical knowledge and experience. With SCCF Intervention (adaptation alternative) SCCF funds will demonstrate practical, cost-effective and convenient ways to climate proof four subprojects in two provinces: Bac Kan and Son La. Two rural roads, one irrigation scheme and one river embankment will be climate proofed. This will demonstrate that it is possible to increase climate resilience, that adaptation costs can be outweighed by benefits, and that this can be done without causing delays to the infrastructure project cycle. As a result, provincial level decision-makers will be convinced of the advantages of climate-proofing. Also, the four concerned sub-projects will be more resilient to climate related hazards and will yield benefits to local poor people over a longer period (See ADB TA Paper for details of the four sub-projects, including the process to select the sub-projects and selection criteria). The process to selecting these projects was mostly undertaken during the SRIDP project design. The SRIDP selection criteria included: contributing to the strategic objectives of district and provincial socio-economic development plans; compliant with national and ADB’s environmental standards; have no significant resettlement or land compensation implications; located in upland or mountainous districts where the majority of beneficiaries are likely to be ethnic minority poor people; demonstrated local demand for subproject with confirmation by beneficiaries, participating commune, and district authorities, and; demonstrated financing arrangements for routine and periodic maintenance costs after completion of works. Page 30 Next, in order to assess suitability for being included in the SCCF project, the ADB assessed sub-projects in terms of their vulnerability to climate change and the feasibility of adapting them to the impacts of climate change. As a result, four sub-projects were selected to act as demonstration. The four selected demonstration sub-projects are (see Annex 7 for details of screening criteria of these sub-projects): Upgrading rural road from 108 Road to Muong E in Thuan Chau District (in Son La Province); Upgrading irrigation system and landslide protection embankment in Tham Mon Commune, Thuan Chau district (in Son La Province); Cau river bank protection (in Bac Kan Province), and; Upgrading rural roads of two districts: Ba Be and Bach Thong (in Bac Kan Province). The first step under this Outcome will be to develop of a trained cadre of technical personnel familiar with the use of low cost infrastructure protection measures. The emphasis will be on measures previously used in Vietnam and on bio-engineering measures. The next step will be to assess the four sub-projects, to determine climate vulnerabilities in the sub-projects, and to identify potential low-cost climate-proofing measures that are adapted to the rural areas of Vietnam. A list of potential measures will be defined based on a combination of a review of existing knowledge and approaches, with new measures captured from similar programmes across the region. This is likely to include bio-engineering to increase slope stability, or low-cost civil engineering to increase slope stability, or strengthened water flow structures, or strengthened canal and river embankments through bio-engineering and/or low civil engineering. In the case of rural roads important considerations will also include: (i) the choice of pavements that are able to resist erosion arising from raindrops and the movement of water over the pavement; (ii) the height of the road embankments; (iii) the stabilization of the road embankments and side drains; and (iv) the design and sizing of the cross drainage structures and the provision of structures or controlled failure mechanisms to allow high flows of water to cross the road quickly while limiting the damage to a small area. Choices will then need to be made between possible options before detailed design can be performed. There are a number of decision making tools that could be applied at this point including the Community Based Risk Screening Tool (CRisTAL), the USEPA’s Tool for Environmental Assessment and Management (TEAM), and the UK Climate Impact Programme’s Adaptation Wizard. The optimum measures will then be designed in detail and the project will then finance the measures, as a way to demonstrate of low cost local resource methods to climate adaptation. There will be a close link between this component and the capacity development components under Outcomes 1 and 2. The existing in-service training programs and technical training curricula for local institutions will be revised, and low cost local resource approaches for erosion control and embankment slope stabilization will be integrated into the programmes and curricula, among other potential approaches identified by the project. Finally, under this Outcome, technical specifications for erosion control, slope/embankment protection, or water capture and storage, that are pertinent to rural infrastructure in Northern mountains will be prepared, as well as a manual on mainstreaming climate change and variability into the design of rural infrastructure projects. These interventions will allow the project experience to be more effectively scaled-up, by the Government and through other ADB supported projects in Viet Nam, which will increase cost effectiveness. While the cost – benefits of individual measures are likely to be specific to the sites, it is anticipated that measures will follow a “no regrets” approached. Such an approach will aim to enhance the sustainability of infrastructure investments under both existing and projected future climatic conditions. This will improve he cost effectiveness of measures and increase the likelihood of their uptake by government. Activities under Component 3 will be accompanied by a programme to monitor resilience to climate change, and to increase collective understanding of how to increase infrastructure resilience. A key indicator will be to assess the change in relative resilience and/or deterioration rates of the infrastructure Page 31 attributable to the impacts of climate change (as compared to control sites that have not been assisted by the project). The dimensions of the rates and attributes will be further developed during the project, once the designs of the infrastructure sub-projects is completed and resilience strengthening measures identified. To ensure sustainability of the monitoring program, a national institute within MARD will be used, and the development of monitoring indicators will be done as a participatory process as part of the projects learning by doing approach to capacity development. The Outputs under this Outcome: Output Indiactive activities 3.1: Low cost climate proofing measures 3.1.1 suitable for rural infrastructure in northern Viet Nam identified. 3.1.2 3.1.3 3.1.4 3.1.5 Literature review and inventory of potential measures suitable to the project area Mo. 1.5. Survey of existing problems for RI and potential low-cost solutions for increasing climate resilience and infrastructure sustainability in northern mountains provinces. Mo. 3. Assessment of optimal inclusion of disadvantaged groups in the construction and the management and benefits of the demonstrations. Mo. 3. Consolidation of the range of specific climate resilience measures that optimize potential social benefits for use in demonstrations. Mo. 4. Preparation of susceptibility-hazard-risk framework. M4 3.2: Appropriate CC resilient techniques 3.2.1 demonstrated. Finalize selection of demonstration sites and control sites. Mo. 2 3.2.2 Carry out training of implementation personnel. Include at least 25% female. Mo. 4 3.2.3 Site level survey and data gathering. This should include both technical and relevant social data. Mo. 5 3.2.4 Review of provincial climate vulnerability assessment from UNDP component. Mo. 5 3.2.5 Identify appropriate measures. Mo. 6. 3.2.6 Prepare the implementation approach and related documents including social inclusion measures. Mo. 7 3.2.7 Carry out detailed design and cost estimate. Mo. 8 3.2.8 Prepare monitoring framework. Mo. 8 3.2.9 Implement demonstration works in coordination with sub-project implementation. Mo. 8-24 3.2.10 In collaboration with the organization that MARD would select for the long-term performance monitoring and analysis carry out Page 32 performance monitoring of the demonstrations and controls. Mo. 24-36. 3.3: A trained cadre of technical personnel 3.3.1 familiar with the protection measures. 3.3.2 3.3.3 3.3.4 3.4: Recommendations for the integration of 3.4.1 the demonstrated approaches into training curricula, standard design procedures and 3.4.2 contract specifications. 3.4.3 3.5: CC risks and vulnerabilities, and the 3.5.1 potential for applying the measures used in the demonstrations for strengthening the resilience of nearby communities are identified. 3.5.2 3.5.3 In coordination with UNDP, prepare a knowledge dissemination and communication strategy and action plan to include reports, website posting and other knowledge sharing events. Mo. 1-3 Initial briefing and training at the provincial level in relation to CC vulnerability assessment and approaches for increasing the resilience of RI. Mo. 3-7 Initiate dissemination program. Mo. 7-33 Prepare training materials and programs. Mo. 12. Review training curricula, standard design procedures and specifications. Mo. 30 Identify opportunities and needs for incorporating climate resilience measures and techniques. Mo. 32 Prepare recommendation and present to relevant authorities. Mo. 34 For one selected communities within the area of influence of each of the four demonstration sites assess the general trends and issues related to climate change. Mo. 24. Relate the assessment to the broader vulnerability assessment for the northern mountains region. Mo. 30. Complete the assessment report which includes the identification of potential future CC initiatives. Mo. 34. Outcome 4 – Lessons learnt and best practices from Outcomes 1, 2 and 3 are disseminated to stakeholders and development partners (UNDP managed). Co-financing amounts for Outcome 4: $0. SCCF project grant requested: $125,000 Without SCCF Intervention (baseline): In the baseline, as there are no lessons available related to climate change adaptation, there is no system to disseminate lessons, and no dissemination. With SCCF Intervention (adaptation alternative) Page 33 Outcome 4 ensures that all project activities are adequately assessed and the lessons learned from their implementation are captured and disseminated to other provinces and to other countries embarking on similar processes. Adapting to climate change is a relatively new sector and requires innovation. This project is one of the first projects in Vietnam undertaking adaptation measures in northern rural areas. This is also one of the first SCCF projects to focus on rural infrastructure. Hence, it is expected that the project will be a source of vital information on climate change adaptation in a user-friendly way to all relevant stakeholders. Project lessons will be captured through a dedicated data-base, and they will be disseminated using appropriate communication channels and techniques. A communication strategy, to be developed in the project early stages, will identify most appropriate tools from, for example, fact sheets, newsletters, brochures, DVD, mini-films. A national institution experienced in knowledge management may be sought out to be used for these purposes. Lessons from the implementation of this project are crucial for enhancing the understanding of approaches to adaptation that most countries will have to build upon in the future. This project provides an opportunity to pilot and operationalise interventions that increase understanding of climate change and improve adaptive capacity to climate change. A comprehensive learning component is important so that other countries can learn from the experiences of each other, as well as for disseminating lessons nationally. Linkages will be made to UNDP-GEF’s global Adaptation Learning Mechanism (ALM) as well as other regional learning networks and platforms to ensure that lessons from this project will reach a broader audience including other international agencies, donors and the Secretariat of the Global Environment (GEFSEC) who are likely to be engaged in similar initiatives in other countries. The achievement under Outcomes 1, 2 and 3 will contribute towards lessons on improving resilience to climate change, including variability. These lessons will form a crucial input to inform Vietnam’s plans and strategies to adapt to climate change. GEF, through the SCCF, will play a pivotal role in enhancing local knowledge and capacities, which will in turn enable Vietnam to scale up and replicate these interventions. Outputs and indicative activities for Outcome 4 are listed below. Output 4.1 Project lessons classified and evaluated; Indicative Activities captured, 4.1.1 Develop project database to record all project findings and lessons and to maintain a full record of all data generated under the project; 4.1.2 Prepare optimal communication material (e.g. fact sheets, newsletters, reports, brochures, DVD, etc) and distribute across Vietnam. This may include a film of components 2 and 3 for optimal visible impact. 4.2 Adaptation knowledge and 4.2.1 Establish agreement with a national knowledge experiences from the project management institution documented and disseminated within 4.2.2 Share information with similar projects in other Vietnam, in the Asian region and countries; beyond. 4.2.3 Share lessons learnt with UNDP’s Adaptive Note: this contributes to NTP activity Learning Mechanism (ALM) and other relevant 12. regional, sub-regional and national knowledge Page 34 management platforms. Project Management Costs are $17,360,000, of which Cofinancing is $17,080,000 and SCCF/GEF contribution is $280,000. Of the SCCF contribution, $256,000 are managed by UNDP and $24,000 are managed by ADB. Overall, including management costs, the total project cost is $148,565,000. SCCF contribution is $3,400,000, with $1,400,000 managed by UNDP, and $2,000,000 managed by ADB. Co-financing contribution is $145,165,000. 2.5. Key Indicators, Risks and Assumptions See the logical framework analysis in Part 3 for details of the smart indicators, the baseline values, the targets for the end-of project, and the sources of indicator data. The logical framework analysis in Part 3 also provides an explanatory note on the choice of each indicator, and an explanation of the suitability of each indicator. Outcome 1 is Climate Change Adaptation integrated into policy, strategy and planning that relate to rural infrastructure – specifically agriculture, rural water and rural roads. The indicators to track the achievement of this outcome include: 1) Technical Guidance Paper. By the end of the project, there should be evidence that the Technical Guidance Paper prepared under this project and circulated by MARD is being used in at least two provinces. 2) Consideration of climate change in next revision of Transport standards Whenever MOT next revises Standards (this could be after project completion), the target is that the findings of this project are taken into consideration and are influential. Outcome 2 is Enhanced capacity to adapt/climate-proof rural infrastructure investments and provincial/local area planning. The indicators to track the achievement of this outcome include: 1) Capacity development indicator (see Part 3 below and Annex 9). The current value and the target for the end of the project will be determined during project inception. 2) Evidence that major planning decisions are being modified due to vulnerability maps (in Son La and Bac Kan target provinces). The end of project target for the number of decisions to be modified will be determined during project inception. Outcome 3 is Effective climate-resilience measures mainstreamed into rural infrastructure programs . The indicators to track the achievement of this outcome include: 1) The approaches developed will be used by MARD rural infrastructure investments as standard practice by end of the project. 2) Deterioration rates of rural infrastructure attributable to the impacts of climate change of the demonstration sites are lower than the control sites by the end of the project Outcome 4 is Lessons learnt and best practices from Outcomes 1, 2 and 3 are disseminated to stakeholders and development partners (UNDP managed). The indicators to track the achievement of this outcome include: Page 35 1) The Number of articles from the project activities that appear on external websites. The end of project target is 4/year. 2) The Number of contributions the project makes to the UNDP’s Adaptive Learning Mechanism (ALM) and/or other suitable international networks and platforms. The end of project target is 3/year. Objective is to increase the resilience and reduce vulnerability of local, critical economic infrastructure in the northern mountains areas of Vietnam to the adverse impacts of climate change and to create a policy framework conducive to promoting resilient northern mountains zone development. The to track the achievement of this outcome include : 1) Provinces in the Northern mountain areas of Vietnam are replicating the process to prepare vulnerability maps. The end of project target is for at least seven northern mountainous provinces to have prepared such maps. 2) Evidence that public funds are being invested in adapting rural infrastructure to climate change. The end of project target is that for at least 5 rural infrastructure projects at least 5% of the investment will cover the costs of adaptation. See Risk Log in Annex 1 for major risks, likely impacts and probability, and counter measures. 2.6. Cost-effectiveness ADB and UNDP have developed a substantial package of investment projects and technical assistance grants that are relevant to the proposed project, and so the GEF/SCCF grant will be part of a integrated package of coherent climate change relevant policy development, infrastructure development, and capacity building. These activities include: the SRIDP project, and the three UNDP Capacity development projects listed earlier. At a general level, the project’s cost-effectiveness is assured through its association with the large SRIDP programme and with other grant projects financed by UNDP. In addition, the SCCF funds are to be managed in a coherent manner with the large SRIDP investment programme, through this SCCF should yield influence and impacts well beyond its scale. Through this partnership, SCCF will be able to work with agencies and projects having a major impact on rural development and infrastructure, and so SCCF can in-turn have large impact for its investment. At the level of the activities, all the activities and measures implemented through this project were identified through an analytical process. This process of analytical activity identification will continue through project implementation. Multi-criteria analysis was used to prioritize the list of activities according to the potential to yield positive effects on climate change, and accounting for economic development, social capital and environmental needs. Cost effectiveness was an underlying criteria. The actions proposed are not only the most urgent and most pressing; they are also judged to be cost effective. The selection of target province, local partners and demonstration sites was based on an analysis of potential costs and benefits, in order to optimize cost-effectiveness. Each province was considered in terms of its representativeness, its willingness to be participate, its appropriateness as a demonstration province, and the availability of baseline capacity. Likewise, sub-projects were assessed using similar criteria. These factors increase the impact and so the cost-effectiveness of the project. At the micro-level, careful attention to partnerships and activity design will mean that each activity/input is managed in the most effective manner. This, assisted by monitoring by UNDP and ADB, will ensure the optimal costeffective use of SCCF funds. Page 36 2.7. Sustainability The concept of sustainability in climate change adaptation projects is different than in other types of GEF and ADB or UNDP funded projects. The reason for this is that adaptation projects seek to raise adaptive capacity to long-term climate change. Raised adaptive capacity implies, fundamentally, sustainability. That is, the project’s very raison d’être is building sustainability and this is central to its strategy and approach. In addition, the project has the following elements to increase sustainability: Ecological Sustainability The only potential ecological impacts are through Component 3 and the demonstration sub-projects. Core work under these sub-projects is financed by the ADB loan. As such, these projects are subject to ADB applicable environmental safeguards and environmental assessments, and environmental resources will be protected9. Institutional Sustainability This is important at both local and national levels. At all levels, the project works with existing institutions which have already the needed mandates. The project helps those institutions to implement their existing work programmes. The project is not aiming to develop new institutions, or to radically alter existing work programmes. As such it is properly anchored. The project also has a significant capacity development component, which will strengthen the capacity of organisations and individuals, leaving them better placed after the project completion to undertake their mandated tasks. Financial/Economic Sustainability This is a particular challenge. Although many adaptation measures may be low cost or no-cost, many others may be medium to high cost. Moreover, many rural infrastructure measures require ongoing maintenance, which can only be achieved if there is sufficient local organizational capacity and commitment. The project takes many steps to achieve financial and economic sustainability. First, the measures to be demonstrated are to be achieved at costs which are largely affordable in Vietnam. The aim is to find affordable solutions, and then to demonstrate effectively that the costs of adaptation are outweighed by the benefits. Another step taken by the project is to work closely with government agencies and international financial partners who have the financial means to finance follow-on activities. In addition to ADB, the World Bank, JICA, and potentially the Korean and French governments are likely to finance large scale programmes to improve and rehabilitate rural infrastructure. Partnerships will be pursued with each of these agencies, creating additional potential entry points to sustainable funding. The ‘demonstration’ aspect of the project has implications for sustainability. In part, the project aims to demonstrate innovation, and to capture lessons learnt. Both of these are processes which require 9 Initial environmental examinations have already been undertaken and are available for review. Page 37 financing. Once something has been ‘demonstrated’, it does not require demonstrating again, so the costs associated with demonstration can be one-off (and do not need to be recovered). Exit Strategy By project completion, individual and institutional capacity should have been built, information will be improved and more readily available, and practical knowledge on how to adapt more widely available. Much of this will be institutionalized by national Guidance Paper and the Manual. These factors will leave Vietnamese stakeholders well placed to continue adapting rural infrastructure to climate change. However, additional finance will remain a challenge. To a major extent, the international community is committed to financing the additional costs of climate change, and this project will enable Vietnam to access such international funding. 2.8. Replicability Climate change adaptation is at initial stages of development in Vietnam and elsewhere – this is perhaps the first project in this sector in the northern mountains to attempt adaptation measures. This project can therefore identify new and innovative procedures and mechanisms for adaptation to climate change in rural mountainous areas. These mechanisms may be of interest to other countries facing similar challenges. Accordingly, this project is explicitly designed to facilitate the replication of successes and lessons learnt. The strategy for this replication is two-fold: First, the project will demonstrate adaptation in a range of situations. This will lead to the generation of a sizeable body of lessons and experience. Outcomes 1 and 2 will learn from the demonstration and institutionalize lesson-learning through policy and capacity development; Under Outcome 4, the project will actively and strategically disseminate the lessons learnt. This is the entire focus of Outcome 4. Replication is envisaged to cover all fifteen Northern Provinces, as well as stakeholders in other countries. A range of inputs and activities will be organised under Outcome 4 to actively ensure this replication. The project will make use of the GEF ALM to ensure that the lessons learnt from the project contribute to, and benefit from, experience in adapting to climate change across the whole of the GEF portfolio. The project also includes some institutional measures to assist replication inside Vietnam. This includes the preparation of the Guidance Paper and the Manual which will be used to replicate good practices. Finally, the project is embedded into the agencies (Vietnamese, provincial and international) responsible for large-scale infrastructure projects - by working with and influencing these agencies, the project should create an entry point for adaptation into large-scale rural infrastructure development and rehabilitation projects. The first step to achieving this should be through the SRIDP programme. 2.9 Stakeholder Involvement Plan The stakeholder involvement plan is presented in Annex 8. It provides information on the main agencies/stakeholder groups involved in the project, their related responsibilities, and their likely role in the project. Page 38 3. PROJECT RESULTS FRAMEWORK This project will contribute to achieving the following Country Programme Outcome as defined in CPAP or CPD: (2) Viet Nam has adequate capacity to effectively reduce risks of, and respond to, climate-related disasters, particularly among the most vulnerable groups. Country Programme Outcome Indicators: 2.2 Training facilities/mechanism on disaster management capacity in place/training offered to targeted local authorities Primary applicable Key Environment and Sustainable Development Key Result Area (same as that on the cover page, circle one): Promote climate change adaptation Applicable SOF (e..g GEF) Strategic Objective and Program: Special Climate Change Fund Applicable SOF (e.g. GEF) Expected Outcomes: Strengthened institutional capacity to implement adaptation measures; Adaptation practices developed and implemented to respond to climate change-induced stresses linked to development sectors (taken from GEF/R.5/12/Rev.2 (Draft, August 25, 2009) Applicable SOF (e.g .GEF) Outcome Indicators: Not defined by the GEF/SCCF Project Objective11 – To increase the resilience and reduce vulnerability of local, critical economic infrastructure in the northern mountains areas of Vietnam to the adverse impacts of climate change and to create a policy framework conducive to promoting resilient northern mountains zone development. Indicator Baseline Targets (See notes below for explanation of each indicator and its suitability) Start of Project End of Project Provinces in the Northern mountain areas of Vietnam are replicating the process to prepare vulnerability maps. n/a – at project outset there is no process to replicate Detailed vulnerability maps covering at least two northern mountainous provinces, with evidence that these have been presented and disseminated to at least 50% of Northern Mountain Provinces. Evidence that public funds are being invested in adapting rural infrastructure to climate change. 0 funds invested Technical Guidance Paper Project records Risks and Assumptions10 Provinces in Northern Vietnam are replicating the process to prepare vulnerability maps. Evidence that funds are being invested in adapting rural infrastructure to climate change. Provincial records On 5 rural infrastructure projects, over and above the SIDRP pilot demonstration, at least 5% additional finance is invested in adaptation. (equivalent to output in ATLAS) Outcome 112 Climate Change Adaptation integrated into rural infrastructure (i.e. transport, irrigation, construction and water supply) strategies, policies, plans and Source of verification n/a – there is no guidance paper at project outset Evidence that the Technical Guidance Paper prepared under project and circulated by MARD is being used in at least two provinces MARD’s records Technical Guidance Paper Whenever MOT next revises Standards (could be after project completion), the 10 See Risk Log in Annex 1 Objective (Atlas output) monitored quarterly ERBM and annually in APR/PIR 12 All outcomes monitored annually in the APR/PIR. It is highly recommended not to have more than 4 outcomes. 11 UNDP Environmental Finance Services Page 25 regulations. (equivalent to activity in ATLAS) Outcome 2 Enhanced capacity to adapt/climateproof rural infrastructure investments and provincial/local area planning. (equivalent to activity in ATLAS) Outcome 3 Effective climate-resilience measures mainstreamed into rural infrastructure programs. (equivalent to activity in ATLAS) Consideration of climate change in next revision of Transport standards Capacity development indicator (See Annex 9 of UNDP Project Document). Evidence of major planning decisions being modified due to vulnerability maps (in 2 target provinces). The approaches developed—including promising modifications, alternatives, and lessons learned—will be utilized by MARD rural infrastructure investments as standard practice in 100% of new ADB-financed projects by month 36. findings of this project are taken into consideration and influential. MOT records Consideration of climate change in next revision of Transport standards To be determined To be determined at the project outset Capacity development scorecard with 6-10 questions will be sent 15 DARDs each year. Capacity development indicator (See Annex 9 of UNDP Project Document). 0 decisions are modified ‘X’ decisions modified. (to be determined) Provincial record/interviews. MARD has mainstreamed low cost climate measures for cross drainage structures by the use of drifts but not other measures. 1. Documentation identifying low cost climate proofing suitable for rural infrastructure in northern Viet Nam completed Project records. n/a – there has not been a revision of transport standards There are no demonstrations of appropriate climate resilience techniques for rural infrastructure. 2. Demonstrations are successfully completed on four SRIDP subprojects by month 24. Project records. 3. Training carried out for 60 (≥40% female) DARD staff from the 15 project provinces by month 34. Evidence of major planning decisions being modified due to vulnerability maps (in 2 target provinces). Measures to increase the resilience of rural infrastructure to climate change, with a focus on erosion control and slope stability demonstrated. Demonstrations to control erosion and to stabilize embankments/slopes predominantly using bio-engineering under the TA are successful. Demonstrations are convincing. 4. Recommendations completed and issued to the relevant institutions by month 34 5. Assessments for strengthening the climate resilience of the communities near the four subproject areas completed by month 30 Outcome 4 Lessons learnt and best practices from Outcomes 1, 2 and 3 are disseminated to stakeholders and development partners. (equivalent to activity in ATLAS) Number of articles from project activities appearing on external websites. 0 articles issued by the project before it commences Number of contributions to UNDP’s Adaptive Learning Mechanism (ALM) or other comparable platforms. 0 contributions. 4/year by the end of the project 3/year by the end of the project Web-sites ALM records Number of articles from project activities appearing on external websites. Number of contributions to UNDP’s Adaptive Learning Mechanism (ALM). Indicator explanatory notes: The following table explains how the indicators are SMART. Page 40 Indicator Overall Objective Indicators Explanation Provinces in the Northern mountain areas of Vietnam are replicating the process to prepare vulnerability maps. Overall, if the provinces in the Northern mountain areas, under their own initiative and with their own funds, are replicating the main processes introduced by this SCCF project, that can be considered an indicator that the project has been successful. To achieve this, the project must be well adapted, technical sound, and well anchored. Evidence that public funds are being invested in adapting rural infrastructure to climate change. If, after the project, there is evidence that provincial governments are agreeing to increase the costs of infrastructure projects in order to finance adaptive measures to climate change, that indicates that the project has been successful at each level. Outcome 1 Indicators Technical Guidance Paper If the Technical Guidance Paper prepared under project is (i) officially circulated by MARD to all provinces; and (ii) being used in several provinces; then clearly the Paper is useful and pertinent and having an impact. Consideration of climate change in next revision of Transport standards If the project outputs are of use to, and are used by, MOT, during its next revision of standards, that indicates the project has been technically sound, and that it has been truly anchored in governmental processes. Outcome 2 Indicators Capacity development indicator. Outcome 2 is a capacity development outcome. This indicator, based on UNDP’s global capacity development indicator, has been adapted to the subject matter and provincial context. The indicator is measured using a simple scorecard – see Annex 9 of UNDP Project document. Evidence of major planning decisions being modified due to vulnerability maps (in 2 target provinces). If the two provinces are modifying planning decisions due to project’s capacity development work, that strongly indicates that the provinces have the information, understanding and processes to assess climate change and adapt to climate change. Outcome 3 Indicators The approaches developed—including promising modifications, alternatives, and lessons learned—will be utilized by MARD rural infrastructure investments as standard practice in 100% of new ADB-financed projects by month 36 of the project. The purpose of the demonstrations is to provide sound empirical evidence of the technical and cost effectiveness of the measures so that they are directly mainstreamed into MARD’s rural infrastructure investment program Deterioration rates of rural infrastructure attributable to the impacts of climate change of the demonstration sites are lower than the control sites by the end of the project Outcome 4 Indicators By comparing the performance of SIDRP pilot demonstration sites for adaptation with those that have been constructed using pre-existing (standard) government of Vietnam norms and standards, it will be possible to determine the impact of the adaptation interventions. Page 41 Number of articles from project activities appearing on external websites. If the project findings are collected and disseminated, through websites, by agencies that are external to the project, that means the project findings are good, and it means the project has a good enough outreach to communicate through external agencies. For example, project articles may appear on the MARD website, or on the website of the National Irrigation Agency. Number of contributions to UNDP’s Adaptive Learning Mechanism (ALM). This indicates that the international community is aware of and interested in the lessons and best practices from this project; in turn this suggest that the lessons are being collected and disseminated effectively. Page 42 4. TOTAL BUDGET AND WORKPLAN Project ID(s): Award ID: 00060373 Award Title: Climate Resilient Infrastructure Planning in Northern Mountainous Provinces of Vietnam Vietnam 00075992 Business Unit: VNM10 Project Title: Climate Resilient Infrastructure Planning in Northern Mountainous Provinces of Vietnam Vietnam PIMS no. 3741 Implementing Partner (Executing Agency) Ministry of Agriculture and Rural Development For further details on the following, see associated excel sheet. GEF Outcome/ Atlas Activity Outcome 1 –. Responsible Party Source of Funds ERP/ ATLAS MARD 71300 71650 MARD Budget Description Local Consultants Local Travel Amount Year 1 (USD) Amount Year 2 (USD) 32,882 32,882 6,409 Amount Year 3 (USD) Amount Year 4 (USD) TOTAL See Budget Note (a) 32,882 32,882 131,528 (b) 6,409 6,409 6,409 25,636 (c ) MARD MARD MARD SCCF 62180 71200 Int. Consultants 37,150 37,150 37,150 37,150 148,600 (d) 71600 Inter. Travel 5,538 5,538 5,538 5,538 22,152 (e) 72100 Contract. Servs 15,807 15,807 15,807 15,807 63,228 (f) 74500 Miscellaneous 1,839 1,839 1,839 1,839 7,356 (h) 99,625 99,625 99,625 99,625 398,500 MARD Sub Total Outcome 1 Page 43 GEF Outcome/ Atlas Activity Outcome 2 – Responsible Party MARD Source of Funds ERP/ ATLAS MARD Budget Description 71300 Local Consultants 71650 Local Travel Amount Year 1 (USD) Amount Year 2 (USD) Amount Year 3 (USD) 38,507 38,507 10,659 10,659 10,659 Amount Year 4 (USD) 38,507 38,507 TOTAL Budget Note 154,028 (i) 10,659 42,636 (j) MARD 71200 Int. Consultants 23,525 23,525 23,525 23,525 94,100 (k) 71600 Inter. Travel 4,288 4,288 4,288 4,288 17,152 (l) 72100 Contract. Servs 69,432 69,432 69,432 69,432 277,728 (m) 74500 Miscellaneous 2,714 2,714 2,714 2,714 10,856 (o) 149,125 149,125 149,125 149,125 596,500 MARD MARD SCCF 62180 MARD Sub Total Outcome 2 GEF Outcome/ Atlas Activity Responsible Party Source of Funds ERP/ ATLAS Budget Description Outcome 3 – GEF Outcome/ Atlas Activity TOTAL Amount Year 1 (USD) Amount Year 2 (USD) Amount Year 3 (USD) Amount Year 4 (USD) ADB Responsible Responsible Party Source of Funds ERP/ ATLAS Budget Description Amount Year 1 (USD) Amount Year 2 (USD) Amount Year 3 (USD) Amount Year 4 (USD) TOTAL Page 44 See Budget Note Outcome 4 – MARD MARD 71300 Local Consultants 71650 Local Travel 4,561 4,561 4,561 4,561 18,244 2,082 2,082 2,082 2,082 8,328 6,750 6,750 6,750 6,750 2000 2000 2000 (p) (q) (r) MARD 71200 Int. Consultants 71600 Inter. Travel 27,000 (s) MARD MARD SCCF 62180 2000 8,000 (t) 72100 16,875 Contract. Servs 16,875 16,875 16,875 67,536 (v) MARD 74500 37,250 Sub Total Outcome 4 GEF Outcome/ Atlas Activity Outcome 5 Project Management Unit–. Responsible Party Source of Funds ERP/ ATLAS 4,973 Miscellaneous Budget Description 4,973 37,250 Amount Year 1 (USD) 4,973 4,973 37,250 37,250 Amount Year 2 (USD) Amount Year 3 (USD) Amount Year 4 (USD) 19,892 149,000 TOTAL Budget Note MARD MARD 71300 Local Consultants 71650 Local Travel 30,500 30,500 30,500 30,500 122,060 (w) 2,500 2,500 2,500 2,500 10,000 (x) MARD MARD SCCF 62180 71200 Int. Consultants - - - - 71600 Inter. Travel - - - (y) MARD 72100 Contract. Servs 18,750 18,750 18,750 18,750 75,000 72500 Office Supplies 5,000 5,000 5,000 5,000 20,000 MARD Page 45 (z) MARD 72200 EquipmT/Furniture 20,000 5,000 - - 25,000 (aa) 74500 Miscellaneous 1,000 1,000 1,000 1,000 4,000 (ab) Sub Total Outcome 5 77,750 62,750 57,750 57,750 256,000 Total 363,750 348,750 343,750 343,750 1,400,000 MARD Summary of Funds: 13 Amount Year 1 Amount Year 2 Amount Year 3 Amount Year 4 Amount Year 5 Amount Year 6 Total Total SCCF $363,750 $348,750 $343,750 $343,750 0 0 $1,400,000 GEF/SCCF/ADB 500,000 1,000,000 500,000 0 0 0 $2,000,000 Government 1,000,000 8,000,000 8,000,000 8,000,000 3,000,000 2,000,000 $30,000,000 ADB 5,000,000 30,000,000 35,000,000 30,000,000 5,000,000 3,000,000 $108,000,000 Government in-kind 13 100,000 100,000 100,000 100,000 0 0 $400,000 UNDP parallel. 3,000,000 3,000,000 765,000 0 0 0 $6,765,000 GRAND TOTAL $9,963,750 $42,448,750 $44,708,750 $38,443,750 8,000,000 5,000,000 $148,565,000 Summary table should include all financing of all kinds: GEF financing, cofinancing, cash, in-kind, etc... Page 46 Budget Note (a) (b) (c) (d) (e) (f) (h) (i) (j) Description of Cost item Unless otherwise stated, following budgeting applies: National Expert, $2500/month; International Expert, $12,000/month; International Travel, $2500/person; National per diem, $35/day, Workshop, $50/participant/day. Output 1.1, 4 x 2 months of national expert on rural infrastructure policies in four sub-sectors (roads, irrigation, water supply, embankments) ($20,400). Output 1.2, 4 x 2 months of national expert on socio-economic planning in four sub-sectors ($20,400). Output 1.3, 4 x 4 months of national expert to prepare the Technical papers and manual with a focus on in four sub-sectors ($42,000). Output 1.4, 4 x 3 months of national expert to assess standards/codes across the four sub-sectors ($30,600). The full-time National Technical Advisor, budgeted at $1250/month, will also devote approximately 40% of his time to Outcome 1 (approximately $20,000). Output 1.3, the four national experts will have to travel significantly, staying approximately 50 nights each in the provinces ($7,028). The full-time National Technical Advisor, through the life of the project, will have to travel significantly to the 15 provinces. This position involves ongoing and regular and thorough consultation and participation with provinces and sub-project staff. For this Outcome, it is estimated s/he will spend up to 60 days/year in the provinces (approximately $8,800). Associated costs of vehicle hire and fuel for outcome 1 are $9,808. Output 1.1, 1.25 month of international expert to support national experts ($16,500). Output 1.2, 1.25 month of international expert to support national experts ($16,500). Output 1.3, 5 month of international experts (4 different experts) to support national experts in preparing the Technical papers and manual focusing in four sub-sectors ($64,500). Output 1.4, 4 x 0.75 months of international experts (4 different experts, the same ones as for Output 3) to support national experts ($38,700). Over the four years of the project, the part time Senior Technical advisor will devote up to 1 month of his time to Outcome 1 (approximately $12,000). 6 international flights for international experts ($15,000). Plus $7100 towards travel costs of Senior Technical Advisor’s travel. Output 1.1: 1 national workshop with 20 participants ($2000) Output 1.2: 2 national workshops with 20 participants ($4000) Output 1.3: 4 national workshops with 20 participants ($9000) Output 1.4: 4 national workshops with 20 participants ($9000) Approximately $39,000 contribution for provincial management fee that covers all Outputs. Provincial planning workshops related to Outcome 1 ($7,355) Output 2.2, 2 x 3 months of national experts to develop and implement awareness raising programme ($15,600). Output 2.4, 22 months of national experts to support process to develop material for and advise on adapting long term development plans. Mostly for two provinces, but some activities for all 15 provinces ($57,000). Output 2.5, 8 x 3 months to develop and support training courses ($61,800). The full-time National Technical Advisor, budgeted at $1250/month, will also devote approximately 40% of his time to Outcome 2 (approximately $20,000). Under Outputs 2.2, 2.4 and 2.5, the national experts will have to travel significantly across the 15 provinces to collect data, consult, run training, etc. A total of 685 nights is estimated (ie approximately 50% of the time is travelling) ($24,000). The full-time National Technical Advisor, through the life of the project, will have to travel significantly to the 15 provinces. This position involves ongoing and regular and thorough consultation and participation with provinces and sub-project staff. For this Outcome, it is estimated s/he will spend up to (k) (l) (m) (o) (p) (q) (r) (s) (t) (v) (w) (x) (y) (z) (aa) (ab) 60 days/year in the provinces (approximately $8,800). Associated costs of vehicle hire and fuel for outcome 2 are $9,808. Output 2.1, 1.25 months of international expert to prepare and supervise the contractors ($16,500). Output 2.3 and 2.4, three international experts for 1.25 months each to help develop provincial strategies ($48,000). Output 2.5, 0.75 months of international expert to support training needs assessment ($10,500). Over the four years of the project, the part time Senior Technical advisor will devote 1.5 months of his time to Outcome 2 (approximately $20,000). 4 international flights for international experts ($10,000) Plus $7100 towards travel costs of Senior Technical Advisor’s travel. Output 2.1: contract to prepare coarse climate vulnerability assessment and modelling ($60,000) Output 2.2: two regional workshops with 25 participants, 2 days ($10,000) documents, posters and publications ($25,000). Output 2.3: Contract to support preparation of vulnerability maps and provincial strategies ($100,000). Output 2.4: 3 local planning workshops ($,4000) Output 2.5: contract to run technical training courses ($39,500). Approximately $39,000 contribution for provincial management fee that covers all Outcomes. Support material for training and workshops ($3,500) Provincial planning workshops related to Outcome 2 ($7,355) Output 4.1: 3 months of national expert to develop and establish database ($7,500). The full-time National Technical Advisor, budgeted at $1250/month, will also devote approximately 20% of his time to Outcome 4 ($10,745) The full-time National Technical Advisor, through the life of the project, will have to travel significantly to the 15 provinces. This position involves ongoing and regular and thorough consultation and participation with provinces and sub-project staff. For this Outcome, it is estimated s/he will spend up to 30 days/year in the provinces ($3,947). Associated costs of vehicle hire and fuel for outcome 1 are $4,380. Over the four years of the project, the part time Senior Technical advisor will devote 2.25 months of his time to Outcome 4 ($27,000). $8,000 towards travel costs of Senior Technical Advisor’s travel. Contracts for $50,000 for the production of documents, films, DVD etc during the project. Approximately $17,500 contribution for provincial management fee that covers all Outcomes. $16,600 to support preparation of websites, communication platforms and implementation of knowledge management strategy. Provincial planning workshops related to Outcome 4 ($3,300) 1 project coordinator, full time, four years, $74,000 1 finance and admin assistant, full time, $48,000 DSA for project coordinator, as s/he will travel extensively to the provinces. Approximately 70 nights per year ($10,000). Inception ($5,000) Mid-term evaluation ($20,000), final evaluation ($40,000) and annual audits ($10,000) This provides for additional costs of project related communications (phone, internet and fax) at $3500 per year ($14,000), as well as annual recurrent costs of stationery, computing and printing supplies and photocopying ($6000). The government will provide office space and dedicated counterpart staff. The project will provide $17,500 for office equipment (PCs, Printer, Photocopier etc) including both the CPMU and two Provincial Project Management Units in the two target provinces. This will cover the additional costs of three photocopiers ($5,000), 3 printers ($1,500), 4 desktop computers ($5,000) 2 notebooks ($4,000), 4 mobile phones ($2,000), as well as a further $7,500 for initial upgrade of the office space itself. The cost for operation, maintenance and insurance of project equipments will be covered by government budget. This includes $4000 for inception workshop. If the project request for UNDP procuring and providing administrative services, UNDP will request for Implementation Support Service (ISS) charges. 5. MANAGEMENT ARRANGEMENTS The Executing Agency (EA) for the proposed GEF/SCCF project will be MARD. The management structure for the proposed GEF/SCCF project is shown in an organization chart in Annex 11. SCCF funds are to be implemented through two modalities: Outcomes 1, 2, 4 and Project Management are under the oversight of UNDP; Outcome 3 is under the oversight of ADB. All Outcomes are coordinated and executed by MARD through a single coordination mechanism (see below). Hence, for Outcomes 1, 2 and 4, the funds flow from SCCF through UNDP to CPMU (see below) to project activities, under UNDP National Implementation (NIM) procedures. Outcome 3 will be implemented under a parallel Capacity Development Technical Assistance (CDTA) managed by the Asian Development Bank (ADB). The management arrangements for the GEF/SCCF project will be closely linked with those of the SRIDP Project. Under these arrangements, MARD will delegate responsibility for overall GEF/SCCF project management and coordination to its Agricultural Projects Management Board (APMB) through CPMU (see below). The Director for CPMU will function as the National Project Director (NPD) responsible for ensuring that project objectives and outcomes are achieved. The Director for CPMU will report to a GEF/SCCF Project Board (PB – see below) on progress and will be responsible for coordination the flow of results and knowledge. The APMB is to establish a Central Project Management Unit (CPMU) for SRIDP managed by a full time Project Director14. The CPMU will also implement the GEF/SCCF project at national and province levels, supported by a dedicated Sub-Project Management Unit – (see organogram in Annex 11) – led by a Project Coordinator. Province level GEF/SCCF related activities, particularly in the two target provinces, will be managed through the CPMU in collaboration with provincial Departments of Agriculture and Rural Development (DARD) as indicated in the organogram. The Project Board (PB) is the strategic decision making body of the project, meeting at least twice per year. The Project Board will be chaired by a Vice-Director of MARD and will consist of: (1) the Chair who will be the Vice-Director, (2) Representative of APMB (the Executive); (3) Representative of MARD-DOSTE; (4) Representative of Department of Planning in MARD, (5) Representative of Department for Construction Management in MARD, and (4) Representative of UNDP. An ADB representative may also attend the Project Board as an observer. The Project Board will approve/endorse Annual Workplans which are the instruments of authorization through which the project will deliver results.15 The PB will undertake project assurance reviews at designated decision points during project implementation, or as required, at the request of the Director of CPMU. Additional functions are to: (1) ensure that GEF/SCCF resources are committed exclusively to activities that relate to the achievement of approved project objective and outcomes and in line with approved annual workplans; (2) provide guidance on overall project management arrangements to ensure coherence and coordinated 14 This function is not funded by the project. Under these arrangements the Project Board will approve the Annual Workplan and budget for the UNDP supported components 1, 2 and 4 under National Implementation (NIM) arrangements. For component 3, which will be implemented through a parallel ADB TA, the Project Board will endorse the Annual Workplan and budget and will provide guidance to ensure the overall coherence and coordination between all components. 15 implementation of all components of the project; (3) arbitrate significant conflicts within the project; and (4) negotiate a solution to major problems that may arise between the project and external bodies. The CPMU will recruit a Project Coordinator and other staff paid from SCCF resources in line with UNDP NIM procedures. The GEF/SCCF Project Coordinator will be responsible for the day-to-day management, administration, coordination, and technical supervision of project implementation reporting to the CPMU Project Director. S/he will monitor work progress, and ensure timely delivery of outputs as per Annual Workplans and the Project Results Framework and within budget. The GEF/SCCF Project Coordinator will also prepare an Annual Workplan each year during the entire project for approval/endorsement by the Project Board. The work plans will include component 3 (to be financed through a separate ADB TA) to ensure that all elements are reflected into a single set of outputs and outcomes for the project. For Component 3, budget management will be administered by ADB under its standard TA procedures.16 The consultant Team Leader for Component 3 to be recruited by ADB will coordinate closely with the GEF/SCCF Project Coordinator to ensure a high quality of project planning, management and technical and financial progress monitoring and reporting. Annex 10 provides TOR for the Project Coordinator. As indicated above, CPMU will establish a Sub-Project Management Unit under the SRIDP Central Project Management Unit. GEF/SCCF Project management funds provided under UNDP National Implementation (NIM) arrangements will be used by the CPMU to hire a Project Coordinator and other support staff. These staff will ensure delivery of results as specified in the Project Results Framework and Annual Workplans. As part of the Government’s in kind contribution, APMB will provide office space for the GEF/SCCF Sub-Project Management Unit, as well as remuneration and per diem for counterpart staff. Additional GEF/SCCF Sub-Project Management Unit staff will be hired with SCCF resources to support the Project Coordinator as follows: 1 Senior Technical Adviser (part time), 1 Admin and Financial Officer (full time). The TOR for the key technical staff of the Sub-Project Management Unit are provided in Annex 10. The GEF/SCCF Sub-Project Management Unit will be further strengthened by international and national project consultants funded in two ways: for Component 3, consultants will be recruited in accordance with ADB’s Guidelines on the Use of Consultants (2007, as amended from time to time). For the other components (Components 1, 2 and 4) recruitment will follow UNDP NIM arrangements. Consultants hired for deliverables under each project component will be responsible to the CPMU Project Director through the GEF/SCCF Project Coordinator. Project Assurance: UNDP will ensure application of standard UNDP administrative and financial procedures for the use of GEF/SCCF funds relating to Components 1, 2 and 4, as well any Project Management Funds that are channeled through UNDP. ADB will ensure the appropriate use of GEF/SCCF funds for Component 3 according to the ADB-GEF financial procedures agreement17. UNDP will ensure project monitoring and evaluation according to an agreed and budgeted schedule and in line with UNDP and GEF requirements. M&E outputs (including Annual Project Implementation Reports (PIRs), Mid and Terminal Evaluations Reports) will be compiled by the GEF/SCCF Sub-Project 16 ADB will engage the consultants in accordance with its Guidelines on the Use of Consultants (2007, as amended from time to time). Equipment and materials to be financed by the TA will be procured in accordance with ADB’s Procurement Guidelines (2007, as amended from time to time). On completion of the TA project, the equipment will become the property of the government and participating local institutions and/or communities. Disbursements under the TA project will be made in accordance with ADB's Technical Assistance Disbursement Handbook (2008, as amended from time to time). 17 Financial Procedures Agreement between ADB and the International Bank for Reconstruction and Development as Trustee of the GEF Trust Fund, dated July 7, 2007. Management Unit with inputs from the ADB TA Team Leader. Submission to the GEF will be carried out by ADB as the lead GEF agency for the Project. Inception missions, mid-term and final evaluations, will be undertaken jointly between the Government, UNDP and ADB. UNDP will assist in compiling lessons learned and sharing project experiences on a national, regional and international basis. The Project Board will assess the usefulness of establishing a Technical Advisory Group on ‘Climate Science and Vulnerability Assessment’. If established, this Group will provide technical guidance and reviews specifically covering Components 2 and 3. This Group would be chaired by MARD. Its membership will be drawn from a combination of government and non government experts. The non government experts will be funded from within Components 2 and 3 of the project. Other members of the Group may be drawn from the MARD Office for Climate Change (OCCA), and the Department for Hydrometeorology and Climate Change of MONRE. Terms of Reference of the Project Board, the Project Coordinator and the key technical staff of the subproject management Unit are provided in Annex 10. ToR for the possible Technical Advisory Group are also included in Annex 10. 6. MONITORING FRAMEWORK AND EVALUATION The project will be monitored through the following monitoring and evaluation (M&E) activities. The M& E budget is provided in the table below. Project start: A Project Inception Workshop will be held within the first 2 months of project start with those with assigned roles in the project organization structure, UNDP country office and where appropriate/feasible regional technical policy and programme advisors as well as other stakeholders, and ADB officials. The Inception Workshop is crucial to building ownership for the project results and to plan the first year annual work plan. The Inception Workshop should address a number of key issues including: Assist all partners to fully understand and take ownership of the project. Detail the roles, support services and complementary responsibilities of UNDP Country Office (CO) and UNDP/GEF Regional Coordination Unit (RCU) staff vis à vis the project team, and the complementary roles of UNDP and ADB. Discuss the roles, functions, and responsibilities within the project's decision-making structures, including reporting and communication lines, and conflict resolution mechanisms. The Terms of Reference for project staff will be discussed again as needed; Based on the project results framework, finalize the first annual work plan. Review and agree on the indicators, targets and their means of verification, and recheck assumptions and risks; Provide a detailed overview of reporting, M&E requirements. The Monitoring and Evaluation work plan and budget should be agreed and scheduled; Discuss financial reporting procedures and obligations, and arrangements for annual audit; Plan and schedule Project Board meetings. Roles and responsibilities of all project organisation structures should be clarified and meetings planned. The first Project Board meeting should be held within the first 12 months following the inception workshop. An Inception Workshop report will be prepared and shared with participants to formalize various agreements and plans decided during the meeting. Quarterly: Progress made shall be monitored in the UNDP Enhanced Results Based Management Platform; Based on the initial risk analysis submitted, the risk log shall be regularly updated in ATLAS. Risks become critical when the impact and probability are high. Based on the information recorded in Atlas, a Project Progress Reports (PPR) will be generated in the Executive Snapshot. Other ATLAS logs will be used to monitor issues, lessons learned etc... The use of these functions is a key indicator in the UNDP Executive Balanced Scorecard. Annually: Annual Project Review/Project Implementation Reports (APR/PIR): This key report will be prepared to monitor progress made since project start and in particular for the previous reporting period (30 June to 1 July). The APR/PIR combines both UNDP and SOF (e.g. GEF) reporting requirements. The APR/PIR includes, but is not limited to, reporting on the following: Progress made toward project objective and project outcomes - each with indicators, baseline data and end-of-project targets (cumulative) Project outputs delivered per project outcome (annual). Lesson learned/good practice. Annual Workplan (AWP) and other expenditure reports Risk and adaptive management ATLAS Quarterly Production Reports (QPR) Portfolio level indicators (i.e. GEF focal area tracking tools) are used by most focal areas on an annual basis as well. Periodic Monitoring through site visits: UNDP CO and the UNDP RCU will conduct visits to project sites based on the agreed schedule in the project's Inception Report/Annual Work Plan to assess first hand project progress. Other members of the Project Board may also join these visits. Where possible, monitoring will be done in synergy with ADB. A Field Visit Report/BTOR will be prepared by the CO and UNDP RCU and will be circulated no less than one month after the visit to the project team and Project Board members. Mid-term of project cycle: The project will undergo an independent Mid-Term Evaluation at the mid-point of project implementation. The Mid-Term Evaluation will determine progress being made toward the achievement of outcomes and will identify course correction if needed. It will focus on the effectiveness, efficiency and timeliness of project implementation; will highlight issues requiring decisions and actions; and will present initial lessons learned about project design, implementation and management. Findings of this review will be incorporated as recommendations for enhanced implementation during the final half of the project’s term. The organization, terms of reference and timing of the mid-term evaluation will be decided after consultation between the parties to the project document. The Terms of Reference for this Mid-term evaluation will be prepared by the UNDP CO and ADB based on guidance from the Regional Coordinating Unit and UNDP-EEG. The management response and the evaluation will be uploaded to UNDP corporate systems, in particular the UNDP Evaluation Office Evaluation Resource Center (ERC). The relevant SOF (GEF) Focal Area Tracking Tools will also be completed during the mid-term evaluation cycle. End of Project: An independent Final Evaluation will take place three months prior to the final Project Board meeting and will be undertaken in accordance with UNDP and SOF (e.g. GEF) and ADB guidance. The final evaluation will focus on the delivery of the project’s results as initially planned (and as corrected after the mid-term evaluation, if any such correction took place). The final evaluation will look at impact and sustainability of results, including the contribution to capacity development and the achievement of global environmental benefits/goals. The Terms of Reference for this evaluation will be prepared by the UNDP CO and ADB based on guidance from the Regional Coordinating Unit and UNDP-EEG. The Terminal Evaluation should also provide recommendations for follow-up activities and requires a management response which should be uploaded to PIMS and to the UNDP Evaluation Office Evaluation Resource Center (ERC). The relevant SOF (e.g GEF) Focal Area Tracking Tools will also be completed during the final evaluation. During the last three months, the project team will prepare the Project Terminal Report. This comprehensive report will summarize the results achieved (objectives, outcomes, outputs), lessons learned, problems met and areas where results may not have been achieved. It will also lay out recommendations for any further steps that may need to be taken to ensure sustainability and replicability of the project’s results. Learning and knowledge sharing: Results from the project will be disseminated within and beyond the project intervention zone through existing information sharing networks and forums. The project will identify and participate, as relevant and appropriate, in scientific, policy-based and/or any other networks, which may be of benefit to project implementation though lessons learned. The project will identify, analyze, and share lessons learned that might be beneficial in the design and implementation of similar future projects. Finally, there will be a two-way flow of information between this project and other projects of a similar focus. M & E Workplan and Budget Type of M&E activity Responsible Parties Inception Report Workshop and Measurement of Means of Verification of project results. Measurement of Means of Verification for Project Progress on output and implementation ARR/PIR Project Coordinator UNDP CO, ADB Office Project Team Budget US$ Excluding project team staff time Indicative cost: 5,000 Time frame Within first two months of project start up None Start, mid and end of project (during evaluation cycle) and annually when required. Oversight by Project Coordinator Project team To be determined as part of the Annual Work Plan's preparation. Annually prior to ARR/PIR and to the definition of annual work plans Project Coordinator and team UNDP CO and None Annually Type of M&E activity Periodic reports status/ progress Mid-term Evaluation Responsible Parties Final Evaluation Project Terminal Report Audit Visits to field sites RCU ADB Office Project Coordinator and team Project Coordinator and team UNDP CO UNDP RCU and ADB office External Consultants (i.e. evaluation team) Project Coordinator and team, UNDP CO and RCU, and ADB office External Consultants (i.e. evaluation team) Project Coordinator and team UNDP and ADB local consultant UNDP CO Project Coordinator and team UNDP CO and RCU and ADB (as appropriate) Government representatives TOTAL indicative COST Excluding project team staff time and UNDP staff and travel expenses Budget US$ Excluding project team staff time Time frame None Quarterly Indicative cost: 20,000 At the mid-point of project implementation. Indicative cost : 40,000 At least three months before the end of project implementation At least three months before the end of the project 0 Yearly Indicative cost per year: 2500, total 10,000 For GEF supported projects, paid from IA fees and operational budget US$ 75,000 Yearly 7. LEGAL CONTEXT This document together with the CPAP signed by the Government and UNDP which is incorporated by reference constitute together a Project Document as referred to in the Standard Basic Assistance Agreement and all CPAP provisions apply to this document. Consistent with the Article III of the Standard Basic Assistance Agreement, the responsibility for the safety and security of the implementing partner and its personnel and property, and of UNDP’s property in the implementing partner’s custody, rests with the implementing partner. The implementing partner shall: a) put in place an appropriate security plan and maintain the security plan, taking into account the security situation in the country where the project is being carried; b) assume all risks and liabilities related to the implementing partner’s security, and the full implementation of the security plan. UNDP reserves the right to verify whether such a plan is in place, and to suggest modifications to the plan when necessary. Failure to maintain and implement an appropriate security plan as required hereunder shall be deemed a breach of this agreement. The implementing partner agrees to undertake all reasonable efforts to ensure that none of the UNDP funds received pursuant to the Project Document are used to provide support to individuals or entities associated with terrorism and that the recipients of any amounts provided by UNDP hereunder do not appear on the list maintained by the Security Council Committee established pursuant to resolution 1267 (1999). The list can be accessed via http://www.un.org/Docs/sc/committees/1267/1267ListEng.htm. This provision must be included in all sub-contracts or sub-agreements entered into under this Project Document. The UNDP Resident Representative in Vietnam is authorized to effect in writing the following types of revision to this Project Document, provided that he/she has verified the agreement thereto by the UNDP Regional Coordination Unit and is assured that the other signatories to the Project Document have no objection to the proposed changes: a) Revision of, or addition to, any of the annexes to the Project Document; b) Revisions which do not involve significant changes in the immediate objectives, outputs or activities of the project, but are caused by the rearrangement of the inputs already agreed to or by cost increases due to inflation; c) Mandatory annual revisions which re-phase the delivery of agreed project inputs or increased expert or other costs due to inflation or take into account agency expenditure flexibility; and d) Inclusion of additional annexes and attachments only as set out here in this Project Document Annex 1: Risk Analysis # Description Date Identified Type Impact & Countermeasures 18 response Probability / Mngt Owner Submitted, updated by 1 The impacts of April climate change 2010 cannot be assessed at the scale relevant to the rural infrastructure projects I- 1 P- 4 2 Costs of adapting to April climate change are 2010 prohibitive I–4 P -1 The project sets out to find cost- APMB effective measures. Considerable project efforts are devoted to this. UNDP Jan 2011 3 Inter-agency April coordination is not 2010 adequate I–3 P–3 The project is designed to rely on MARDcoordination at the provincial ICD level which is known to be possible in Vietnam, whereas national level coordination can be difficult. Strong national level coordination, whilst preferential, is not essential to project success. UNDP Jan 2011 4 Funding for April continued 2010 demonstration and monitoring does not continue after completion of the SCCF support. I–4 P–2 Funding for this purpose can be ADB and UNDP included within a proposed future Govt of ADB loan to rural infrastructure Vietnam RI sector. The project is designed to not depend on continued external funding, other than funding Jan 2011 18 The best available models are to MARD - UNDP be used. OCCA Last Update Jan 2011 Project funds are allocated to addressing this Range 1-5, where 5 is highest. Page 56 Status available for adaptation. climate change 5 Conservative views April within line agencies 2010 resist changes to design standards and manuals. I–2 P–2 Awareness raising of decision- MARDmakers should overcome this. ICD Also, the project always sets out to demonstrate the advantages and benefits of adaptation. UNDP Jan 2011 6 Demonstrations are April not successful and 2010 convincing I–3 P-1 Several demonstrations will be APMB undertaken. Each will be closely monitored. Funding is adequate. UNDP Jan 2011 Page 57 Annex 2: UNDP – ADB Implementation Cooperation Agreement The Asian Development Bank (ADB) and the United Nations Development Programme (UNDP) signed a Memorandum of Understand on Administrative Arrangements which became effective in July 2007. Section C of the MoU sets of the scope of proposed cooperation and activities which includes sharing of knowledge and evaluation results, consultations on policy and programming at regional and country levels, and co-financing arrangements for funding joint programmes. Section D of the MoU deals with exchange of information and the importance of “open, comprehensive and regular exchange of information at both institutional and country levels.” Section F of the MoU addresses consultations, providing for periodic consultations both at regional level and country level. With respect to the later the ADB Country Director and UNDP Resident Representative should consult “as required and not less than once every year.” Section H of the MoU concerns roles and responsibilities of focal points at country level including brief summary reports on the status of implementation of all ADB-UNDP cooperation within their countries, as well as annual summary assessments of the results achieved. Section K covers the Term and Review of the MoU which will be effective for five years from the date of signature, that is to say until July 2012, subject to extension by mutual agreement. Appendix B to the MoU recognises 3 different administrative arrangements for ADB-UNDP project cooperation. These include: Cooperation with ADB as an implementing partner for UNDP; where UNDP transfers funds to ADB Cooperation with Funds transferred by ADB to UNDP : where ADB transfers funds to UNDP Cooperation with Parallel Financing Arrangements. The following provides relevant clauses for Parallel Financing Arrangements which is the selected cooperation modality for the SCCF project: Promoting Climate Resilient Infrastructure in Northern Mountain Provinces of Vietnam. 26. For ADB components of a parallel financed project ADB will use standard ADB administrative arrangements for implementation of components of the project financed by ADB and implemented by ADB, unless otherwise agreed by ADB in cases where ADB and UNDP agree to harmonise certain procedures for the benefit of the developing country authorities and/or executing agencies. 27. For UNDP components of a parallel financed project UNDP will use standard UNDP administrative arrangements for implementation of components of the project financed by UNDP and implemented by UNDP, unless otherwise agreed by UNDP in cases where ADB and UNDP agree to harmonise certain procedures for the benefit of the developing country authorities and/or executing agencies. 28. Harmonisation ADB and UNDP will make best efforts on a case by case basis to harmonise their administrative arrangements for implementation of parallel financed activities. 29. Exchange of information ADB and UNDP will keep each other fully informed about progress in implementing the components for which they each provide financial support in the implementation of parallel financed activities. Annex 3: References PPG Reports Northern mountain regions – A climate change status report, Vu, Dr., and Kowal, Mark. Short report on the status of climate change in the northern mountain region. Vu, Dr., and Kowal, Mark. The planned and ongoing initiatives in climate change in Vietnam. Vu, Dr., The list of regulations and guidelines in respect of climate change. Vu, Dr., Socialist Republic of Viet Nam: Preparing the Sustainable Rural Infrastructure Development Project in the Northern Mountain Provinces (SRIDP Reports) PPTA Inception Report (July 2009) PPTA Interim Report (October 2009) PPTA Draft Final Report (March 2010) Detailed information on core projects (Project Description, Initial Environmental Examination, ) Information on potential pilot projects – diverse Memorandum of Understanding between GOV and ADB, May 2010 Climate Change Adaptation, Methodologies and Scenarios ORCHID: Piloting Climate Risk Screening in DFID Bangladesh , IDS, (2007) Climate Change Vulnerability Mapping for Southeast Asia, Arief Anshory Yusuf & Herminia Francisco (2009) Under the Weather and the Rising Tide, ADB (2009) Vietnam Baseline Situation Viet Nam Initial National Communication to UNFCCC, Government of Vietnam (2003); Viet Nam Second National Communication to UNFCCC, Government of Vietnam (2010); Updating of the Rural Transport Development Strategy In Vietnam – Final Report (December 2006), TDSI, DFID/MOT, Northern Mountains Poverty Reduction Project, Implementation Completion and Results Report, World Bank (2008) Socialist Republic Of Vietnam - Country Strategic Opportunities Programme (COSOP), IFAD (Confidential draft) (2008) Master Plan Study on Improvement of Rural Living Conditions in Northwestern Mountainous Region in Viet Nam Final Report – Summary, JICA, (September 2008) Action Plan Framework for Adaptation and Mitigation of Climate Change of the Agriculture and Rural Development Sector Period 2008-2020, MARD, Government of Vietnam (2009); National Target Program To Respond To Climate Change, MONRE, Government of Vietnam (2009); Climate Change, Sea Level Rise Scenarios for Viet Nam. MONRE, Government of Vietnam (2009) Guideline On Formulation Of Action Plans To The Ministries And Localities To Respond To Climate Change, MONRE, Government of Vietnam (2009) Related Project Documentation Capacity Building for Climate Change (CBCC), Revised Project Document, UNDP/Government of Vietnam (2009) Strengthening Sustainable Development and Climate Planning, Detailed Project Outline, UNDP/Government of Vietnam (200?) Concept Paper for Preparation of Infrastructure Inventory for Small-Scale Pro Poor Infrastructure Development Project, JICA (2009) List of Pilot Projects for SPL VI, JICA (2009) Regional Climate Adaptation Knowledge Platform for Asia - Vietnam Mission - a summary note, National Institute for Science and Technology Policy and Strategy Studies (NISTPASS), Vietnam, Regional Resource Centre Asia and Pacific, (RRCAP) UNEP, Bangkok and Stockholm Environment Institute (SEI), Bangkok (2009) Policy And Institutional Scoping Assessment for Climate Change Adaptation In Viet Nam, National Institute for Science and Technology Policy and Strategy Studies (NISTPASS), Vietnam, Regional Resource Centre Asia and Pacific, (RRCAP) UNEP, Bangkok and Stockholm Environment Institute (SEI), Bangkok (2009) Other Capacity Assessment Methodology - User’s Guide, UNDP (2000) Integrating Climate Change Risks into Resilient Island Planning in the Maldives, UNDP (2009) – Sample Project Document Kenya: Adaptation to Climate Change in Arid and semi-ARiD LandS (KACCAL) , UNDP/World Bank (2009) – Sample Project Document and CEO Endorsement Letter Piloting climate change adaptation to protect human health, WHO/UND (2009) – Sample Project Document Feasibility Study for a NationalProgramme to Manage Slope Stability, Main Report September 2008, DFID/Consultants/Government of Lao PDR (this actually gives a lot of ideas as to what our project could do) Vietnam Slope Protection Study, Final Draft 2003, WSP/DfID. Annex 4: Summary of Rapid Provincial Capacity Assessment Objective The aim was to assess capacity in one, representative, Northern Province. The purpose was to provide an understanding of capacity in order to feed into the design of the above-mentioned Project Methodology Direct interviews (6 key stakeholders), Field observations, Triangulation, Simple questionnaire, Discussion Limitations Due to time constraints, it was not possible to meet some concerned stakeholders. Multi-party interactive problem identification was not possible at this stage. Findings – Overall – Senior and mid-level government personnel have very limited knowledge of climate change; – As of yet, national information and planning documents on climate change have not been widely disseminated; – The main sources of information on climate change are TV, radio and newspapers; – There is some confusion with regards to climate change, its likely manifestation, and its likely impacts on rural development and infrastructure. Notably there is often a confusion between the environmental impact of investments and the potential impacts of climate change on investments ; – In many cases, climate change is interpreted as a component of natural disasters (flooding and landslides); – The long term nature of climate change makes it difficult for system/individuals to respond. I.e. individuals have no incentive to plan for potential impacts 10, 20 years into the future. Likewise, procedures and guidelines do not allow the use of scenarios for planning/decisionmaking; – There is no local specific information available on climate change. The manifestations of climate change at the project or catchment level are not known - i.e. localized scenarios do not exist. This means that even those tasked/willing to address climate change can only do limited things; – The efficiency and reliability of information exchange on climate change within and across departments is limited; – At this stage, it is too early to determine the details of in-depth training needs. Overall, the above represent barriers to mainstreaming climate change into rural infrastructure in northern Vietnam. Findings – by agency DARD/PPMU DONRE DPI HMC19 DOT District20 61 -21 - 49 214 - 52 - - 34 33 - Stakeholder role in CC/RI22 See Decision 22/2008. Supervision of contractors. Standing office for National Target Programme (NTP) (PPC Decision of 12/ 2009). Review all investment proposals and EIAs. See related Son provincial decision. La Provide data (on hydrology, meteorology, environment) for infrastructure design. Road repairs. Local priority setting Observation. Anticipated CC impacts Many: cold, drought, flood, hail, flash floods, animal death, landslides – can affect transport routes, water infrastructure and hydro-power. Erosion, sea level rise, salinisation, dyke loss. Flooding and landslides to affect all infrastructure. Many: heavy rain, floods, landslides, damaged roads and hot weather damage. Increased natural disasters – floods, rain, landslides. Floods/landslides. Has stakeholder appointed a CC focal point? Sub-dept. for water resources are responsible, along with disaster management. DARD is standing office for committee on flood control and research and rescue. Sub-department for mineral and water resources. None appointed. No – but certain units have related activities, e.g. Unit of Road Structure Management has responsibility to overcome rain and weather related damage. None appointed. None appointed. Has stakeholder prepared CC plan or undertaken No plan – only a provincial plan for flood protection. Agricultural calendar plans There is draft Provincial plan to implement NTP has been prepared – very early draft. Implementing Agenda 21 at provincial level. DST did risk map No plan. Small activities, e.g. annual review of activities determines how weather related damage Not directly. Some related activities (notably data collection). Not prepared. No of staff No Engineers 19 20 21 22 of Regional Hydro-Meteorological Centre No formal questionnaire used – based on discussion with District People Committee personnel ‘-‘ indicates no answer provided Climate change/rural infrastructure Page 63 DARD/PPMU related activities. activities? DONRE DPI (1;125,000) DOT can be addressed. HMC19 District20 Not yet. Not yet. Not yet. Not yet. Not yet. Not yet. Who else is involved in CC/RI? DOT (Transport). Consulting companies (many). Depts. of construction, ONRE, OLISA, Defence Finance, Media, Red Cross, Defence. DOC, DOT, DPI, Culture, DST, Health, DARD, Districts. All departments, especially DARD and DOT. 30 design companies involved in design/construction (10 of which are branches of national companies). DARD, DOC, DONRE, HMC. - Cannot easily separate impacts on infrastructure with other impacts, e.g. on crops, paddy, houses, etc. What are challenges in applying national policies? Difficult question. They can interpret standards, e.g. by selecting road category. Need district level plans to implement national policy and plans. Do not know how to implement national policies. Need information and guidance. No information on long term changes. Very poor province – focus is poverty alleviation. CC is very long term – how to think about it? Scenarios will not be prepared at regional/provincial level – expertise is needed at national level.. - Perceived capacity needs Proposed training for 5-7 staff from several agencies. Equipment to forecasts floods (automatic). Guidelines to implement national policies. Policy and budget support. Experts and expertise. Coordination, Information and documentation. Training. Training for all levels. Different survey methods. Determine how best to use ranges within standards – to determine slope next to road, and drain size. Awareness raising. Improved stations. More stations. Improved forecasting techniques. - Other Did not know about CC NTP, nor about MARD Action Plan for CC. Training CC on Provincial 5 year SEDP to be approved by PPC by June Major schemes to construct large numbers of reservoirs in Son La are underway. Water Page 64 DARD/PPMU DONRE DPI this year. HMC19 DOT flow and availability will be critical to their economic success. Page 65 District20 Annex 5: Relevant Internationally Supported Initiatives The list was prepared based on a review of the Vietnam Climate Change Activities Matrix for Viet Nam, which was prepared by the World Bank in collaboration with the Government of Viet Nam, and a range of donor agencies and NGOs. Further review of the list projects will be undertaken during project preparation to identify opportunities for coordination and possible linkage. Name of Project Source Funds Vietnam: Preparation of the Second National Communication of Implementing Agency Project or Study Details UNEP/GEF MONRE Climate change vulnerability mapping for southeast Asia Multi-donor EEPSEA National Target Programme on Climate Change GoV MONRE Develop an action plan framework for CC adaptation and mitigation of CC of the Agriculture and Rural Development GoV MARD To help VN fulfil its obligations and commitments by preparing the Second National Communication (SNC) based on the principles set at the Eighth Conference of the Parties to UNFCCC in 2002. Report by Yusuf and Fransisco (January 2009). At a broad regional scale, looks at expected impacts, vulnerability, and adaptive capacity to map out vulnerability to climate change. The strategic objective of the programme is evaluating the degree of impacts of CC on sectors and locals in each period and developing practically action plan to respond effectively to CC both in short and long terms to ensure the country's sustainable development. Objective: To develop an action plan to enhance capability of mitigation and adaptation to climate change (CC) to minimize its adverse impacts and ensure sustainable development of the agriculture and rural development sector in the context of climate change and under the umbrella of the NTP. Funds allocated Location $405,000 $143,878,788 Page 66 Nationwide Start End 2006 2009 2008 2009 2009 2015 2008 ongoing Name of Project Source Funds Economics of Adaptation to Climate Change (EACC) Agriculture and Water sector study in Vietnam Multi-donor Build flashflood zoning maps Impact of Climate Change on water resources and adaptation measures of Denmark/ODA Implementing Agency Project or Study Details WB Under Economic impacts, see the general entry on the EACC. This sector study, under implementation in July 2009, focuses on the economic impacts of CC on a small number of critically important crops. Being carried out jointly with a number of Vietnamese institutions. Project coordinator David Corderi. In mountainous provinces of Vietnam. MONREIMHEN MONREIMHEN Water Sector Review Multi-donor ADB Developing integrated catchment management strategies for sustainable water use in response to climate change Australia/AusAID Universities Funds allocated $200,000 $1,125,000 Impacts of climate change on water resources and suggested mitigation measures. $800,000 Co-financing from Netherlands, Australia and Denmark. The long term goal of the Water Sector Review is to help the Government and its development partners to adopt better management approaches based on integrated water resources management (IWRM) principles, in line with the objectives of the National Water Resources Strategy (NWRS). Better water sector management will lead to enhanced contributions of the sector to poverty reduction and sustainable national development. Implemented by Monash University, VNU, and MONRE. The project will build multi-disciplinary capacity in integrated catchment management and develop cost-effective adaptation strategies. Location Start End National 2009 2009 Nationwide 2006 2008 2007 2009 2007 $160,000 Page 67 2009 2010 Name of Project Source Funds Scoping research on Climate change and the Poor in Vietnam of Implementing Agency Project or Study Details Funds allocated UK/DFID UNDP Technical study of the linkage between climate change and poverty. With MONRE. $150,000 Natural Disaster Risk Management Project (NDRMP) (P073361) WB MARD $86,000,000 Flash-flood control and adaptation to climate change Finland/ODA CSDM Disaster Risk Management portfolio: UNDP MARD Climate Change Scenarios for Vietnam GoV MONREIMHEN The overriding goal of the Program is to reduce human, economic and financial losses from natural disasters and ensure rapid post-disaster recovery of poor communities living in hazard-prone areas. AusAid also has a $4.5 million TA project associated with this project (2006-2010). Implementing agency is "CSDM (Centre for Sustainable Development in Mountainous Areas) + Ha Giang PC". Strengthening of Emergency response mechanisms, improving institutional setting for complex emergencies. Capacity building for senior officials and humanitarian workers and volunteers. Focus in Cao Bang, Binh Thuan, Can Tho Provinces. As part of the NTP, MONRE is developing national climate change scenarios which are scheduled to be released in April 2009. Sent to Minister for approval on 2 April 2009. $202,500 $4,000,000 Page 68 Location Hue, Tinh Start Ha End 2009 Nationwide 2006 2010 Ha Giang province 2008 2010 National 2009 2012 2008 2009 Name of Project Source Funds Strengthening national capacities to respond to climate change in Vietnam, reducing vulnerability and controlling GHG emissions of Implementing Agency Project or Study Details UNDP MONREIMHEN Implementing agencies are "MARD, MONRE". To develop frameworks, mechanisms and capacities in place to inform, guide and coordinate (i) analysis of climate change related risks and formulation of CC adaptation policy responses and investment plans; and (ii) analysis of Green House Gas emissions, and formulation of investment plans and ways to change consumer behaviour for low-carbon economic development. Focus in Can Tho, Binh Thuan and Quang Nam Provinces. Strengthening Sustainable Development and Climate Planning UNDP MPI Capacity building for staff of NRE sector Sweden/ODA SEMLA Funds allocated Location Start End $4,660,000 National 2008 2012 $3,600,000 National 2009 2012 A training module on CC aspects relevant for the staff of the NRE sector will be prepared with the support from SEMLA in cooperation with the Department of Organization and Personnel (DOP) and the International Cooperation Department (ICD) of MONRE. This training module will be sued in training of staff at the central and local levels Page 69 Name of Project Source Funds Enhancement of Vulnerability and Capacity assessment in Vietnam of Implementing Agency Project or Study Details Europe/ODA VNRC Climate change adaptation survey Ford Foundation East West Sector Budget Support to NTP: Adaptation Component Denmark/ODA MONRE The project funded by the EC aims to strengthen vulnerability and capacity assessment (taking consideration of climate change) capacity of VNRC disaster preparedness facilitators. 331,000 Euros "through DIPECHO 6th Action Plan (co-funding by NLRC)" and 4 pilot communes in 4 regions. Netherlands Red Cross also involved? Survey carried out in Quang Nam province. Initial results have been published. To be followed up by workshops and development of adaptation measures if possible. The climate change adaptation component will support the implementation of the National Target Programme to Respond to Climate Change under the Ministry of Natural Resources and Environment at the national level and specifically in the two climate vulnerable provinces of Ben Tre and Quang Nam. The objective is to enhance Vietnam’s capacity and efficiency in response to climate change in order to ensure sustainable development, protect people from its harmful consequences, prevent and reduce risks posed by Climate Change while joining the efforts of the international community’s to mitigate its impacts, and protect the global climatic system. Meets Funds allocated Location Start End $446,850 Nationwide 2008 2009 $99,000 Quang Nam 2008 2009 $40,000,000 National and Quang Nam, Ben Tre 2009 2014 Page 70 Name of Project Source Funds Climate Change stakeholders mapping and policy analysis Integration of CC into land Use Planning of Implementing Agency Project or Study Details Oxfam GB Challenge Change Sweden/ODA SEMLA Main Objectives: To map all related agencies working on Climate Change. To analyse the CC policy formulation process and key agencies in various ministries. To provide recommendations to Oxfam for the new strategy on CC. One of the most relevant activities in the SEMLA programme are the activities in respect of Land Use Planning, since LUP is a comprehensive framework for management of land resources and planning for optimal future land use, and thus has the potential to act as a tool for CC adaptation. The LUP/CC results will be evaluated along the way and be incorporated in the improved model for integrated LUP during 2008. This in turn feeds into the ongoing revision of the land law which is undertaken during 2008. to Funds allocated Page 71 Location Start End 2008 National 2007 2008 Annex 6: Background Information on Bac Kan and Son La Provinces Son La Son La Province is the largest Province in the Northwestern Region with a total coverage of 14,174 km2 and the provincial population of 1.024 million, which occupy 38% of those of the Region. The population density is 72 persons/km2. Ethnic groups in the Province include Thai (55% of the provincial population), Kinh (17%), Hmong (13%), and Muong (8%). Eighty-seven percent (87%) of the workforce is engaged in agriculture. Per capita GDP was US$266 in 2005. The road from Hanoi to Son La through Hoa Binh, is 315 km long (National Road No. 6). Moc Chau District, which is located at the southernmost edge of the Province, is 200 km away from Hanoi. Compared to Lai Chau and Dien Bien Provinces, Son La Province is lower in elevation. Some 70% of the provincial land lies between 100m and 1,000m above sea level, while 57% of the land is mountainous with slope gradient of over 30%. Sixty-four percent (64%) of the provincial areas belongs to the Da River basin, while 35% is in the Ma River basin. Provincial GDP was 4.177 trillion VND in 2005, which was 39% of the GDP of the Region. The provincial economy relies highly on primary industry accounting for 43% of the provincial GDP. Cultivated area extends over 254,000 ha or 18% of the provincial land. Out of the cultivated area, 198,000 ha (78%) are planted with upland crops, while only 14,000 ha (6%) is for paddy. The ratio of paddy field is significantly smaller than those of other Provinces of the Region. Due to the unbalanced distribution of land and water resources, the development potential for paddy is limited. In contrast, orchard fields prevail with a total coverage of 42,000 ha (16%). The total production of lowland and upland paddy amounted to 128,000 ton in 2005. This is equivalent to 85 kg of milled rice per person, which is only 51% of the national average of 168 kg. Maize substitutes for rice. The maize production in the Province is 288,000 tons, which is 57% of the total production in the Region. Many industrial crops such as tea, coffee, cotton, soy beans, etc. are cultivated. Moc Chau District is the most famous agricultural area in the Province owing not only to good soil and climatic conditions, but also to a good geographical position, which is five hours by car from Hanoi. Tea, dairy products and premium vegetables produced in Moc Chau District are bound for markets in Hanoi. Bac Kan Bac Kan is a mountainous province located in the Northeast region of Vietnam, ranged from 21 o48 to 22o44 North latitudes and 105o26-106o15 East longitudes. Bac Kan province is one of the poorest provinces in Vietnam and the northern mountainous region (NMR) in particular. Sharing its borders are Cao Bang province to the North, Tuyen Quang province to the West, Lang Son province to the Southeast, and Thai Nguyen province to the South. Bac Kan is roughly 500 -1,000 meters above sea level and its topography is extremely diverse with mainly midlands and mountains, and greatly steep slopes of around 15 to 20%. Page 72 Steep sloped land causes great erosion and degradation of soils. Therefore, soil quality is poor with high pH values. In addition, “slash and burn” situation in uplands is another reason of soil erosion and degradation creating treeless hills and mountains. There is a complex network of five large rivers and complex springs that provide irrigation water, and keeping balance ecological geography among seasons. Particularly, Bac Kan province is located in riverhead of many rivers such as Gam river, Cau river, Bac Giang river, etc. Therefore, steep slopes, rainfall concentration in wet reason, and high flows by heavy rainfalls might cause flash floods in the province. Its natural land area is 4,868 km2, occupying 1.5% of Vietnam’s natural land areas. Its total land area is 486,800 ha including 37,700 ha of agricultural land (7.7%) and 333,600 ha forest land (68.5%). Another noteworthy feature is that roughly more than 20.0% of the land area is non-usable land (Bac Kan PSO, 2006). Of which only a small part is flat land (3.3%), and large areas of land are hilly (91.7%) and rockmountains (4.8%), which are not highly favourable for agriculture. The total provincial population is estimated at 306,000, accounting for around 0.4% of national population. Peoples living in rural areas is accounted for roughly 85% of the provincial population, which is significantly higher than the country data (around 70%). The population density varies drastically among districts and towns of the province, which is indicated by highly populated Bac Kan town and scattered remote districts. Up to about 87% of provincial population is ethnic minority groups. 23 ethnic groups are living together in the province, mainly Tay, Nung, Dao, Kinh, and H’Mong. Tay people occupy the largest part of total provincial population accounting for 54.3% of the total provincial population. The second biggest group is Dao people at 16.5% of the provincial population, ranking next are the Kinh people with 13.3% of total population. Nung and H’mong people are ranked behind those ethnic groups, with 9.5% and 5.4%, respectively. Only around 1.0% of total provincial people are 18 other ethnic groups. The proportion of provincial agricultural value including forestry and fishery contributed approximately 43% of total provincial GDP in 2005, accounting for nearly two times compared to that of the country (19.7%). Services and industrial sectors obtained lower proportion, accounting for around 36.0 and 21.0% respectively. Bac Kan is strongly dependent on the agricultural sector for many purposes such as food, employment, and income. The development of the agricultural sector is still a high priority in the overall provincial economic development plan, which aims to alleviate poverty and develop its economic growth. Bac Kan has a large labour proportion employed in the agricultural sector, where gross outputs from agriculture accounted for the small amount compared to other provinces in the NMR. Crop production is still a predominant sector, contributing for the most important part in term of gross outputs of agriculture as well as cash resource of the province. It is stated that Bac Kan province is largely prone to drought, flash floods, landslides, and soil erosion, which are perceived to be most at risk to local people. Other related climate change events such as changeable temperature, changing seasons, high precipitation, water-logging, decreasing of water resources, thunderstorms, and hails also occurred in the province, but in a lower frequency, intensity and less impact than those mentioned above. However, their frequency and intensity as well as impacts tend to be increasing gradually. It is said that weather in Bac Kan is changeable and seems to gradually change to two clear seasons: dry and wet instead of four seasons as usual. Temperature is also expressing a dramatic differentiation between day and night. It is getting warmer in the province, not only in summer but also in winter. Particularly, there is a serious cold outbreak in 2008, causing many damages. The temperature changing does not happen routinely. Bac Kan province will tend to suffer from more intense rain, posing high threats to livelihoods, infrastructure, and agricultural production. Thus, people living in highlands will be faced with increasing risks of flash floods and landslides caused by heavy rainfall. Rainfall is unevenly distributed throughout the rainy seasons, causing floods, flashfloods, landslides and soil erosions. Rain is also distinctly Page 73 changeable, which might be indicated by shorter rain periods with higher intensity and frequency. Recently, heavy rainfall lasting for two to three hours could create to a flash flood, where as previously flash flooding might be caused after several days of rain. Moreover, rainy season is lasting a longer time, from February to October. Drought is also showing changeability with much more frequency and greater intensity and impacts. Natural water resources are decreasing in water quantity and quality. Water resource in rivers and streams is showing higher level in the rainy season and lower levels in the dry compared to the former time. Likely, whirlwind, thunderstorm, and hail seem to have greater intensity and higher impacts when its combination with other events such as floods. Page 74 Annex 7: Detailed Information on the Selected Demonstration Sub-projects Under Outcome 3, adaptation to climate change is to be demonstrated on the following subprojects: Son La: (1) Upgrading rural road from 108 Road to Muong E in Thuan Chau District (2) Upgrading irrigation system and landslide protection embankment in Tham Mon Commune, Thuan Chau district Bac Kan: (1) Cau river bank protection (2) Upgrading rural road of two districts: Ba Be and Bach Thong Note that the road in Bac Kan (i.e. no. 2) is separated into 2 small sections of Road, one in Ba Be, the other in Bach Khong, hence there are two separate descriptions. In order to select sub-projects for the SRIDP, the following selection and screening criteria were used: Criterion Compliance 1. Project included in the SEDP and will have positive impact on Yes poverty reduction 2. a) No significant resettlement Yes issues b) No significant impact on environment Yes Reference Section (in the description document) B1 Subproject will not involve major land acquisition and compensation issues (F1) Subproject upgrading existing road not likely to have significant long term impact on environment (F2) c) No adverse impact on ethnic minorities Yes F3 d) No adverse impact on women, and vulnerable groups Yes F4 Page 75 3. Subproject is in rural area Yes (mountainous or lowland) where there is a high poverty incidence A4 4. Project > $1M but < $ 5M Yes USD A5 5. O&M D1, D2 Yes 6. Link to existing infrastructure Yes 7. Link with other Govt. and Yes donor projects B3 B2 Page 76 Annex 8: Stakeholder Involvement Plan Stakeholders Responsibilities related to Project Potential role in Project MARD MARD Several Departments have responsibilities related to rural development and improvements of rural infrastructure, notably Department of Construction Management, and Department of Dyke Management and Flood Storm Control. Will play a role on the Project Steering Committee Should benefit from capacity building on how to increase resilience and decrease vulnerability of rural infrastructure to climate change. Should benefit from policy support to institutionalise project successes. MARD – Agriculture Project Responsible for preparation and oversight of rural infrastructure Management Board projects. Hence, hold some responsibility for mainstreaming climate change into such projects. Will be partly responsible for disseminating lesson learnt across Vietnam. Should benefit from in-depth capacity building on how to increase resilience and decrease vulnerability of rural infrastructure to climate change. MARD - Department of Science, Technology and Environment/OCCA Standing Office Responsible for preparation and oversight of MARD strategic response to climate change. Hold technical knowledge and skills on climate change impacts related to agriculture and rural development. Will play a role on the Project Technical Advisory Committee. Should benefit from in-depth capacity building on how to increase resilience and decrease vulnerability of rural infrastructure to climate change. Should benefit from manuals/guidelines/best practices documentation produce by project. MARD - Department of Dyke Responsible for many issues related to disaster management in Management and Flood northern Vietnam, including: Vietnamese Flood control system; Storm Control dyke management operations; operations of floods and storm Page 77 control; plans for dykes, floods and storm control. Should benefit from training on climate change and how to coordinate climate change adaptation with disaster management in northern mountains. MARD - National Institute of Responsible for preparation of long term plans and strategies Agriculture Planning and related to rural development, including infrastructure. Projection Should benefit from training/policy advice on how to integrate climate change concerns into long-term strategies and plans. MARD - National Centre for Prepare plans, strategies, policies and standards/regulations Rural Water Supply and related to water supply in rural areas. Environmental Sanitation. Should benefit from training/policy advice on how to integrate climate change concerns into strategies, and plans, etc. MARD – Department for Prepare plans, strategies, policies and standards/regulations water resources. related to irrigation. Should benefit from training/policy advice on how to integrate climate change concerns into strategies, and plans, etc. MONRE MONRE Lead role in addressing climate change issues across all sectors. Standing Vice Chair of the National Steering Committee for the National Target to Respond to Climate Change (NTP), and Chair of the Executive Board of NTP, hosting the office of the Standing Office of the NTP. Not applicable. MONRE - Department. of Prepare draft Guidelines to sectors/provinces on how to Meteorology, Hydrology, implement NTP and how to prepare Action Plan for responding and Climate Change to climate change. Will play a role on the Project Technical Advisory Committee. Should benefit from project findings and lessons learnt, these will feed into future guidelines. MONRE – Viet Nam Institute Key role in undertaking research in the field of climate change of Meteorology, Hydrology (includes preparing scenarios, adaptation measures) and Environment Should benefit from technical assistance on how to provide down-scaled scenarios addressing extreme values, and on Page 78 vulnerability mapping. MONRE - National Hydro Key role in managing all issues related to meteorology and Meteorological Service of hydrology (observation network, data collection, short and Vietnam medium term forecasting – for meteorology, hydrology and some environmental factors). May benefit from some training. Other Ministries MINISTRY OF TRANSPORT Prepare national master plans and strategies covering rural transport infrastructure. Issue policies, laws and by-laws covering rural transport infrastructure. Issue standards covering rural transport infrastructure. Should benefit from training/policy advice on how to integrate climate change concerns into strategies, and plans, etc. MINISTRY OF PLANNING Performs the functions of State management over planning and AND INVESMENT investment, including the provision of general advices on strategies, plannings and plans on national socio- economic development, on mechanism and policies for general economic management and some specific fields, on domestic and foreign investment, etc. Should benefit from training/policy advice on how to integrate climate change concerns into strategies, and plans, etc. Provincial Agencies Provincial Committee People’s Takes key decisions on sustainable development and guides overall development. Would benefit from awareness raising on climate change and impacts on poverty and provincial development. Provincial Departments of Responsible for executing mandate of all MARD departments at Agriculture and Rural the provincial level. This includes the planning, oversight and Development monitoring of rural infrastructure projects related to agriculture. Should benefit from in-depth training/policy advice on climate change, climate change impacts, and how to integrate climate change concerns into planning and operations. Provincial Departments of Responsible for executing mandate of MPI at the provincial Planning and Investment level. This includes coordinating socio-economic planning. Should benefit from training/policy advice on climate change, Page 79 climate change impacts, and how to integrate climate change concerns into planning and operations. Provincial Departments of Responsible for executing mandate of all MONRE departments Natural Resources and at the provincial level. This includes drafting provincial action Environment plan to respond to climate change. Should benefit from in-depth training/policy advice on climate change, climate change impacts, and how to integrate climate change concerns into planning and operations. Provincial Departments of Responsible for executing mandate of concerned Ministries at construction, transport, etc. the provincial level. Decide on measures to maintain roads and respond to landslides. Should benefit from in-depth training/policy advice on climate change, climate change impacts, and how to integrate climate change concerns into planning and operations. Provincial Committee for Responsible for responding to natural disasters. Flood Management and Should benefit from training/policy advice on climate change, Search and Rescue climate change impacts, and how to integrate climate change concerns into their activities. Media organisations Inform public on climate change and related issues. Should benefit from training on climate change, climate change impacts, and how to integrate climate change concerns into operations. NGOs and Mass movement organisations (e.g. Farmers Association, Vietnamese Red Cross) Support people to implement provincial plans, eg in responding to disasters, and implementing awareness raising campaigns in line with action plan. Business Units and private sector (provincial, and local branches of national companies). Responsible for maintaining infrastructure, including clear-up after land-slides and disasters. Based on a competitive selection process, companies will be responsible for the design, supervision and construction of infrastructure projects. Should benefit from training on climate change, climate change impacts, and how to integrate climate change concerns into operations. Should benefit from in-depth training on climate change, climate change impacts, and how to integrate climate change concerns into operations. Page 80 Annex 9: Capacity Scorecard This score-card is the indicator measurement tool for Outcome 2 – Enhanced capacity to adapt/climate-proof rural infrastructure investments and provincial/local area planning. The score-card is based on the Capacity Development Indicator scorecard prepared by UNDP globally. However, it has been greatly modified to suit adaptation to climate change, rural infrastructure, poverty reduction and local conditions in northern Vietnam. This score card includes 10 questions. The questions will be asked to the DARD in each of the 15 northern mountainous provinces, each year. It should be the same respondent each year. For each question, the stakeholder will give a response, giving a score between 0 and 3. Hence, for all 10 questions, each stakeholder will give a total score ranging between 0 and 30. For all fifteen provinces, the total score could lie between 0 and 450. The baseline value should be determined during project Inception activities. Once the baseline has been determined, the project steering committee should meet to discuss the target for the end-ofproject. It is recommended that this target be at least 20% higher than the baseline. In the first year, it may become apparent that some questions are inappropriate/irrelevant for some stakeholders. Note should be made of this, and the score for these question/stakeholders placed at 0 for all subsequent years. Questions 1. There are effective plans to address climate change in the province. 0 – No ‘Provincial Action Plan to respond to climate change and sea level rise’ exits; ( 1 – A Provincial Action Plan exists, but it is incomplete and not approved; 2 – A Provincial Action Plan exists, it is complete, and efforts are under way to implement it; 3 – The province has allocated resources to implement the Provincial Action Plan, and appointed a senior agency to oversee plan implementation 2. There are effective measures (i.e. additional design steps or additional construction procedures or revised construction methods or revised design specifications) to address climate change impacts on rural infrastructure in the province . 0 – No provincial measures to address climate change impacts on rural infrastructure exit; 1 – The measures to address climate change impacts on rural infrastructure are clearly defined, but are not being implemented; Page 81 2 – The measures to address climate change impacts on rural infrastructure are clearly defined, and efforts are under way to implement them; 3 – The province has allocated resources to implement the measures, and appointed a senior agency to ensure implementation 3. In the DARD, the personnel working on climate change: 0 – No staff have been allocated to work on climate change; 1 – Staff have been appointed to work on climate change, but have received no special training or guidance; 2 – Staff have been appointed, they have received training and guidance, but are not yet able to meet all expectations; 3 – Staff are fully active in response to climate change, in a coordinated and coherent manner. 4. Cooperation amongst the provincial agencies responsible for climate change: 0 – Is absent; 1 – Exists, but is not sufficient; 2 – Exists and is helping to improve performance; 3 – Is very effective. 5. Training on adapting to climate change for DARD and other staff: 0 – there has been no training; 1 – Training has been very limited; 2 – There has been much training, but more is needed; 3 – Training has been adequate. 6. Expertise in the province to integrate climate change concerns into the design of rural infrastructure: 0 – There are no experts (i.e. qualified personnel with either post-graduate qualifications or 3 years experience) able to integrate climate change concerns into the design of rural infrastructure; 1 – There are no local experts able to integrate climate change concerns into the design of rural infrastructure, but expertise is available at national level and in nearby provinces; Page 82 2 – There is some expertise to integrate climate change concerns into the design of rural infrastructure, but it is not sufficient; 3 – Expertise to integrate climate change concerns into the design of rural infrastructure is adequate. 7. Standards 0 – Existing standards make it impossible to integrate climate change concerns into the design of rural infrastructure: 1 – Existing standards limit the extent to which it is possible to integrate climate change concerns into the design of rural infrastructure; 2 – Existing standards are largely adequate to allow the integration of climate change concerns into the design of rural infrastructure, but more guidance and/or flexibility is needed; 3 – Existing standards are fully adequate to allow the integrationof climate change concerns into the design of rural infrastructure. 8. Adaptation plans have the political commitment they require: 0 - There is no political will at all, or the prevailing political will results in maladaptive actions; 1 - Some political will exists, but is not strong enough to make a difference; 2 - Reasonable political will exists, but is not always strong enough to fully support the necessary adaptation measures; 3 -- There are very high levels of political will to support adaptation measures. 9. Institutions and organizations have the data & information they need to develop, implement and monitor strategies to plan for and respond to CC. 0 - Information is almost all lacking; 1 - Some information exists, but is of poor quality, is of limited usefulness, or is very difficult to access; 2 - Much information is easily available and mostly of good quality, but there remain some gaps in quality, coverage and availability; 3 - Institutions have the information they need to develop, implement and monitor adaptation strategies 10. Institutions are able effectively to disseminate information on CC, adaptation and related management strategies to the public Page 83 0 - information on CC & related issues does not reach the public; 1 - Information is disseminated but not understood or seen as irrelevant by the public; 2 - Information reaches some sections of the public, e.g. more educated sectors, & informs views of adaptation & management needs; 3 - Information reaches wide cross section of public and is understood, fostering widespread recognition of need for adaptation. Page 84 Annex 10: Terms of Reference Project Board Tasks and Mandate The Project Board (PB) will be responsible for overall support, policy guidance and overall supervision of the project. The PB is specifically responsible for: validating key project outputs, notably annual workplans, budgets, technical reports and progress; monitoring and evaluating project progress. Other key tasks of the PB include: Ensure that GEF/SCCF resources are committed exclusively to activities that relate to the achievement of approved project objective and outcomes and in line with approved annual workplans; Provide guidance on overall project management arrangements to ensure coherence and coordinated implementation of all components of the project; Arbitrate significant conflicts within the project; Negotiate a solution to major problems that may arise between the project and external bodies; Ensure coordination with similar projects and programmes in Vietnam; Ensure the Project CPMU has access to data and information from other sources in-country; Examine and approve annual workplans; Examine and approve monitoring reports; Examine and approve activity and progress reports; Ensure that the PB recommendations are enacted; Review the performance of the CPMU, and make recommendations, and; Recommend actions and activities to be implemented under the project. Membership The PB meets at least twice per year, and when convened by the Chair. Membership will be: MARD Vice-Director (Chair) MARD APMB MARD DOSTE UNDP ADB (Observer) Project Coordinator Scope: Full time over four years Objective: This is a high level policy/leadership position to oversee the project implementation. Page 85 The initial objective is to establish the CPMU Sub-project management unit and the project team and oversee the recruitment of its staff and its operationalisation. The next objective is to ensure regular work planning, adaptive management and monitoring of project progress towards project objectives and goals, and management of all project team staff. The third objective is to ensure the project team interacts functionally with all partners, Vietnamese and international, at high levels. This includes developing joint objectives and activities with international partners and other projects. Tasks (these include, but are not limited to): Management and Planning 1. 2. Supervise and lead the project team in discharging duties at an optimum lelve; Assumes operational management of the project in consistency with the project document and UNDP policies and procedures; 3. Oversees preparation and updates of the project work plan as required; and formally submits updates to UNDP/ADB and reports on work plan progress to the NPD and UNDP/ADB as requested but at least quarterly; 4. Oversees the mobilization of project inputs under the responsibility of the UNDP; 5. Guides all team members; 6. Ensures that appropriate accounting records are kept, and financial procedures for NEX are followed, and facilitates and cooperates with audit processes at all times as required; 7. Ensures all reports are prepared in a timely manner; 8. Assist in the finalization of TORs and the identification and selection of national consultants; 9. Assists in the planning and design of all project activities, through the quarterly planning process and the preparations of TOR and Activity Descriptions; 10. Supervises the project staff and consultants assigned to project; 11. Throughout the project, when necessary, provides advice and guidance to the national consultants, to the international experts and to project partners; 12. Prepare Project Monitoring Plan, Project Risk Logs, Financial Reports, AWPs, Project Progress Reports, and Atlas Project Management Module; Partnerships 1. 2. 3. 4. 5. Ensures effective partnerships with other parties; Ensures project activities are integrated and coordinated with all MARD and APMB operations; Oversees development and implementation of communications strategy; Oversees development and implementation of the M&E monitoring system; Develop and maintain good working relationships with national and international partners in this sector; Policy 1. 2. 3. Oversees the recruitment of all consultants and sub-contractors and ensures that their work is focused on policy development; Advises on how to disseminate the project findings, notably to governmental departments; Assists on the dissemination of project findings, notably to governmental departments and internationally; Page 86 4. 5. Ensures the coordination of project policy oriented work with related work of partners; Helps establish a regular policy dialogue mechanism on adapting to climate change. Technical The National Coordinator will have nationally renowned expertise in at least one of the following fields: Rural economics; Infrastructure development; or; climate change forecasting and impact forecasting. Qualifications Appropriate University Degree in natural resources management, rural development management or economics; Substantial experience and familiarity with the development ministries and agencies in Vietnam; Verified excellent project management, team leadership, and facilitation; Ability to coordinate a large, multidisciplinary team of experts and consultants; Excellent drafting and communication skills. Senior Technical Advisor (STA) Scope: Approximately 6 months input over four years. This is a high level policy/leadership position to support the project implementation. The STA assists the National Project Coordinator in the achievement of all Objectives and when undertaking all Tasks. Tasks (these include, but are not limited to): PCU Management and Planning 1. 2. 3. 4. 5. 6. 7. Assists preparation and updates of the project work plan; Reviews all major reports and provides quality control on all key reports; Assists in the finalisation of methodologies; Assist in the finalization of TORs and the identification and selection of national consultants and international consultants; Assists in the planning and design of key project proejct activities, through the quarterly planning process and the preparations of TOR and Activity Descriptions; Advises and helps train the project staff and consultants assigned to project; Throughout the project, when necessary, provides advice and guidance to the national consultants, to the international experts and to project partners; Partnerships 1. 2. Supports development and implementation of communications strategy and of the M&E monitoring system; Helps develop working relationships with national and international partners in this sector, and helps mobilise follow-up resources to coastal protection; Page 87 Policy 1. 2. 3. 4. Introduces in an effective manner the related best practices from other countries, notably related to adaptation of rural infrastructure to climate hazards; Advises on the dissemination of project findings, notably to governmental departments and internationally; Ensures the coordination of project policy oriented work with related work of partners; Helps establish a regular policy dialogue mechanism on adapting to climate change. Technical The CTA should have renowned expertise in at least two one of the following fields: Rural development or climate change. Qualifications Appropriate University Degree in natural resources management, coastal zone management or economics; At least 10 years experience working with rural development or natural resources management projects in South east Asia, preferably Vietnam; Verified excellent project management, team leadership, and facilitation skills; Vietnamese language skills a strong asset; Excellent drafting and communication skills. National Technical Advisor Scope: Full time over four years Objective/scope: This is a supportive position to support project implementation and project impact. Tasks (these include, but are not limited to): Including: Undertake technical oversight on a daily basis of all activities; Help develop and implement project’s strategic approach to capacity building; Help develop the project approach to climate change downscaling; Develop methodologies for major project activities; Review all major outputs and reports and contribute to improving their quality; Oversee and help implement project work to strengthen resource mobilization; Help to implement project communications strategy; Oversee project consultants and contractors; Identify, analyse and communicate lessons learnt that may be useful in the design and implementation of similar projects; Page 88 Oversee implementation of the project’s communication strategy; Oversee implementation of the project’s M&E; Ensure Vietnamese stakeholders benefit from best practices and latest knowledge throughout Asia. Qualifications Appropriate University Degree in natural resources management, rural development or economics; Substantive experience in projects related to climate science will be a major asset; Substantive experience in international development projects; Substantive experience in developing capacity development strategies; Ability to coordinate a multidisciplinary team of experts and consultants. Project Financial Assistant Scope: Half time over four years Tasks: include Standardize the finance and accounting systems of the project while maintaining compatibility with UNDP financial and accounting procedures Prepare budget revisions of the projects based on the Combined Delivery Reports (CDRs) Assist in the preparation of the Annual Work Plan (AWP) Comply and verify budget and accounting data by researching files, calculating costs, and estimating anticipated expenditures from readily available information sources. Prepare financial status reports, progress reports and other required financial reports Process all types of payment requests for settlement purpose including quarterly advances to the partners Prepare periodic accounting records by recording receipts and disbursements (ledgers, cash books, vouchers, etc.) and reconciling data for recurring or financial special reports and assist in preparation of annual procurement plan Undertake project financial closure formalities including submission of terminal reports, transfer and disposal of equipment, processing of semi-final and final revisions, and support professional staff in preparing the terminal assessment reports Prepare reports and documents as per specified formats, project, or programme plans and general reference documents as well as general administrative/financial or specialised tasks related to the project which may be of a confidential nature within the assigned area of responsibility Assist in the timely issuance of contracts and assurance of other eligible entitlements of the projects personnel, experts, and consultants by preparing annual recruitment plans Provide substantive support to the National Project Manager for overall implementation Prepare and update inventories of expendable and non-expendable project equipment. Project Administrative Assistant Scope: Half time over four years Tasks: include Page 89 Set up and maintain all files and records of the project in both electronic and hard copies Collect project related information data Help establish office and purchase office facilities; Update plans Establish document control procedures Compile, copy and distribute all project reports Provide logistical support to the National Project Manager, and national/international consultants in organising training events, workshops, and seminars Assist international, short-term consultants by organizing their travel schedules, arranging meetings with different stakeholders, and booking hotel accommodations Provide support in the use of Atlas for monitoring and reporting Draft necessary correspondence with local and international agencies and stakeholders Technical Advisory Group At the outset of the project, the Project Board will assess the usefulness of establishing a Technical Advisory Group on ‘Climate Science and Vulnerability Assessment’. If established, this Group will provide technical guidance and reviews specifically covering components 2 and 3 of the Project. This Group would be chaired by MARD. Its membership will be drawn from a combination of government and non government experts. The non-government experts will be funded from within Components 2 and 3 of the project. Other members of the Group may be drawn from the MARD Office for Climate Change (OCCA), and the Department for Hydrometeorology and Climate Change of MONRE. The Group is not executive or authoritative. It will not take decisions regarding the approval of inputs, outputs or payments. It will provide technical support, advice and facilitate coordination. Tasks could include: Providing comments on project planning documents (annual workplans, annual progress reports, TOR for main activities); Providing comments on main project outputs; Facilitating coordination with related initiatives, for example by ensuring information flow; Facilitating approval of project outputs in the organizations of their concerned agency; Helping to find effective technical service providers. Page 90 DRAFT FOR DISCUSSION ONLY Annex 11: Overall Project Management and Organizational Structure GEF Implementing Agencies ADB/UNDP Ministry of Agriculture and Rural Development ADB/UNDP Agricultural Projects Management Board GEF/SCCF Project Board (MARD ICD, MARD-DOST, APMB, UNDP) Central Project Management Unit GEF/SCCF Sub-Project Management Unit Departments of Agriculture and Rural Development Components 1, 2 & 4 (GEF/SCCF funds through UNDP NIM) Component 3 (GEF/SCCF funds through ADB TA) GEF/SCCF Technical Advisory Group on Climate Science and Vulnerability Assessment Provincial Project Management Units Subproject Contracts Page 91 DRAFT FOR DISCUSSION ONLY Central Project Management Unit Project Director Deputy Director Finance and Administration Donor Liaison Finance and Administration Deputy Director Technical and Planning Donor Liaison Technical and Planning Program Officer Chief Accountant Assist. Accountant (2) Disbursement Offr. (2) Cash (2) Consultant Coordinator Snr Offr GEF/SCCF Project Coordinator Components 1, 2 & 4 (UNDP) Component 3 (ADB) Technical Senior Technical Advisor Safeguards Offrs. (3) Planning (2) Officer Interpreters (3) Monitoring Officer Financial Officer Controllers Finance Offrs. (2) Procurement Offr. (2) Admin. Assistant Infrastructure Engineers. (2) Drivers (2) Administration Assistant Technical consultants (Nat/Int) Team Leader Page 92 Technical consultants (Nat/Int) Annex 12. Memorandum Of Understanding Between The Asian Development Bank And The Government Of Viet Nam for the Technical Assistance Project: Promoting Climate Resilient Rural Infrastructure In Northern Vietnam See separate file. 93 Annex 13: ADB TA Paper: VIETNAM: Promoting Climate Resilient Rural Infrastructure in Northern Viet Nam See Separate File 94 Annex 14: Co-financing letter The following covers UNDP co-financing amounting to a total of USD 6,765,000. The Government of Vietnam and ADB co-financing are provided in the MoU signed in January 2011 – see Annex 12. 95