Transport Services Division ENVIRONMENT Operational Procedures & Forms Vegetation Management Plan Type B Consolidated – Off Site Works for (PROJECT NAME) Vegetation Remediation Project Name (SEB Offset Credit Site): Insert remediation project name Knet File ID: Insert K-net file number and name PATCHS No: Insert PATCHS number Associated Road Construction etc, Projects (SEB Offset Debit Sites): Site 1: Project Name: Insert primary vegetation removal project name Road Name: Road Number: PATCHS No: File No: Site2: Project Name: Insert additional vegetation removal project name Road Name: Road Number: PATCHS No: File No: OR text such as Future offset debit sites in the area to be determined by construction programme. CONTENTS 1. PROJECT SUMMARY 2. PROJECT and SITE DATA 3. PROJECT REQUIREMENTS and OBJECTIVES 4. PROJECT WORKS SUMMARY 5. PLANTING (includes plant schedule) 6. DIRECT SEEDING (includes seed schedule) 7. BUSHCARE and WEED CONTROL (includes schedule) 8. RELOCATION OF TREE HOLLOWS 9. SITE FENCING / SIGNAGE PLAN 10. MANAGEMENT (establishment and maintenance period) 11. CONTRACTOR REQUIREMENTS 12. APPROVALS REGISTER Attachment 1: SKETCH CONCEPT / LOCATION PLAN Attachment 2: VMP COST ESTIMATE ( includes Specialist Services Costs) (DTEI - TSD internal use only - not for external release) K-Net Doc: Version No.: Issue Date: Doc. Owner: 1669763 1 03/08/2007 Principal Environment Officer UNCONTROLLED COPY WHEN PRINTED Page 1 of 10 Vegetation Management Plan Type B Consolidated – Off Site Works 1. PROJECT SUMMARY example This remediation project has been initiated primarily to provide SEB offset credits (6.085ha) for vegetation clearance at the current Mount Jagged Overtaking Lane site (3.0825ha offset debit) and the proposed (but now postponed indefinitely) Mount Compass Overtaking Lane (duplication) project. The proposed remediation project is situated on an undeveloped road corridor south of and parallel to Nangkita Road approximately 5 km east of Mount Compass. The road corridor roughly follows the south side of the main northern tributary and associated swamps of Tookayerta Creek, which originates west of Mount Compass. A man made drain constructed in the early part of the 1900’s to drain swampy land occupies part of the eastern end of the road corridor. The road corridor is in the care and control of Alexandrina Council and the proposed project is supported by its Natural Resources Management Officer. The corridor is fenced on its southern side but generally unfenced on its northern side adjoining 19 small allotments fronting Nangkita and Waterfall Roads. It is approximately 3.7km long by 20 metres wide (30 metres in some sections) and covers an area of approximately 7.5 ha. The road reserve contains scattered remnants of Eucalyptus baxteri low open woodland (mainly single and small groups of trees) with some remnant understorey and associated tree species in a widespread ground stratum dominated by Pteridium esculentum (Bracken) and Ehrharta calycina (Perennial Veldt Grass) with significant infestations of Rubus fruticosus (Blackberry), Senecio pterophorus (African Daisy), Cytisus scoparius (English Broom) and Ulex europaeus (Gorse). Some private revegetation (with local species and provenances) has been carried in the corridor in the last decade. The proposed remediation project involves eradication of many of the main weed species, followed by fencing of the northern boundary and revegetation with trees, mid level shrub stratum species and some of the more robust of the smaller heathy understorey species. Intensive weed control will be carried out in the better remnant vegetation areas, approximately 2.814 ha. Selective weed control will be carried out in the proposed revegetation area of 2.352ha and adjoining areas (such as those with some existing revegetation) of a further 0.626ha, for a total offset works area of 6.058ha, plus fencing of approximately 3735 linear metres. The proposed project timeframe is from June 2006 (weed control works commence) to June 2009, with revegetation to be carried out in mid 2007. The proposed works are expected to have significant general biodiversity value, particularly as a fauna and avifauna corridor linking existing remnant woodland patches and swamps along the Tookayerta Creek tributary. This includes specific potential benefit in providing heathy woodland movement corridors for small threatened populations of Mount Lofty Ranges Southern Emu-Wren which have been recorded occasionally in swamp remnants along the creek tributary. There is also potential for further future works in adjoining contiguous undeveloped road reserve in the care and control of Alexandrina Council, which extends west from Willowburn Drive to link with significant Emu-Wren habitat swamps at Mount Compass. 2. PROJECT and SITE DATA Vegetation Remediation Project Name (SEB Offset Credit Site): Undeveloped Road Corridor at Nangkita (Willowburn Drive to Waterfall Road) - Revegetation, Weed Control and Bushcare Knet File ID (VMP): #1669763-v2-Environment_-_Landscape_-_Land_Management_-_VMP_TEMPLATE_type_b_consolidated__offsite_DRAFT.DOC VMP Date (for approval): PATCHS No: LMPD ID No: NVC Decision Nos: K-Net Doc: Version No.: Issue Date: Doc. Owner: File No: Vegrem Ref No: Mt Jagged Overtaking Lane Extension 1669763 1 03/12/2007 Principal Environment Officer 7/12/05 ref 2005/3003/455 UNCONTROLLED COPY WHEN PRINTED Page 2 of 10 Vegetation Management Plan Type B Consolidated – Off Site Works Site Location Description: Undeveloped Alexandrina Council local road reserve, south of Nangkita Road at Nangkita, between Willowburn Drive (west end) and Waterfall Road (east end) Site Location Coordinates (Latitude Longitude /WGS 84 Zone 5X / GDA94 MGA Zone 5X. NB: Zone will be either 52, 53 or 54):: Description : E N Description E N Total Site Area: xxxx ha SEB Offset Credit Area: xxxx ha (xxxx ha selective weed control including xxxx ha tubestock revegetation, + xxxx ha bushcare/ weed control in remnant open forest) DTEI TSD Region: Council: Other Stakeholders: Local landowners (Nangkita Rd, Willowburn Drive, Waterfall Rd), Mount Lofty Ranges Southern Emu Wren Recovery Program (MLRSEWRP) Remediation Project Manager: VMP Author: VMP APPROVAL REQUIREMENTS: Project Manager landowner Native Vegetation Council or delegate Associated Road Construction etc, Projects (SEB Offset Debit Sites): Site 1: Project Name: Road Name: Road Number: PATCHS No: File No: Infrastructure/ Vegetation Removal Project Manager: Site Location Description: Maintenance Marker, Start 30.25, Finish 30.85, Side of Road West The proposed northern extension of the Mount Jagged lane is located on an undulating plain of low relief in the Mount Compass Environmental Association (3.2.10). Soils of the area range from imperfectly drained yellow duplex to well-drained red duplex soils (Laut et al. 1977). Vegetation of the area has been extensively cleared, with the Hundred of Goolwa retaining 12.6% and the Mount Compass Environmental Association retaining 13.3% of remnant vegetation (DEH 2002). Much of the road reserve contains remnant Eucalyptus baxteri / E.fasciculosa / E. cosmophylla Low Woodland over Xanthorrhea semiplana and Acacia spp and a Baumea spp. / Ghania sieberiana / Phragmites australis Closed Sedgeland. Site Location Coordinates (Latitude Longitude /WGS 84 Zone 5X / GDA94 MGA Zone 5X. NB: Zone will be either 52, 53 or 54): Vegetation Removal Areas: xxxx ha Native Vegetation SEB debit offset area : 3.0825 ha Native Vegetation SEB credits : xxxx ha, Nangkita undeveloped road corridor (this VMP) DPTI TSD Region: Council: LMPD ID No: Vegrem Ref No: NVC Decision No: Site2: Future offset debit sites in the area to be determined. Mount Compass overtaking lane now on hold indefinitely. Offset credit from these SEB offset works available for future works : xxxx ha credit K-Net Doc: Version No.: Issue Date: Doc. Owner: 1669763 1 03/12/2007 Principal Environment Officer UNCONTROLLED COPY WHEN PRINTED Page 3 of 10 Vegetation Management Plan Type B Consolidated – Off Site Works 3. PROJECT REQUIREMENTS and OBJECTIVES 3.1 Project Requirements - Summary SEB remediation required credit area for Mt Jagged overtaking lane vegetation removal : 3.0825 ha Vegetation types removed: Generally low open woodland formations Eucalyptus baxteri over sclerophyllous low scrubland & Eucalyptus ovata +/- E. camaldulensis low woodland over Sedgeland. Both of these vegetation types exist in scattered groups of varying condition along the road reserve. 3.2 Project Objectives Remediation of the undeveloped road corridor at Nangkita to achieve a significant environmental benefit by removal of targeted environmental weed species from the corridor, bushcare to patches of remnant vegetation and revegetation to establish the main tree and shrub species of Eucalyptus baxteri low open woodland, +/- Eucalyptus cosmophylla, Eucalyptus fasciculosa and Eucalyptus ovata (lower areas). Main species of the heathy under-stratum to include Hakea spp., Leptospermum spp., Xanthorrhoea semiplana, Banksia spp. Performance Benchmark Data: Site Conditions: Good (Generally good deep sand soil conditions, high weed threat, but ongoing weed control measures planned) Climate Zone: High Rainfall Tubestock Survival Rate Benchmark : After 1 year: xx% After 3 years: xx% After 5 years: xx% Table of Objectives with percentage component of works ( weight ) Insert the percentage of works value for each applicable objective, based on the resources required to achieve the objective. Standard descriptions may be modified or objectives added to part 4 'other' 1. % component of works ( weight ) REVEGETATION 1.a. Establish the basic floristic structure of the site association(s) with the main tree and shrub species, and ground layer to the degree appropriate to the site conditions 1.b. Establish the pioneer or dominant / main structural species of the site association(s) 1.c. Establish the structure of site-specific habitat or amenity planting, or buffer zone to adjacent intact vegetation or Bushcare area, with selected species 1.d. Stabilise disturbed areas, drains, batters, etc with selected species 2. BUSHCARE 2.a. Eradicate all weeds from Bushcare areas - basic construction and establishment contract period (12 - 15 months) 2.b. Eradicate targeted weeds from Bushcare areas - basic construction and establishment contract period (12 - 15 months) 2.c. Eradicate all weeds from Bushcare areas - extended period (2 - 5 years generally) 2.d. Control / substantially reduce infestation of invasive / targeted weeds from Bushcare areas 3. K-Net Doc: Version No.: Issue Date: Doc. Owner: WEED CONTROL 1669763 1 03/12/2007 Principal Environment Officer UNCONTROLLED COPY WHEN PRINTED Page 4 of 10 Vegetation Management Plan Type B Consolidated – Off Site Works 3.a. Eradicate selected proclaimed and environmental weeds on site 3.b. Control / remove woody weeds from the site or selected areas in the vicinity 3.c. Control weed infestations which threaten revegetation or Bushcare works areas 3.d. Control weed infestations which threaten adjacent intact or high quality vegetation 4. OTHER (describe) 4.a. example Control rabbits in the vicinity of the Bushcare and revegetation sites in association with landholders and the NRM authorised officer' 4. PROJECT WORKS SUMMARY Brief summary of the key features of the actual project works, no more than 1 page generally; objectives, background etc are discussed elsewhere Planting : Seeding: Weed Control : Bushcare: TOTAL PROPOSED REMEDIATION AREA : …… ha total SEB credit area in hectares 5. PLANTING Planting Due: month, year Arrange Seed Supply By: month,year Tree Guards: e.g. Corrugated flute-board Mulch Mats: e.g. jute 600mm square Seed Sources: e.g. local remnant vegetation Finalise Plant Orders By: month, year Stakes: e.g. for guards Plant Schedule (e.g. tubestock unless otherwise shown or add columns to schedule) Species (add further columns if required e.g common name, container, size, form, etc) Number TOTAL 6. DIRECT SEEDING n/a K-Net Doc: Version No.: Issue Date: Doc. Owner: 1669763 1 03/12/2007 Principal Environment Officer UNCONTROLLED COPY WHEN PRINTED Page 5 of 10 Vegetation Management Plan Type B Consolidated – Off Site Works 7. BUSHCARE and WEED CONTROL Weed control is designated for 3 zones which are distributed throughout the whole site as follows: ZONE A is the 'Bushcare/Remnant' zone of 2.814 ha, which generally consists of patches of disturbed remnant vegetation scattered throughout the site, with the most significant area at the western end of the site near Willowburn Drive. Intensive weed control is required to these areas, using low disturbance bushcare techniques and avoiding off-target damage. Refer to site plans for locations. ZONE B is the planting zone of 2.352 ha, which generally consists of more open areas along the corridor, often dominated by bracken or perennial veldt grass. 3000 plants are to be planted in this zone. Complete weed control is required to the planting zones, covering the whole area for group plantings and a buffer around each plant for scattered plantings. Bracken control will be required close to plants. Off-target damage is to be avoided. ZONE C is the selective weed control zone of 3.244 ha, which includes the planting zone B and as well as adjacent areas which may contain scattered remnant vegetation, mainly trees, and existing revegetation plantations by adjoining landowners. Specific weeds are to be controlled in this zone, including woody weeds but generally excluding grassy pasture species. The effective size of this zone, excluding zone B, is 0.892 ha. Weed control in or adjacent to watercourses is restricted to cultural control methods or the use of 'bi-active' Glyphosate herbicide. Weed Schedule - observed weeds to be controlled (control of additional species may be required) Species Common Name Control Methods Control Requirements Y = yes, N = no Asparagus asparagoides Chrysanthemoides monilifera Cirsium vulgare Cynodon dactylon Cytisus scoparius Bridal Creeper Boneseed Ehrharta calycina Eragrostis curvula Erica lusitanica Perennial Veldtgrass African Lovegrass Spanish Heath Freesia sp. Genista monspessulana Freesia Cape Broom Holcus lanatus Hypericum perforatum Hypochaeris spp. Malva parviflora Onopordum acanthium Yokshire Fog St John's Wort Cat's Ear Marshmallow Scotch Thistle Pennisetum clandestinum Phalaris aquatica Pinus radiata Piptatherum miliaceum Pittosporum undulatum Kikuyu Phalaris Monterey Pine Rice Millet Sweet Pittosporum Plantago lanceolata Polygonum aviculare Prunus spp. Lance-leaf Plantain Wireweed Plum, etc Rubus fruticosus Blackberry K-Net Doc: Version No.: Issue Date: Doc. Owner: Common Thistle Couch English Broom 1669763 1 03/12/2007 Principal Environment Officer Spot spray Pull seedlings, cut and swab larger plants Pull, spot spray Spot spray Pull seedlings, cut and swab larger plants Spot spray Spot spray Pull seedlings, cut and swab larger plants Spot spray Pull seedlings, cut and swab larger plants Spot spray Spot spray Spot spray Spot spray Pull seedlings / spot spray Spot spray Spot spray Pull seedlings, lop Spot spray Pull seedlings, cut and swab larger plants Spot spray Spot spray Pull seedlings, cut and swab larger plants Spot spray / Cut and swab Bushcare / Remnant Zone A Planting Zone B Selective Weed Control Zone C Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y N N Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y N Y N N Y Y Y Y Y Y Y Y Y Y Y Y N Y N Y Y Y Y Y Y Y N N Y Y Y Y UNCONTROLLED COPY WHEN PRINTED Page 6 of 10 Vegetation Management Plan Type B Consolidated – Off Site Works Rumex acetosella Rumex crispus Scabiosa atropurpurea Senecio pterophorus Sorrel Curled Dock Pincushion African Daisy Solanum nigrum Sonchus oleraceus Sparaxis bulbifera Ulex europaeus Black Nightshade Common Sow Thistle Sparaxis Gorse Vicia sativa Vulpia myuros Watsonia meriana cv. Bulbillifera Vetch Fescue Watsonia Spot spray Spot spray Spot spray Pull seedlings, cut and swab larger plants Spot spray Spot spray Spot spray Spot spray / Cut and swab Spot spray Spot spray Spot spray 8. RELOCATION OF TREE HOLLOWS n/a 9. FENCING / SIGNAGE PLAN Y Y Y Y Y Y Y Y N N N Y Y Y Y Y Y Y Y Y N N Y Y Y Y Y Y Y Y N N Y Fencing will be required to most of the northern boundary of the road reserve, to exclude grazing animals. The southern boundary of the road reserve is continuously fenced. A number of gates may be required in this southern fence if access through the property to the south is negotiated. Sections of existing fence crossing the road reserve at the boundaries of adjoining properties should be removed once construction of the northern boundary fence is completed. 10. MANAGEMENT (establishment and maintenance period) Following planting and initial weed control and bushcare, the site will be maintained by intensive control of weeds around plants, intensive bushcare follow-up to remnant vegetation patches and selective weed control to the balance of the area as detailed above. No watering is planned for the plantings, but will be provided in the case of prolonged or extreme drought conditions. Tree guards will be removed from plants after approximately 12 months, depending on species, growth and the threat of grazing by kangaroos and rabbits. This threat is expected to be variable in different parts of the corridor. Maintenance will continue until handover to Alexandrina Council at the end of June 2009. 11. CONTRACTOR REQUIREMENTS Revegetation / Bushcare Contractor Fencing Contractor 12. APPROVALS REGISTER (File Copy) Approved by: DTEI Project Manager………………………………………………………………. Refer also to VMP cost estimate approval, attachment 2 Signed………………………………………………………………………………… Date…………………………………………………………………………………… Landowner/Project Partner 1………………………………………………………. Name/Position ………………………………………………………………………. Date…………………………………………………………………………………… Reference (letter of agreement)…………………………………………………… Landowner/Project Partner 2……………………………………………………… Name/Position………………………………………………………………………. Date………………………………………………………………………………….. Reference (letter of agreement)…………………………………………………... Native Vegetation Council…………………………………………………………. Decision Number Reference………………………………………………………. Name/Position………………………………………………………………………. Date………………………………………………………………………………….. K-Net Doc: Version No.: Issue Date: Doc. Owner: 1669763 1 03/12/2007 Principal Environment Officer UNCONTROLLED COPY WHEN PRINTED Page 7 of 10 Vegetation Management Plan Type B Consolidated – Off Site Works Attachment 1: SKETCH CONCEPT / LOCATION PLAN Insert suitable format file/drawing into word document if applicable, or text such as 'see attached A3 sheets/ see attached…. file' if attaching hard copy or large file size plans. Ensure file size is manageable and plan shows context and appropriate level of detail to summarise work areas (requirements to suit project partners and approvals). If GIS file is used, use 'ARC INFO' format. Attachment 2: VEGETATION MANAGEMENT PLAN COST ESTIMATE (includes Specialist Services Costs) (DPTI TSD internal use only) Project Name: PATCHS No: Project Manager: (funding source) 1. File No: Landscape Manager: (senior project officer) Contract Cost Estimate Financial Years insert financial years (generally minimum 3 financial years from initial works) Item 'Year 0' Qty Unit Rate $ Total $ 2.814 ha 6000 16884 1688 1857 20429 3000 3735 0.892 X 2 ops 3000 2.814 x 2 ops 3000 plant lin m ha/op 1.00 5.00 1500 3000 18675 2676 plant 0.50 1500 ha/op plant 2000 4.50 11256 13500 3000 X 3 ops 3000 3000 plant/ op plant plant 0.50 4500 1.00 0.50 3000 1500 59607 5961 6557 72125 0.892 X 2 ops 2.814 x 2 ops 3000 x 3 ops 3000 PC sum ha/op 1500 2676 ha/op plant 1500 0.50 8442 4500 plant item 1.00 2000 3000 2000 2005/06 (June 06 only) Bushcare/weed control in remnant vegetation areas, initial control (Zone A) Contingency 10% GST SUBTOTAL 2005/06 'Year 1' 2006/07 Plant supply (tubestock/cells) Fencing northern boundary 3.735 km inc approx 4 gates Selective weed control (Zone C less Zone B = 0.892ha) (2 operations) Pre-planting weed control (3000 x 2m diameter+selected weeds) (Zone B) Bushcare/weed control in remnant areas, follow-up (2 operations) (Zone A) Planting including fit tree guard, supply and fit 600mm sq jute mat and stake , water-in Post planting weed control (3000 x 2m diameter+selected weeds) (3 operations) Pest and disease control Remove tree guards Subtotal Contingency 10% GST SUBTOTAL 2006/07 'Year 2' 2007/08 Selective weed control (Zone C less Zone B = 0.892ha) (2 operations) Bushcare/weed control in remnant areas, follow-up (2 operations) (Zone A) Post planting weed control (3000 x 2m diameter) (3 operations) Pest and disease control Plant replacement Subtotal Contingency 10% GST SUBTOTAL 2007/08 'Year 3' 2008/09 Selective weed control (Zone C less Zone B = 0.892ha) (2 operations) K-Net Doc: Version No.: Issue Date: Doc. Owner: 1669763 1 03/12/2007 Principal Environment Officer 20618 2062 2268 24948 0.892 X 2 ops ha/op 1500 2676 UNCONTROLLED COPY WHEN PRINTED Page 8 of 10 Vegetation Management Plan Type B Consolidated – Off Site Works Bushcare/weed control in remnant areas, follow-up (2 operations) (Zone A) Post planting weed control (3000 x 2m diameter) (2 operations) Pest and disease control Plant replacement 2.814 x 2 ops 3000 x 2 ops 3000 PC sum ha/op plant 1500 0.50 8442 3000 plant 1.00 3000 item 1000 1000 Subtotal Contingency 10% GST SUBTOTAL 2008/09 18118 1812 1993 21923 CONTRACT COST ESTIMATE TOTAL (includes GST and 10% contingency) 2. $139425 $ Specialist Services - Design and Management Fees Estimate (by Financial Year) Financial Year 05/06 06/07 07/08 08/09 Services to be Provided ($85/hr) Planning, internal liaison, design consultation, concept, native veg and council approval. Plant and seed orders, tender documentation, tendering, meetings and assessment, construction surveillance and contract administration. Establishment contract management and admin. Maintenance operations management, monitoring Maintenance operations management, monitoring, handover Specialist Services FEES TOTAL Hours Cost $ 120 10200 80 40 40 6800 3400 3400 $23800 $ TOTAL VMP COST ESTIMATE (Financial Years2005/06 - 2008/09) $163225 Financial Year Summaries (includes contingencies, GST on contracts and Specialist Services costs) 2005/06 $ 30629 (GST = $1857) 2006/07 $78925 (GST = $6557) 2007/08 $28348 (GST = $2268) 2008/09 $25323 (GST = $1993) PROJECT MANAGER / CLIENT ENDORSEMENT Proposal and estimate accepted ................................................................... Project Manager/Client Date............................... (Return endorsed copy to project landscape manager, Specialist Services) K-Net Doc: Version No.: Issue Date: Doc. Owner: 1669763 1 03/12/2007 Principal Environment Officer UNCONTROLLED COPY WHEN PRINTED Page 9 of 10 Vegetation Management Plan Type B Consolidated – Off Site Works Attachment 3: SEB CALCULATION Refer to SEB Guidelines for Calculation Method KNet#2306746 K-Net Doc: Version No.: Issue Date: Doc. Owner: 1669763 1 03/12/2007 Principal Environment Officer UNCONTROLLED COPY WHEN PRINTED Page 10 of 10