Transport Services Division ENVIRONMENT Operational Procedures & Forms Vegetation Management Plan Type A – On Site Works for (PROJECT NAME) Road Name: Road Number: VMP Knet File ID: VMD No: PATCHS No: File No: CONTENTS 1. PROJECT SUMMARY 2. PROJECT and SITE DATA 3. PROJECT REQUIREMENTS and OBJECTIVES 4. PROJECT WORKS SUMMARY 5. PLANTING (includes plant schedule) 6. DIRECT SEEDING (includes seed schedule) 7. BUSHCARE and WEED CONTROL (includes schedule) 8. RELOCATION OF TREE HOLLOWS 9. SITE FENCING / SIGNAGE PLAN 10. MANAGEMENT (establishment and maintenance period) 11. CONTRACTOR REQUIREMENTS 12. APPROVALS REGISTER Attachment 1: SKETCH CONCEPT / LOCATION PLAN Attachment 2: VMP COST ESTIMATE ( includes Specialist Services Costs) (DTEI - TSD internal use only - not for external release) K-Net Doc: Version No.: Issue Date: Doc. Owner: 1669838 1 03/12/2007 Principal Environment Officer UNCONTROLLED COPY WHEN PRINTED Page 1 of 9 Vegetation Management Plan Type A On Site Works 1. PROJECT SUMMARY 2. PROJECT and SITE DATA Project Name: Road Name: Road Number: VMP Knet File ID: VMD No: PATCHS No: File No: Vegrem Ref No: NVC Decision No: NVC Decision Date: Vegetation Clearance Area: NVAct SEB offset debit area : Remediation - Total Site Area: SEB Offset Credit Area: ha ha (describe - xx ha tubestock revegetation, yy ha bushcare/weed control) Site Location Description: (describe location and existing conditions) Site Location Coordinates (Latitude Longitude /WGS 84 Zone 5X / GDA94 MGA Zone 5X. NB: Zone will be either 52, 53 or 54): (N-S-E-W) end, (describe): (N-S-E-W) end, (describe): E E DTEI TSD Region: N N Council: Other Stakeholders: Remediation Project Manager: VMP Approval Requirements: VMP Author: Project Manager Landowner Native Vegetation Council or delegate 3. PROJECT REQUIREMENTS and OBJECTIVES 3.1 Project Requirements - Summary Offset remediation to achieve the required SEB credit area of xxxxx ha to compensate for the removal of (vegetation area, tree numbers, vegetation types and condition) 3.2 Project Objectives Remediation of (area in ha) at (location) to achieve a significant environmental benefit by (revegetation with - main species/association…bushcare - protecting………, controlling weed species……..) K-Net Doc: Version No.: Issue Date: Doc. Owner: 1669838 1 03/12/2007 Principal Environment Officer UNCONTROLLED COPY WHEN PRINTED Page 2 of 9 Vegetation Management Plan Type A On Site Works Performance Benchmark Data: (see performance benchmarks guideline) Site Conditions: Climate Zone: Tubestock Survival Rate Benchmark : (% Survival) After 1 year: xx% After 3 years: xx % After 5 years: xx % Direct Seeding Establishment Rates Benchmark: (% Cover) After 1 year: Some germination and seedling survival After 3 years: xx % cover After 5 years: xx % cover Table of Objectives with percentage component of works (weight ) 1. % component of works ( weight ) REVEGETATION 1.a. Establish the basic floristic structure of the site association(s) with the main tree and shrub species, and ground layer to the degree appropriate to the site conditions 1.b. Establish the pioneer or dominant / main structural species of the site association(s) 1.c. Establish the structure of site-specific habitat or amenity planting, or buffer zone to adjacent intact vegetation or Bushcare area, with selected species 1.d. Stabilise disturbed areas, drains, batters, etc with selected species 2. BUSHCARE 2.a. Eradicate all weeds from Bushcare areas - basic construction and establishment contract period (12 - 15 months) 2.b. Eradicate targeted weeds from Bushcare areas - basic construction and establishment contract period (12 - 15 months) 2.c. Eradicate all weeds from Bushcare areas - extended period (2 - 5 years generally) 2.d. Control / substantially reduce infestation of invasive / targeted weeds from Bushcare areas 3. WEED CONTROL 3.a. Eradicate selected proclaimed and environmental weeds on site 3.b. Control / remove woody weeds from the site or selected areas in the vicinity 3.c. Control weed infestations which threaten revegetation or Bushcare works areas 3.d. Control weed infestations which threaten adjacent intact or high quality vegetation 4. OTHER (describe) 4.a. Control rabbits in the vicinity of the Bushcare and revegetation sites in association with landholders and the APCB K-Net Doc: Version No.: Issue Date: Doc. Owner: 1669838 1 03/12/2007 Principal Environment Officer UNCONTROLLED COPY WHEN PRINTED Page 3 of 9 Vegetation Management Plan Type A On Site Works 4. PROJECT WORKS SUMMARY (example) Planting : Planting of xxxxxxxxx plants of selected local species as per the schedule below in tubestock or large cells, during xxxxxx Plants will be supplied by xxxxx using local seed/ cutting material sources. It is not intended to water the plants after planting and watering in (if necessary) due to the high rainfall and cool climate of the area and the generally deep sandy soils / Plants will be watered over the first (and second?) summers to ensure adequate establishment rates. Regular effective weed control to the plantings will be carried out to eliminate competition for moisture and nutrients. Weed Control : Weed control will be intensive amongst the remaining remnant vegetation in the corridor, but using low impact bushcare techniques. Weed control in planting areas will focus on complete control around plants and selective control of invasive species for the balance of the area. Other common pasture species control will be carried out around plants and in the remnant bushcare areas but not in the balance of the corridor as this is not considered sustainable in the context of the surrounding dominance of these species in pasture areas. TOTAL PROPOSED REMEDIATION AREA : xxxxxx ha 5. PLANTING Planting Due: Arrange Seed Supply By: Tree Guards: Seed Sources: Finalise Plant Orders By: Stakes: for guards Mulch Mats: Plant Schedule (tubestock unless otherwise shown) Species Number TOTAL K-Net Doc: Version No.: Issue Date: Doc. Owner: 1669838 1 03/12/2007 Principal Environment Officer UNCONTROLLED COPY WHEN PRINTED Page 4 of 9 Vegetation Management Plan Type A On Site Works 6. DIRECT SEEDING (describe area, species, method) 7. BUSHCARE and WEED CONTROL (describe area, species, method) Weed Schedule - observed weeds to be controlled (control of additional species may be required) Species Common Name Control Methods Control Requirements Y = yes, N = no Bushcare / Remnant Zone A K-Net Doc: Version No.: Issue Date: Doc. Owner: 1669838 1 03/12/2007 Principal Environment Officer Planting Zone B Selective Weed Control Zone C UNCONTROLLED COPY WHEN PRINTED Page 5 of 9 Vegetation Management Plan Type A On Site Works 8. RELOCATION OF TREE HOLLOWS (if required, describe extent, methods and resources required and new locations) 9. FENCING / SIGNAGE PLAN (if required, describe extent, type and use - exclude stock, kangaroos, rabbits, humans, vehicles - include access gates) 10. MANAGEMENT (establishment and maintenance period) Following ( planting and initial weed control and bushcare ), the site will be maintained by (describe actions weeds, watering, etc) Tree guards will be removed………………., depending on species, growth and the threat of grazing by kangaroos and rabbits. This threat is expected to be variable in different parts of the corridor. Maintenance will continue until……. handover to………. Council at the end of June 20xx. 11. CONTRACTOR REQUIREMENTS Revegetation / Bushcare Contractor Fencing Contractor 12. APPROVALS REGISTER Approved by: DPTI Project Manager………………………………………………………………. Signed………………………………………………………………………………… Date…………………………………………………………………………………… Landowner/Project Partner 1………………………………………………………. Name/Position ………………………………………………………………………. Date………………………………………………………………………………….. Landowner/Project Partner 2……………………………………………………… Name/Position………………………………………………………………………. Date………………………………………………………………………………….. Native Vegetation Council…………………………………………………………. Decision Number Reference………………………………………………………. Name/Position………………………………………………………………………. Date………………………………………………………………………………….. Attachment 1: SKETCH CONCEPT / LOCATION PLAN See attached A3 sheets Attachment 2: K-Net Doc: Version No.: Issue Date: Doc. Owner: 1669838 1 03/12/2007 Principal Environment Officer UNCONTROLLED COPY WHEN PRINTED Page 6 of 9 Vegetation Management Plan Type A On Site Works VEGETATION MANAGEMENT PLAN COST ESTIMATE (includes Specialist Services Costs) (TSD internal use only - not for external release) Project Name: Road Name: PATCHS No: Project Manager: 1. Road Number: 4760 File No: Landscape Manager: Contract Cost Estimate Financial Years 05/06, 06/07, 07/08, 08/09 Item Qty Unit Rate $ Total $ 'Year 0' 2005/06 (June 06 only) Bushcare/weed control in remnant vegetation areas, initial control (Zone A) Contingency 10% GST SUBTOTAL 2005/06 'Year 1' 2006/07 Plant supply (tubestock/cells) Fencing northern boundary 3.735 km inc approx 4 gates Selective weed control (Zone C less Zone B = 0.892ha) (2 operations) Pre-planting weed control (3000 x 2m diameter+selected weeds) (Zone B) Bushcare/weed control in remnant areas, follow-up (2 operations) (Zone A) Planting including fit tree guard, supply and fit 600mm sq jute mat and stake , water-in Post planting weed control (3000 x 2m diameter+selected weeds) (3 operations) Pest and disease control Remove tree guards Subtotal Contingency 10% GST SUBTOTAL 2006/07 'Year 2' 2007/08 Selective weed control (Zone C less Zone B = 0.892ha) (2 operations) Bushcare/weed control in remnant areas, follow-up (2 operations) (Zone A) Post planting weed control (3000 x 2m diameter) (3 operations) Pest and disease control Plant replacement Subtotal Contingency 10% GST SUBTOTAL 2007/08 'Year 3' 2008/09 Selective weed control (Zone C less Zone B = 0.892ha) (2 operations) Bushcare/weed control in remnant areas, follow-up (2 operations) (Zone A) Post planting weed control (3000 x 2m diameter) (2 operations) Pest and disease control Plant replacement Subtotal Contingency 10% GST SUBTOTAL 2008/09 CONTRACT COST ESTIMATE TOTAL (includes GST and 10% contingency) K-Net Doc: Version No.: Issue Date: Doc. Owner: 1669838 1 03/12/2007 Principal Environment Officer $ UNCONTROLLED COPY WHEN PRINTED Page 7 of 9 Vegetation Management Plan Type A On Site Works 2. Specialist Services - Design and Management Fees Estimate (by Financial Year) (example) Financial Year 05/06 06/07 07/08 08/09 Services to be Provided ($85/hr) Hours Cost $ Planning, internal liaison, design consultation, concept, native veg and council approval. Plant and seed orders, tender documentation, tendering, meetings and assessment, construction surveillance and contract administration. Establishment contract management and admin. Maintenance operations management, monitoring Maintenance operations management, monitoring, handover Specialist Services FEES TOTAL $ TOTAL VMP COST ESTIMATE (Financial Years2005/06 - 2008/09) $xxxxxxx Financial Year Summaries (includes contingencies, GST on contracts and Specialist Services costs) 2005/06 $xxxxx (GST = $xxx) 2006/07 $xxxxx (GST = $ xxx) 2007/08 $ xxxxx (GST = $ xxx) 2008/09 $ xxxxx (GST = $ xxx) PROJECT MANAGER / CLIENT ENDORSEMENT Proposal and cost estimate accepted ................................................................... Project Manager/Client Date............................... (Return endorsed copy to Project Landscape Manager, Specialist Services) K-Net Doc: Version No.: Issue Date: Doc. Owner: 1669838 1 03/12/2007 Principal Environment Officer UNCONTROLLED COPY WHEN PRINTED Page 8 of 9 Vegetation Management Plan Type A On Site Works Attachment 3: SEB CALCULATION Refer to SEB Guidelines for Calculation Method KNet#2306746 K-Net Doc: Version No.: Issue Date: Doc. Owner: 1669838 1 03/12/2007 Principal Environment Officer UNCONTROLLED COPY WHEN PRINTED Page 9 of 9