PROFESSIONAL SERVICES CURRENT PROJECTS Updated November 13, 2015 RFP # Project Selected Firm(s) Comments 15-08 Full Architectural Ser vices for Inn at Darden Renovation Inter views January 27, 2015 15-06 Full Architectural Ser vices Ter m Contracts for Healthcare, Science & Technology Inter views Februar y 3 -4, 2015 15-05 Full Architectural Ser vices Ter m Contracts for Academics Inter views December 9, 2015 15-03 Full Engineering Ser vices Term Contracts Inter views November 20, 2015 15-02 Ener gy & Utili ties CHP & Low Temp Study Inter views December 11, 2015 15-01 MEP Engineering Ser vices term Contracts (1) 2rw Consultants (2) Whitman Requardt Associates (3) Global Engi neering Solutions 14-09 Electrical Ductbank In stallation Dewberr y Engineers 14-08 Outpatient Procedure Center Renovation Hord Coplan Macht 14-07 Structural Engineering Term Con tracts Inter views March 19 , 2015 14-06 Gooch Dillard Renovations Phase II VMDO 14-05 Building Envelope Term Contracts (1) Gale Associates (2) Si mpson Gumpert z & Heger (3) Whitlock, Dalr ymple, Poston 14-04 Materials Testing & Inspections Term Contracts (1) Froehling & Robertson (2) ECS 14-03 Library System Planni ng Study Cannon Desi gn 14-02 Historic Preser vation Term Contracts (1) John G. Waite (2) Mesick Cohen (3) Qui nn Evans 14-01 Darden School Concept Desi gn Moore Ruble Yudell 13-06 Emer gency Depart ment/Operating Rooms/ Inpatient Bed Expansi on Perkins + Will 13-05 Hospital 7 t h & 8 t h Floors Renovation HKS 13-04 Transportation Engineering Ter m Contr acts (1) Kimley-Horn (2) V anasse Hangen Brustli n 13-03 Hospital Vegetated Roof Retrofit Roof Meadow 13-02 Hospital Medical Planning Ser vices Jones Lang LaSalle 13-01 Darden Conference Center Cancelled 12-14 McCor mick Road Houses Renovat ions Clark Nexse n 12-13 Rotunda Renovations Phases II – IV John G. Waite Associates 12-12 Newcomb Road Chiller Plant Upgr ade Affiliated Engineers 12-10 Fralin Art Museum Bayl y Building Addition Frederick Fisher Architects 12-09 Ener gy & Utilities Mast er Plan Affiliated Engineers 12-08 North Grounds Boiler & Chiller Plant Hga, Inc. 12-07 Cultural Landscape Report for the Academical Village Heritage Landscapes 12-06 Health System Educational Resource Center CO Architects with Train & Partner Architects 12-05 Alder man Residence #6 EYP, Inc. 12-04 Programmi ng & Planni ng T erm Contract(s) (1) Brightspot Strategy (2) RMA Desi gn Studio (3) Sasaki (4) Venturi Scott Brown Associates 12-03 Fire Protection Ter m Contract(s ) (1) Hughes Associates (2) Protection Engineering Group 12-02 Full Architectural Ser vices for Health System & Research Ter m Contract(s) (1) Basker vil (2) HKS (3) Nalls (4) Per kins & Will 12-01 Health System Enginee ring Ter m Contract(s) (1) Leach Wallace (2) RMF (3) Valley Engineering 11-08 UH HVAC Replacement Leach Wallace 11-07 Indoor Practice Facility – Fieldhouse VMDO 11-06 Commissioning Ter m Contract(s) (1) Facility Dynami cs (2) MBP (3) Burns & McDonnell 11-04 Full Landscape Archit ecture Term Contrac ts (1) AECOM (2) Biohabitats (3) Rhodeside & Harwell (4) Sitewor ks 11-03 Full A/E Ser vices Term Contracts (1) BAM Architects (2) Bowie Gridley (3) Heyward Boyd (4) Train & Partners 11-02 CAW Health & Wellness Center Train & Partners 11-01 Cost Consulting, Scheduling & Value (1)CCI (2) Burns & McDonnell (3) Faithful & Gould 10-03 Full Engineering Ser vices Term Contracts (1) Dewberr y & Davis (2) Draper Aden Associates (3) Hurd & Obenchain (4) Ross Infrastructur e 10-02 Aquatic & Fitness Center HVAC Renovation 2rw Consultants 10-01 Track & Field Stadium at Lanni gan Field VMDO 09-14 Chiller Plant Perfor mance Term Contracts (1) WM Group (2) Trefz Engineering 09-13 UH Emer gency Department Renovation Hell muth, Obata + Kassabaum 09-12 UH HVAC Replacement Canceled 09-11 UH Emer gency Power Phas e III Canceled 09-10 Structural Engineer ing Ser vices Ter m Contracts (Parking Garage Evaluations) (1) DESMAN Associat es (2) Whitlock Dalr ymple Poston 09-09 Ruffner Hall Renovati ons McKinney & Company 09-08 Building Envelope Peer Review & Consulting Engineering Ser vices (1) Si mpson, Gumpert z, Elstner (2) Whitlock Dalr ymple Poston (3)Wiss Janney Elstner 09-07 Newcomb Hall Renovations Cole & Denny 09-06 Construction Materials Testing & Inspection Ser vices Ter m Contracts (1) ECS Mid-Atlantic (2) Froehling & Robertson (3) Schnabel 09-05 College at Wise New Library Cannon Desi gn 09-04 McCor mick Road Bridge Re placement Carol R. Johnson Associates Study Onl y 09-03 Historic Preser vation Term Contracts (1) Frazier Associates (2) John G. Waite Associ ates (3)John Milner Architects (4 ) Mesick Cohen Wilson Baker 09-02 Intramural -Recreational Sports Center Cannon Desi gn 09-01 SVHEC Clean Ener gy R&D Center Train & Partners Architects 08-10 MEP Engineering Ser vices Term Con tracts (1) Affiliated Engineers (2)SmithGroup (3) Virginia A&E 08-09 College at Wise Multi -Purpose Center VMDO Construction June 2009 08-08 UH Levels 1 & 2 Renovation Perkins East man & HKS Construction July 2009 08-07 Miller Center Expansi on Cooper Robertson Construction Date TBD 08-06 Alder man Road Housi ng Ayers/Saint/Gross Construction March 2009 08-05 New Cabell Hall Renovation Goody Clancy Construction On Hold 08-04 IT C Data Center Hypertect, Inc. Construction May 2009 08-03 Garrett Hall Renovation Architectural Resources Group Construction Fall 2009 08-02 Traffic & Engineering Term Contracts (1)Davis Langdon (2) ARUP USA, Inc. 08-01 AFC Chiller Plant Expansion Affiliated Engineers, Inc. Construction Dec. 2008 07-06 SEAS/CLAS Res earch & Applied Sci ences Bohlin Cywinski Jackson Construction Dec. 2008 07-05 Whitehead Road Impr ovements Michael Van Valkenburgh Study Onl y 07-04 Rugby Administrative Bu ilding Glave & Hol mes Construction Fall 2009 07-03 415 Ray C. Hunt Dri ve: 3 r d Floor Fit Out Hillier Group Architects Construction In Pr ocess 07-02 Old Jordan Hall HV AC Replacement RMF Engi neering Construction March 2010 07-01 Uni versity of Virginia Bookstore E xpansion Bowie Gridley Architects Construction end 2009 Construction December 2009