Quarterly Summary of Boiler, Pressure Vessel, Mechanical

advertisement
“See full details on the following pages”
District
Dist-1 D.
Homan
Dist-2 T.
Waldbillig
Dist-3
Damarc-S
Dist-4 J.
Wolf
Dist-5 J.
Markiewicz
Dist-6
Duane
Leetch
Dist-7 D.
Yourchuck
09-09 District Comparisons of Objects and Overdues
Boilers &PV
Mechanical
Ammonia
Total / Overdue/
Refrigeration
Storage
%
Total /Overdue Total / Overdue/
Increase or
/%
%
Decrease from
Increase or
Increase or
previous Month
Decrease from Decrease from
previous
previous Month
Month
2373-T
278 - T
7- T
13 - O
1- O
0- O
0.5 %
0.4 %
0%
Decrease
Decrease
No Change
1.5 %
2.4%
0%
2419– T
349– T
21 –T
19- O
3- O
0-O
0.8%
.9%
0%
Decrease
Decrease
No Change
.5%
.2%
6330 –T
927 – T
Do not conduct
149 – O
12 –O
2.4%
1.3 %
Decrease
Decrease
1.4%
.8%
1924 – T
207–T
20 –T
56 – O
6- O
0 –O
2.9 %
2.9%
0%
Increase
Increase
No Change
.2%
2.0%
1536–T
68 –T
4-T
94 – O
0–O
0-O
6.1 %
Decrease
0%
Increase
3%
No Change
1.4%
732 – T
137 – T
19-T
12 –O
1-O
0-O
1.6 %
.7 %
0%
Decrease
No change
No Change
2.2 %
1030-T
203-T
25-T
1-O
0-O
0-O
.1%
No change
0%
Decrease
No Change
.5%
**Winners for this Quarter are as follows:
Open Gas &
Anhydrous
Ammonia
System Plans
3–open plans
1-open plan
N/A
4-open plans
5-open plan
7-open plans
2-open plans
Boiler and Pressure Vessels: Duane Leetch wins the percentage decrease of (2.2% decrease),
with David Homan on his heels of (1.5 decrease) Incredible! Dean wins the least amount of
over dues
Mechanical Refrigeration: James Markiewicz wins the percentage decreases of 3.0%., and the
overall best is on overdues is James and Dean!
Ammonia Storage Facilities: Everyone is a winner with no overdues. Great Job All!
Gas Systems - Open Plans = Total (22) All State Inspectors
This page is a total breakdown of all objects related to Service
agents, State Contractor and State District Inspectors
1-year Boilers =2,933
3-year Boilers =37,197
3-year Pressure Vessels =19,765
Total = 59,895 objects (Increase of 159 Objects) .27% Increase
Boiler-Pressure Vessel Breakdown of Objects and Overdues
1.
2.
Service Agents and City of Milwaukee assigned objects = 43,551 (total overdue objects 1038)
2.4% No Change
State Inspectors-State Contractor (Damarc) assigned objects 16,344 (Total overdue 344)
2.1% (Decrease of .8 %)!!!
3.
Total overdue percentage of all Boilers and Pressure Vessels (1382) =
2.3%
4.
Decrease of .2% from last quarter
Mechanical Refrigeration Systems
1-year Refrigeration systems = 385
3-year Refrigeration systems = 1990
Total = 2375 (Increase of 28 Systems, 1.2% Increase from last
Quarter)
1.
State Inspectors, Contractor (Damarc) and City of Milwaukee assigned objects =2375 (Total
overdue 32) 1.3% (Decrease of .3%)
2.
City of Milwaukee assigned objects = 183 (Total overdue 9) 5 % Decrease .3%
3. Total overdue percentage of Mechanical Refrigeration Systems (32) =
1.3% (Decrease of 1%)
Ammonia Storage Facilities, excluding number of nurse tanks
3-year Inspections = 101, Increased 2 storage facilities (2% Increase from last quarter)
1. All Ammonia Storage facilities are inspected by the State Inspectors = 101 ( 2-of
the 101 are under construction)
2. Total overdue percentage of Ammonia Storage = 0%
Conclusion:








State Inspectors/ Contractor (Damarc) are also assigned inspections of High Pressure
Piping, Mechanical Refrigeration and Gas System process piping inspections- (Not
Damarc). Approx. 80-100 per District
State Inspectors also Conduct National Board R-stamp Audits (1-1/2 day process) We
conduct about a average of 28-32 audit reviews per year
State Inspectors also have Inspections of “New” Liquid Propane Gas systems
installations, approx. 50-60 per year throughout the state.
State Inspectors are also assigned audits to review inspections preformed by Service
Agents, State Contractor, and City of Milwaukee. Approx. 30-45 per year, spread out
through the districts
The percentage of over dues of Boilers and Pressure vessels are at 2.5% this quarter,
last quarter we were at 2.3%. Overall, we are striving to be less then 2.0% by next
quarter, we are getting there.
Total overdue percentage of Mechanical Refrigeration Systems (32) = 1.3%
(Decrease of 1%)
Total overdue percentage of Ammonia Storage = 0%
Overall, State Inspectors, State Contractor, City of Milwaukee and Service Agents are
doing a tremendous job in maintaining the overdues to a minimum.