SWP-6 UV light box

advertisement
OHS026
1. Completed by: GT Keenan
Safe work procedure
Staff/Student number:
Z8403130
The Writing Safe Work Procedures Guideline (OHS027) should be consulted to assist in the completion of this form
Faculty/Division:
School/Unit:
Science
Physics –Protein Lab G10-OMB
Document number
Initial Issue date
Protein SWP-6
30-11-2012
Current version
Current Version
Issue date
Next review date
28-11-2016
2.Safe work procedure title and basic description of activity
UV light box
3.List Hazards and risk controls as per risk assessment
Associated risk
assessment
number and
location:
Hazards
See RM-6
Controls
See RM-6
4.List resources required including personal protective clothing, chemicals and equipment needed
Curtain , normal lab PPE , UV safety glasses, UV face mask
5.List step by step instructions or order for undertaking the task
 See RM-6
 Training- Do not use the light box unless you have the knowledge required to do so safely. If in doubt, seek
advice from Gary Keenan and or Paul Curmi or others trained in the use of these machines.
 Users should read and understand the User manuals for these units and always follow these user manual
instructions and never attempt to override the existing safety controls.
 Wear normally required lab PPE
 Wear UV face mask
 Before turning on the unit visually check that the plug and cable are in good condition and the unit is PAT.



When using the unit warn any others in the lab that you are about to use the UV lightbox . Close the curtain (or door)
Turn on the unit .
When finished working turn off the UV light box and inform others in the lab that the UV light box is turned off.

.
6.List emergency shutdown procedures
Power off electrical equipment – Use wall mounted RCD switches (located around the lab)
Turn off natural gas supply use emergency Gas off switch near front door.
_______________________________________________________________________________________________________________
Page 1 of 3
OHS026 safe work procedure
Current Version: 3.0, 04/03/2011
7.List Emergency procedures for how to deal with fires, spills or exposure to hazardous substances
Fire: Cover the fire with a fire blanket if it can be fully contained underneath the blanket otherwise use a fire extinguisher.
Carbon dioxide or dry powder is suitable.
Turn off natural gas at the emergency switch.
Be prepared for re ignition, especially if equipment is involved: do not leave the scene unless fumes or smoke become
hazardous.
Spill: see spills procedures SWP 90,91,92
Exposure: remove contaminated protective clothing and examine your clothes for contamination which may have
soaked through. If day clothing is contaminated, remove, and wash skin under running water immediately for 15 minutes
or until medical attention arrives.
In EMERGENCY get under safety shower and turn it on.
If Oxygen depletion alarm sounds leave lab immediately from outside laboratory ring 56666 do not enter
laboratory if alarm is sounding.
8.List Clean up and waste disposal requirements
Any broken glass must go into the broken glass waste. For spills use the correct spill kit if required .Dispose of
chemical waste and biohazard waste by the proper method.
9.List legislation used in the development of this SWP
10a.List competency required – qualifications, certificates, licensing, training - e.g. course or instruction:
Training in the laboratory and signing and understanding the RM and SWP forms
Desirable UNSW laboratory safety awareness , hazardous substances and ionizing radiation safety.
.
10b. List competency of Assessor
BSc and 30 years experience
11.Supervisory approval, And review
Supervisor:
Prof. Paul Curmi
Signature:
Responsibility for SWP review:
Date of review:
12.SWP Sign off sheet
SWP name and version:
In signing this section the assessor/ authorisor agrees that the following persons are competent in following this
SWP
Name
Signature
Date
Competent
Name of Assessor/Authoriser
Assessor/Authoriser
signature
_______________________________________________________________________________________________________________
Page 2 of 3
OHS026 safe work procedure
Current Version: 3.0, 04/03/2011
_______________________________________________________________________________________________________________
Page 3 of 3
OHS026 safe work procedure
Current Version: 3.0, 04/03/2011