Good Practice Guide No. 03: Slips, Trips and Falls (STF) - Planning of Scrap Management This good practice guide is for those responsible for the planning and actioning of scrap and waste management during work activities. Reviewed: October 2013 Version: 02 Safety Improvement initiatives Page 1 of 8 Next Review: Oct 2014 www.safety.networkrail.co.uk Slips, Trips and Falls (STF) - Planning of Scrap Management Good Practice Guide 1. Introduction 2. Purpose 3. Scope 4. Definitions 5. Further Information 6. Contacts 7. Guidance 8. Appendix 1 – Planners Guidance for Scrap Removal Note: This good practice guide is intended to be used merely as an aid to understanding. Use of this good practice guide does not release those using its material from their obligations to comply with the relevant legislation and other mandated or recommended processes or standards. At the time of this guide being produced, the author made all reasonable effort to validate the accuracy of the information referenced. Photographs are provided for reference purposes only. Reviewed: October 2013 Version: 02 Safety Improvement initiatives Page 2 of 8 Next Review: Oct 2014 www.safety.networkrail.co.uk Slips, Trips and Falls (STF) - Planning of Scrap Management Good Practice Guide Introduction 1. Current industry figures report that approximately 50% of accidents are a result of a slip trip or fall. There are similar levels in non rail industries. The Project Safety Leadership Group (PSLG) commissioned a Safety Improvement Team (SIT) project to review the underlying causes of the above statistic. One of the identified principal issues was that of inadequate scrap and waste management during the execution of work activities. On-site trials, in conjunction with various Network Rail Supplier Organisations, were conducted to identify good practice in this field. 2. Purpose This Good Practice Guide (GPG) provides guidance and information in relation to scrap and waste management relevant to the management of slip, trip and fall events. 3. Scope This GPG is for the consideration of Network Rail staff and suppliers who access the Network Rail managed infrastructure. 4. Definitions Slips, trips and falls – For the purposes of this document Slips, trips & falls that occur on the same level. This includes falls when entering / leaving vehicles, either road or rail and falls on access routes. It specifically excludes falls associated with working at height (e.g. from scaffolding). Management of scrap – For the purposes of this document The planning of work content and the identification of resources to manage scrap and waste materials during work activities. 5. Further Information Further information and documentation supporting this Good Practice Guide can be found as detailed below and on www.safety.networkrail.co.uk Toolbox Talks Key Point Cards The Slips, Trips and Falls Project Report 6. Contacts For further information on this ‘Good Practice Guide’ please refer to contact details below: Mark Tingay – Safety Improvement Specialist (IP - SNE) mark.tingay@networkrail.co.uk Reviewed: October 2013 Version: 02 Safety Improvement initiatives Page 3 of 8 Next Review: Oct 2014 www.safety.networkrail.co.uk Slips, Trips and Falls (STF) - Planning of Scrap Management Good Practice Guide 7. Guidance on Planning Introduction This process identifies a methodology to raise the profile of scrap and waste materials management within the planning and delivery of works. The following issues were identified during the project: Line-side scrap was a problem the quality of scrap and waste management is variable the management of scrap and waste is considered to be a relatively low priority activity Unmanaged scrap and waste material can be a significant contributor to slip, trip and fall events. Scope It is not the intention of this process to relate directly to the ultimate removal of scrap and waste from a work location, or indeed the appropriate storage of scrap and waste on site as per various waste management regulations. This Good Practice Guide relates to the timely planning and management of scrap and waste in relation to minimisation of slip, trip and fall events prior to and during the execution of works. Objectives The objective of this process is: To promote the inclusion of scrap and waste management in planning of the works The identification of resources and time required to achieve the management of scrap and waste during work activities To assist in the assignment of ownership of the planning and management of scrap and waste during work activities – a suggested simple RACI chart is included To support a positive attitude to manage scrap and waste during the execution of the works rather than at the end In conjunction with associated Tool Box Talks, Key Point Cards, etc. to raise the awareness of the importance of scrap and waste management Process During the planning stage and possibly in conjunction with site visit and meetings, the planner should identify the type of scrap and waste that will be produced during the works and identify the real time management of waste. Consideration should be given to a number of factors which are suggested below. Available at the end of the GPG is a proforma assisting in these considerations. Reviewed: October 2013 Version: 02 Safety Improvement initiatives Page 4 of 8 Next Review: Oct 2014 www.safety.networkrail.co.uk Slips, Trips and Falls (STF) - Planning of Scrap Management Good Practice Guide RACI Chart RACI charts can be used in the identification of activities and posts involved in the execution of these activities. The use of a RACI chart can assist in the planning management and monitoring of real time scrap and waste control during work activities. Example of a RACI Chart Project Manager Project Planner Construction Management Site Management Site Operatives Other 1 Other 2 Arrange site visit Undertake site visit and Identify scrap / waste onsite prior to work commencing Removal of existing scrap Identify work expected to generate scrap / waste Manage generated scrap / waste during works Provide feed back on site scrap / waste process RACI Roles: R – Responsible, A – Accountable, C – Consult, I – Inform (Note: Identify against the activities who has the specific RACI Roles) Factors for consideration in the planning of scrap and waste management during works. Identify scrap and waste on site prior to work commencing: o Consider volume, weight, size, machinery requirements Is the waste hazardous: o Potentially containing asbestos o Hypodermic syringes or needles o Oils o Paint and other chemicals o Batteries PPE requirements Who is responsible for removal - assign responsibilities Who is responsible for informing the organisation responsible for removal Access availability / restrictions Machinery / handling requirements Transportation requirements Trespass and Vandalism issues – e.g. opportunities for placing waste on the track Reviewed: October 2013 Version: 02 Safety Improvement initiatives Page 5 of 8 Next Review: Oct 2014 www.safety.networkrail.co.uk Slips, Trips and Falls (STF) - Planning of Scrap Management Good Practice Guide Where will scrap be positioned prior to its removal? During the progression of the work it may be impracticable to remove scrap or waste items as they occur immediately to their final destination. What are the arrangements adjacent to the activity that will be required to reduce the formation of a STF hazard pending its removal? How will machine/train movements effect the positioning of scrap/waste expected? Machine and train movements can have an affect on the storage arrangements for scrap and waste and allowances should be made. Also consider the impact of vehicle movements on personnel. Prior to its removal how will scrap be identified to staff as a potential STF hazard? Having identified a particular location for immediate scrap and waste storage what precautions may be needed to highlight the location to site personnel? Is there a need to: o Demarcate the area by fencing o Highlight the waste by any specific method o Provide any specific lighting requirements How much scrap/waste is expected? Consider, for example: o Quantities involved o Type o Location where it is created o What time during the works programme o Potential storage locations o Movement / handling requirements o Assignment of responsibilities Can it be safety removed during the works (as opposed to the end of shift/works?) Consider: o Interfaces with other operations o Movement / handling requirements Effect on access routes Consider: o Are access route constant through the works? o Will they change during the works? o Pedestrian access requirements o Plant access requirements Trespass and Vandalism issues o Is the location a high railway crime area (the Route RSIM organisation will be able to advise on this) o Consider opportunities for placing waste on the track Reviewed: October 2013 Version: 02 Safety Improvement initiatives Page 6 of 8 Next Review: Oct 2014 www.safety.networkrail.co.uk Slips, Trips and Falls (STF) - Planning of Scrap Management Good Practice Guide 8. Appendix 1 - Planners Guidance for Scrap Removal Location Date Works ref Type of works Name Ref Consideration to be applied to the following 1 Existing scrap on site. How is it to be removed? Refer to RACI Chart 2 Prior to scrap removal from site, how will it be identified to staff as potential STF hazard? Who will identify arrangements? Who will manage these arrangements? 3 Prior to ultimate removal from site, where will scrap be positioned? Who will identify arrangements? Who will manage these arrangements? 4 How will any machine/train movement’s effect positioning of scrap in relation to walking routes, authorised or otherwise? Who will identify arrangements? Who will manage these arrangements? 5 What type of scrap/waste is expected? Who will identify this waste on site? Who will manage this waste on site? 6 How much scrap/waste is expected? Who will manage this waste on site? 7 When is it expected? Who will manage this on site? Reviewed: October 2013 Version: 02 Safety Improvement initiatives Comment (Identify Responsible Persons) Page 7 of 8 Next Review: Oct 2014 www.safety.networkrail.co.uk Slips, Trips and Falls (STF) - Planning of Scrap Management Good Practice Guide 8 How will it be removed? Who will manage this on site? 9 When will it be removed? Who will manage this on site? 10 Who will remove it? Who will manage this on site? 11 Where will scrap be removed to, (interim or final removal)? Who will manage this on site? 12 Can it be safety removed during the works (as opposed to the end of shift/works)? Who will manage this on site? 13 Will scrap created effect walking routes for staff and how? Who manages this? 14 Is the location associated with a high level of railway crime (T&V) Reviewed: October 2013 Version: 02 Safety Improvement initiatives Page 8 of 8 Next Review: Oct 2014 www.safety.networkrail.co.uk Slips, Trips and Falls (STF) - Planning of Scrap Management