Comment (justification for change) by the Voting Member
Proposed change by the Voting
Member
Comment Resolution
Charpy
Values
Technical
The 25 ft-lb for 9 Ni steel is very low. Suggest you poll
owners for what they specify and increase the
specified Cv values.
Appendix Q
Technical
I've sent Doug Miller and Gordon a Word file with
Track Changes to show my comments. The API ballot
form doesn't lend itself well to my comments.
Appendix Q
Editorial
wii send my comments to Gordon and Doug
Appendix Q
Editorial
wii send my comments to Gordon and Doug
numerous
Technical
1)
TGB Partnership
(Negative)
Sheng-Chi Wu
Bechtel Corp
(Affirmative)
Sheng-Chi Wu
Bechtel Corp
(Affirmative)
Sheng-Chi Wu
Section Q.1.3:
Bechtel Corp
(Affirmative)
The design temperatures are revised to "-155 F to -320
F".
Check if we need to provide the referenced API
standard for design temperature from -60 F to -155 F.
(Note: In the original API 620, App Q is applied to -60
F to -273 F and App R for +40 F to -60 F).
2)
In Section Q.2.2.1, "9% or 5% Nickel steel
shall be impact tested in accordance with Q.2.2.2
through Q.2.2.4, and Section Q6.2.
3)
In Section Q.3.2, suggest to keep
the original text, since the text is considered as a
general statement, and good reference.
page 1 of 5
API electronic balloting template/version April 2003
API Ballot Comments and Resolution
Ballot: RTTG Review of Appendix Q
1
Voter Name
(Vote)
Proposal:
Ballot ID:
1126
Date: February 18, 2016
2
3
4
5
6
Clause No./
Subclause
No./Annex
(e.g. 3.1)
Type of
Comment
Comment (justification for change) by the Voting Member
Proposed change by the Voting
Member
Comment Resolution
4)
In Section Q.4, suggest not to delete this
section, but referred back to API RT Section 6.xx.
5)
In Section Q.5.2, suggest to add "API RT
Section 6.x.x" as reference for design load
combinations.
6)
Section Q.10.
a)
Add "API RT Section 6" as a reference for
foundation design.
b)
Add brief description of pile-supported
foundation in the Section, since App C is referred to
design consideration of soil-supported foundation, and
also most of the LNG tanks are designed to be pilesupported.
Larry Hiner
Q.1.1
Technical
Chicago Bridge &
Iron
Company(CB&I)
(Affirmative)
Shouldn't we allow other liquids? "Add such" as before
ethane, ethylene, and methane.
It would be helpful to refer speically to "diagrams of
containment configurations" in API 625.
Change RT to API 625.
Q.1.1 GENERAL
The provisions in this appendix
form a guide for the materials,
design, and fabrication of tanks
to be used for the storage of
liquefied gas such as ethane,
ethylene, and methane.
This appendix together with the
basic sections of API 620 provide
requirements for the materials,
design, and fabrication of the
metallic portions of a cryogenic
page 2 of 5
API electronic balloting template/version April 2003
API Ballot Comments and Resolution
Ballot: RTTG Review of Appendix Q
1
Voter Name
(Vote)
Proposal:
Ballot ID:
1126
Date: February 18, 2016
2
3
4
5
6
Clause No./
Subclause
No./Annex
(e.g. 3.1)
Type of
Comment
Comment (justification for change) by the Voting Member
Proposed change by the Voting
Member
Comment Resolution
refrigerated tank system.
Requirements ( including
diagrams of containment
configurations) for the complete
tank system, of which the metallic
components are a part, are found
in API 625.
Larry Hiner
Q.5.2
Technical
Chicago Bridge &
Iron
Company(CB&I)
(Affirmative)
Larry Hiner
Q.5.2 COMBINATION OF DESIGN LOADS. Factored
load combinations should providing similar to those
passed for publication in the main section of API 620.
Loading combinations should also include "seismic,
dead load," and the roof "live" loading
Q.7.4.1
Technical
Q.7.6.7
Technical
Chicago Bridge &
Iron
Company(CB&I)
For consistancy with other section replace "primary
and secondary liquid containers" with just "liquid
containers"
Q.7.4.1 In liquid containers, all
opening connections 12 in. or
larger in nominal - - -
(Affirmative)
Larry Hiner
Chicago Bridge &
Iron
Company(CB&I)
ASME B96.1 is no longer an active Standard. Refer to
API 650 Appendix AL – this will probably be released
in API 650 11th Edition addendum 1 by issue date of
API 625
(Affirmative)
Q.7.6.7 For aluminum tanks,
radiography shall be judged
according to the requirements of
API 650 Appendix AL.
Add comma after tanks
Larry Hiner
Q.9 & Q.9.1
Editorial
Q.9 Terms purge gas container and a warm gas
container are both being used in Q.9 and Q.9.1 It
appears the paragrapghs would apply to both
configurations.
Technical
moved to correct voter
Chicago Bridge &
Iron
Company(CB&I)
(Affirmative)
Steven Wu
page 3 of 5
API electronic balloting template/version April 2003
API Ballot Comments and Resolution
Ballot: RTTG Review of Appendix Q
1
Voter Name
(Vote)
Proposal:
Ballot ID:
1126
Date: February 18, 2016
2
3
4
5
6
Clause No./
Subclause
No./Annex
(e.g. 3.1)
Type of
Comment
Comment (justification for change) by the Voting Member
Proposed change by the Voting
Member
Comment Resolution
Exxon Corporation
(YetToVote)
Jiping Qiu
ExxonMobil Corp.
Table Q-1,
Note6;
Q.3.2.
Technical
Table Q-1, Note 6: B 619 does not apply to pipe
welded with filler metal.
(Affirmative)
Q.3.2.: "Design metal temperature of each component
exposed to the liquid or vapor being stored shall be the
lower of the temperatures specified as follows:
a.
The design metal temperature of the
components of the single-wall tank or the inner tank of
a double-wall tank shall be the minimum temperature
to which the tank contents shall be refrigerated,
including the effect of subcolony at reduced pressure.
Table Q-1, Note 6: Delete
"Further, for this pipe over 8"
diameter, the addition of filler
metal is permitted".
Q.3.2. DESIGN METAL
TEMPERATURE: Drop the text
above in Q.3.2. DESIGN METAL
TEMPERATURE, or alternatively,
this text may be moved to API
"RT" section 6 (Design
Considerations).
b.
The design metal temperature of the
secondary components shall be the lower of the
minimum atmospheric temperature conditions (see
4.2.1) and the vaporized liquefied gas temperature, if
the components are in contact with the vapor. The
effectiveness of the insulation in keeping the metal
temperature above the minimum atmospheric or
refrigerated temperature shall be considered."
Richard Hoffmann
Technical
I have sent the revised document with my comments to
the author.
Technical
ASTM A20 13.2.2 allows to use the die stamp using
Hoffmann & Feige
(NonVoter)
Masaki Takahashi
Q7.11.2
page 4 of 5
API electronic balloting template/version April 2003
API Ballot Comments and Resolution
Ballot: RTTG Review of Appendix Q
1
Voter Name
(Vote)
Proposal:
Ballot ID:
1126
2
3
4
5
6
Clause No./
Subclause
No./Annex
(e.g. 3.1)
Type of
Comment
Comment (justification for change) by the Voting Member
Proposed change by the Voting
Member
Comment Resolution
IHI Inc.
low-stress impressions for plates 1/4" and under.
(Affirmative)
So I would suggest to eliminate the very last part of the
sentence, "however, 9% nickel.....".
David Nasab
KBR
(Affirmative)
Date: February 18, 2016
Q.1.,
Q1.3,Q.2,
Q2.1,Q
2.2.1, Q.6,
Q7.1.4,
Q7.12
Technical
1.RT is for Cryogenic storage tank.
2.Lowe limt temperature need to be revised because
ethylene product.
1. Should reead cryogenic
storagr tank not cryogenic
refrigerated tank.
3. Should read cryogenic products
2. -155 F should be revised to 150 F.
4. Q.2.1 part C Shoul be fixed roof,should change the
deck to suspended roof
3. Change to cryogenic product.
5.pu a wording in front of 9% or 5% nickle
4. Change to fixed roof and
suspended roof
6. refere to suspended roof
7. Revise part A
8. add words after avoided
5. Components made from 9% or
5% nickle steel
6. Change the wording to
suspended roof.
7. Delete located in
8. Excessive hammering should
be avoided on components of
Liquid container
Kah-Kan Chan
App Q
Technical
Comments will be emailed to Doug Miller.
Matrix Service,
Inc.
(Affirmative)
page 5 of 5
API electronic balloting template/version April 2003
Download