Witness of Buried Section Instrument Transformer Secondary Cables Please complete and sign this form for each facility. This form may be submitted by mail, courier or fax to the following: Mail this form to: Independent Electricity System Operator Attention: Wholesale Metering Station A, P.O. Box 4474 Toronto, ON M5W 4E5 Courier this form to: Independent Electricity System Operator Attention: Wholesale Metering 655 Bay Street, Suite 410 Toronto, ON M5G 2K4 Fax this form to: Independent Electricity System Operator Attention: Wholesale Metering Fax No.: (905) 855-8688 All information submitted in this process will be used by the IESO solely in support of its obligations under the "Electricity Act, 1998", the "Ontario Energy Board Act, 1998", the "Market Rules" and associated policies, standards and procedures and its licence. All submitted information will be assigned the appropriate confidentiality level upon receipt. Terms and acronyms used in this Form that are italicized have the meanings ascribed thereto in Chapter 11 of the “Market Rules”. PART 1 – GENERAL INFORMATION Metered Market Participant (MMP) MMP Name: MMP Contact: Telephone No.: Fax No.: E-mail Address: IMO-FORM-1509 v.2.0 REV-05-06 Confidential Page 1 of 3 Metering Service Provider (MSP) MSP Name: MSP ID No.: MSP Contact: Telephone No.: Fax No.: E-mail Address: Mailing Address: City/Town: Postal Code: Facility (Plant) Name and Address: Plant/Circuit Names: Meter Point ID #s: PART 2 – CABLE INFORMATION Secondary Cable Cable #’s Type Length of Section Buried [m] Current Transformer Voltage Transformer Page 2 of 3 Confidential IMO-FORM-1509 v.2.0 REV-05-06 PART 3 – DRAWINGS (PLEASE ATTACH) Plan (top) view showing buried conduits – Drawing Title and Number: Elevation (profile) cross section view showing buried conduits – Drawing Title and Number: PART 4 – REASON FOR BURIED INSTRUMENT TRANSFORMER CABLES PART 5 – WITNESS The undersigned witnessed the burial of the above-mentioned cables. The cables were installed in original condition as shown on the attached drawings: , and remained intact during the burial as shown on that drawing. The IT sources are wired directly from the IT's, then pass via directly to the metering cabinet. No other tapped connections have been made into these cables which carry the secondary current and voltage sources used for the wholesale revenue metering at the above mentioned facility. Registered P.Eng. (Print Name) P.Eng. Signature P.Eng. Stamp Date IMO-FORM-1509 v.2.0 REV-05-06 Confidential Page 3 of 3