2004 Construction Overview - Ohio Department of Transportation

advertisement
Calendar Year 2004
Ohio Department of Transportation District 10
Contracted Construction Projects
District 10 Regional Projects
District guard rail rebuilding
Rebuilding of guard rail as needed throughout the district
Cost: $493,410
Contractor: PDK Construction
Awarded: August 2003
Scheduled completion: June 2005
District 10 polyester pavement markings
Includes replacements on various routes/sections throughout the district.
To be awarded: May 2004
District 10 raised pavement markers (RPM)
Includes replacements on various routes/sections throughout the district.
To be awarded: April 2004
District 10 fast dry pavement markings
Includes the application of fast dry pavement markings on various routes/sections throughout the district.
To be awarded: June 2004
District 10 herbicidal spraying
Herbicidal spraying on various routes/sections in the district.
Cost: $76,343
Contractor: D-C Cunningham Group
Awarded: January 2004
Scheduled completion: July 2004
District 10 mowing
Mowing on various routes/sections in the district.
Cost: $119,178
Contractor: Tom Mayle and Sons
Awarded: January 2004
Scheduled completion: October 2005
District 10 sign replacement (Gal, Hoc, Meg, Moe, Nob, Was)
Replacement of signs on various routes/sections in the counties listed above.
Cost: $350,396
Contractor: PDK Construction
Awarded: August 2003
Scheduled completion: June 2004
Athens County
Athens to Darwin major new construction - Phase 1
Relocating US 33 route and building a Super II limited access highway between TR 68 just north of Shade and
the four-lane section at Darwin; includes Meigs County
Cost: $33.25 million
Contractor: Smith & Johnson
Awarded: June 2001
Scheduled completion: September 2004
Athens to Darwin major new construction - Phase 2
Relocation of US 33 continues from Shade to Athens; includes Meigs County
Cost: $39.75 million
Contractor: Smith & Johnson
Awarded: October 2001
Scheduled completion: September 2004
U.S. 50 – Four-lane resurfacing project
Work includes approximately 10 miles and begins at the Meigs County line.
Cost: $1.4 million
Contractor: Shelly & Sands
Awarded: November 2003
Scheduled completion: July 2004
State Route 124/681 – Culvert replacement, includes Meigs County
Work begins just west of TR161
Cost: $997,454
Contractor: Smith and Johnson Construction
Awarded: October 2003
Scheduled completion: June 2004
State Route 144 – Two-lane resurfacing
Work includes approximately 10 miles starting at State Route 144
Cost: $758,909
Contractor: Shelly Company
Awarded: July 2003
Scheduled completion: July 2004
State Route 682 – Culvert replacement
Work includes the replacement of twin box culverts located .11 miles south of the W. Chauncey corporation
limit.
Cost: $96,101
Contractor: Parker Corporation
Awarded: September 2003
Scheduled completion: June 2004
State Route 329 – Preventive maintenance, includes Morgan, Washington Counties
Preventive maintenance using a polymer seal coat application; begins just north of Amesville.
Cost: $357,773
Contractor: Lytle Construction, Inc.
Awarded: March 2004
Scheduled completion: July 2004
Gallia County
State Route 7 – Two-lane resurfacing
Work to begin .26 miles south of northeast corporation line of Gallipolis.
Cost: $1.1 million
Contractor: Shelly Company
Awarded: September 2003
Scheduled completion: June 2004
State Routes 7, 141, 160 – Culvert repair
Work includes three locations on routes listed above.
To be awarded: Late March 2004
State Route 218 – Bridge repair
Work located .04 miles north of CR112 (Lewis Road), and sections of State Routes 554 and 775.
Cost: $369,274
Contractor: Ratzlaff Construction
Awarded: September 2003
Scheduled completion: July 2004
State Route 325 – Culvert replacement
Work located north of Vinton.
To be awarded: April 2004
Hocking County
U.S. 33 – Four-lane resurfacing
Work includes 4.21 miles from the Fairfield County line east
Cost: $958,834
Contractor: Shelly Company
Awarded: October 2003
Scheduled completion: August 2004
State Route 78 – Culvert construction, includes Washington County
Culvert construction on various sections in Hocking and Washington County.
Cost: $201,217
Contractor: Parker Corporation
Awarded: October 2003
Scheduled completion: October 2004
Hocking Hills State Park – Bridge enhancement
Add stone facade to wingwalls and head wall of State Route 374 bridge within Hocking Hills State Park.
Cost: $308,099
Contractor: R.C. Construction
Awarded: December 2003
Scheduled completion: June 2004
County projects
Hocking County Road 118 – Bridge replacement
Replacement of two-span bridge over the Hocking River.
Cost: $1.1 million
Contractor: Maiden and Jenkins Construction
Awarded: December 2003
Scheduled completion: Determined by the county (LPA process)
Meigs County
U.S. 33 – Athens to Darwin major new construction - Phases 1 and 2
Refer to Athens County
U.S. 33 – Pomeroy-Mason Bridge replacement
Replacement of the Pomeroy-Mason Bridge with a cable-stayed structure.
Cost: $45.8 million
Contractor: Joint venture - C.J. Mahan Construction and National Engineering
Awarded: February 2003
Scheduled completion: September 2006
State Route 124/681 – Culvert replacement
Refer to Athens County
State Route 338 – Two-lane resurfacing
Work includes asphalt overlay, striping and berm conditioning of 7.2 miles beginning at State Route 124
To be awarded: Late March 2004
State Route 681 – Bridge repair
Bridge rehabilitation located just east of TR239 (Henderson Road)
To be awarded: May 2004
Meigs wetland (Rocksprings Road)
Create 3.5 acres of wetland and protect an additional 50 acres of woodland and wetland as mitigation for
Ravenswood Connector and Athens to Darwin projects.
Cost: $995,995
Contractor: Lubarg, Inc.
Awarded: April 2003
Scheduled completion: June 2004
Monroe County
State Route 379 – Preventive maintenance, includes Morgan and Noble Counties
Preventive maintenance using a polymer seal coat on various sections in listed counties.
Cost: $332,761
Contractor: Shelly & Sands
Awarded: January 2004
Scheduled completion: July 2004
Morgan County
State Route 37 – Major reconstruction
Two-lane reconstruction to improve geometrics located .2 miles west of State Route 78. Includes the rebuilding
of two intersections, repaving and minor signal work
Cost: $4.55 million
Contractor: Alan Stone Company
Awarded: February 2003
Scheduled completion: July 2004
State Route 60 – Two-lane resurfacing
Work includes 10 miles beginning at the Washington County line
Cost: $1.27 million
Contractor: Shelly & Sands
Awarded: February 2004
Scheduled completion: June 2004
State Routes 78 and 83 – Preventive maintenance
Refer to Monroe County, State Route 379
State Routes 329 and 555 – Preventive maintenance
Refer to Athens County, State Route 329
State Route 376 – Slide repair
Project located .5 miles north of CR 6 (Bebout Road)
To be awarded: April 2004
Noble County
I-77 – Bridge repair
Work located .5 miles north of the State Route 821 underpass; includes deck overlay of various Noble Co.
locations.
Cost: $425,399
Contractor: 5-D Construction
Awarded: January 2004
Scheduled completion: August 2004
State Route 83 – Preventive maintenance
Refer to Monroe County, State Route 379
State Route 83 – Bridge replacement
Bridge replacement over Rannells Creek tributary located .7 miles north of CR20 (Chapel Road).
To be awarded: April 2004
State Routes 260 and 340 – Two-lane resurfacing
Work includes approximately 8 miles of State Routes 260 and 340.
Cost: $979,280
Contractor: Shelly & Sands
Awarded: January 2004
Scheduled completion: July 2004
State Route 564 – Preventive maintenance
Approximately 9 miles of preventive maintenance using a polymer double seal coat beginning .05 miles west of
TR490 and ending .22 miles west of State Route 145.
Cost: $136,162
Contractor: Lytle Construction, Inc.
Awarded: February 2004
Scheduled completion: June 2004
Vinton County
Zaleski State Forest – Culvert replacement, resurfacing
Work includes placing limestone on eight different roads totaling 17.66 miles, replacing 56 culverts and placing
asphalt on one parking lot within Zaleski State Forest.
Cost: $352,994
Contractor: Parker Corporation
Awarded: January 2004
Scheduled completion: August 2004
Lake Hope State Park – New guard rail, pavement repair and berm reconstruction
Work begins at State Park entrance.
Cost: $38,321
Contractor: Parker Corporation
Awarded: March 2004
Scheduled completion: May 2004
U.S. 50 – Culvert replacement
Work located .5 miles west of CR7
Cost: 788,387
Contractor: DGM
Awarded: March 2004
Scheduled completion: October 2004
State Route 160 – Bridge replacement
Bridge replacement located .2 miles east of the east corporation limit of Hamden.
To be awarded: May 2004
State Route 278 – Bridge repair
Work located at the south corporation limit of Zaleski.
To be awarded: April 2004
Washington County
State Route 7 – Emergency slip repair
Repair of 1.5-mile section beginning just south of Marietta
Cost: To be determined
Contractor: Beaver Excavating Company
Awarded: January 2004
Project is approximately 75% completed. Total completion cannot be estimated at this time.
State Route 7 – Preventive maintenance
Four-lane resurfacing using mill and fill process beginning near TR720 and ending at the Virginia Street exit.
To be awarded: April 2004
State Route 26 – Preventive maintenance
Refer to Athens County, State Route 329
State Route 26 – Bridge replacement
Bridge replacement over Duck Creek tributary beginning .08 miles west of intersection of CR16.
To be awarded: April 2004
State Route 339 – Two-lane resurfacing
Project includes approximately 14 miles beginning at the intersection of State Route 618
Cost: $2.99 million
Contractor: Shelly & Sands
Awarded: December 2003
Scheduled completion: July 2004
State Route 339 – Bridge repair
Rehabilitation of deck on steel beam bridge over south fork of Wolf Creek
To be awarded: April 2004
District Office renovations
Renovations to headquarters include window replacement
To be awarded: April 2004
County projects
County Road 9 – Minor rehabilitation
Base pavement reconstruction and guard rail project
Schedule will be determined by Washington County Engineer.
City projects
Marietta bikeway
Construction of 10-ft wide shared use path in the city of Marietta.
To be awarded: April 2004
Marietta brick paving
Work starts at Sixth and Cutler Streets
To be awarded: April 2004
U.S. 50 (Belpre) – Signals
Work includes to installation of traffic signals at the intersection of Braun Road
To be awarded: April 2004
Civitan Park enhancement (Belpre)
Installation of lighting fixtures, benches, trash receptacles, paving of parking area; also expansion of walkway
facilities
To be awarded: May 2004