Lao - TSIG Consulting Inc

advertisement
TSIG Consulting, Inc.
Todd Jaime Lao
CAFM Development
Mr. Lao joined WASA/TSIG in 1999 in a full-time position after working in a part-time capacity since 1994.
Mr. Lao is now an integral part of TSIG Consulting, Inc. His responsibilities include management of field
survey and CAD documentation teams. He is also an expert in the Aperture CAFM and FIS CAFM software
in both integration and implementation. Mr. Lao is an expert in CAFM database design.
Representative projects include:
Academic
Johns Hopkins University, Baltimore, MD. Field Measurements of 56 buildings, approximately 3.4 Million
square feet on its Homewood campus, including electronic CAD documentation and database
development.
New York University Medical Center, New York, NY. CAD Measurements and CAD documentation. Verified
field measurements of two medical research laboratories for NYU Medical Center and integrated them
into an Archibus CAFM system.
Gateway Community College, New Haven, CT. CAD Measurements and CAD documentation of the
180,000 sq. ft. facility with full Aperture integration.
Housatonic Community College, Bridgeport, CT. CAD Measurements and CAD documentation of the
200,000 sq. ft. facility with full Aperture integration.
Health Care
Northern Westchester Medical Center, Mt. Kisco, NY. Field measured CAD documentation of 450,000
square feet with full Aperture systems development including Utilities, and JCAHO (Joint Commission
on Accreditation of Healthcare Organizations) deficiency drawings.
New York State Psychiatric Institute, New York, NY. CAD measurements and full Aperture systems
development including JCAHO deficiency drawings.
Calvary Hospital, Bronx, NY. Aperture System development with field surveyed drawings, and utility plans.
Bergen Pines Regional Medical Center, Paramus, NJ. Prepared Aperture drawings of for certification by
JCAHO.
Phelps Memorial Hospital, Sleepy Hollow, NY. Prepared firewall drawings in AutoCAD.
Government/Private
General Services Administration, White Plains, NY. Field measured CAD documentation of the 150,000 sq.
ft. facility, with full FIS systems integration.
United Nations Development Programme, New York, NY. Field survey of 15,000 assets including computer
equipment and furniture. Integration of this information into UNDP Aperture CAFM system.
Syracuse Central School District, Syracuse, NY. Field measured CAD documentation of 48 schools totaling
4.5 Million square feet with full Aperture systems development.
Merrill Lynch, New York, NY. Developed polylines to BOMA standards for over 10 Million square feet with
full Facility Center systems development and implementation.
The Bexar County Courthouse, San Antonio, TX. Verified drawings for deficiency tracking system
developed in Aperture.
Brooklyn General Post Office, Brooklyn, NY. Performed field measurements to support a historical
renovation project.
Marsh & McLennan Companies, Inc., New York, NY. Trained facilities personnel to use Aperture software.
Developed space charge back and departmental utilization floor plans in Aperture.
TSIG Consulting, Inc.
Todd Jaime Lao
CAFM Development
Skills and Qualifications
Work: model making, photography, web design, and drawing
Software Experience: Aperture V. 6.0, Aperture V. 7.0, AutoCAD 14.0, AutoCAD 2000i, Archibus, Alias
Wavefront, FIS, Facility Center, Net Objects Fusion, Photoshop 5.0, Photoshop 6.0, and QuarkXpress;
Microsoft Windows 95, 98, NT; Word, Excel, Access, Internet Explorer; Netscape, HTML.
Education: Columbia University, New York, NY. Bachelor of Arts, Architecture 1999
Download