Application Form for Financial Assistance for Renewable Energy Projects PFC Green Energy Ltd (A Wholly owned subsidiary of PFC Ltd) INSTRUCTIONS & EXPLANATORY NOTES 1. Promoter means any entity/group contributing atleast 20% of the equity. 2. Furnish brief detail of industry, for captive or co-generation plant. 3. Give full particulars, wherever asked, of the arrangements already made with copies of supporting document. 4. The cost of the project must be as per the Annexure supported with break-up of equipment/packages and other works. The basis of cost such as actual procurement/ awarded (with dates) or estimated must be brought out clearly. 5. Provide basis of (calculation of) physical benefits. 6. Provide basis of assumptions made for calculation of Financial Rate of Return (FIRR). 7. Furnish details of environmental issues and major mitigations recommended, implemented and planned. 8. All amounts must be expressed in ` unless defined otherwise and technical quantities must be given with appropriate units where ever not defined. 9. It may be noted that details furnished in this form must tally with the details provided in the Project/Feasibility Report. Any deviation must be supplemented with proper explanation. 10. Ensure that the checklist has been complied with, any additional documents must be listed therein. 11. At the time of application the promoter/applicant company should normally have achieved the following mile stones; a. Letter/MoU with Govt. b. Registration of the Company. c. Identification of equity and its contributors. d. PPA (Signed/Agreed Draft) e. Fuel linkage (In case of Biomass Project) Applications (alongwith annexures) submitted will be property of PFC GEL and would be retained. PFC GEL reserves the right to reject the loan application without assigning any reason whatsoever. Checklist of Documents (To be submitted in triplicate) Sl No Particulars Whether Annexed Yes No (If yes, Annexure No) General 1.1. Information Memorandum by the Lead FI 2.2. Sanction Letter of the Lead FI Entity 1. Brief introduction of the Promoters Brief introduction of Management Expertise of the Applicant as 2. well those of the Promoters and Sister, Group & Associate Concerns 3. Completed KYC Forms of the Applicant and Promoters Certified true copy of Memorandum & Articles Association, 4. Certificate of Incorporation and Certificate of Change of Name (if any) 5. Certified true copy of Certificate of Commencement of Business 6. List of Directors alongwith DIN Certified true copy of Board Resolution Authorizing investment 7. in the project/SPV Certified true copy of Board Resolution Authorizing borrowing 8. for the project/SPV Letter authorising dealing officer(s) & their attested specimen 9. signatures List of Sister, Group & Associate Concerns Concerns certified by 10. the Company Secretary/Statutory Auditors and brief introduction thereof 11. Annual Reports of last 3 years Particulars of existing debentures and secured loans certified by 12. Statutory Auditors 13. Shareholding pattern certified by Company Secretary Note on equity infusion plans covering means of equity such as 14. fresh capital infusions, existing resources, internal accruals, etc. Income Tax, Wealth Tax and Sales Tax Returns of the Applicant 15. and Promoters, for the last 3 FY (wherever applicable) 16. Networth declared by individuals by Chartered Accountant Certificate of Satisfactory Operation of account(s) from the 17. existing Bankers/Fls 18. Authority letter to the Lenders to provide information to PFCGEL Certificate from the Statutory Auditors showing DSCR Calculation 19. as per latest audited accounts No Current default Certificate from the Statutory Auditors w.r.t. 20. the Company and its Promoters, Sister, Group & Associate Concerns Rating Report including Rationale both for the Company and for 21. raising debt 22. Copy of Quality Certifications, if any Promoters' experience in land acquisition, in obtaining 23. environmental clearances, regulatory approvals 1 Loan Application Form (PFC GEL) Jan 14 Documents emanating from Government supporting equity 24. commitment for the project and note on nature of support (cash or kind), arrangements for phasing Project 1. Pre-feasibility Report 2. Executive Summary, Scope and Layout of the scheme Details of projects executed/managed by the promoters 3. (including sector, project size-physical and funds outlay) 4. Details of promoters’ prior experience in power sector Brief introduction of the Applicable Scheme, tariff order of respective SERC, Project, Technology (including proposed 5. indigenisation of imported technology) and Technology Partners (Consultants, Manufacturers, EPC & O&M Contractors), Power Purchaser(s) etc.) Letter of Intent/MoU/Implementation Agreement/Approval 6. from the concerned Authority/Agency Comparative analysis for various options considered for selection of proposed technology/equipment/supplier in terms of the 7. least cost/availability and characteristics of fuel/Water availability/environmental/standalone basis/incentives available /other (please specify) etc. 8. Detailed Project Report (DPR) Sale/Lease Deed of Land including the land use change 9. certificate, clearances/NOC from govt bodies required for acquiring land for setting up of power project at the site. No Objection Certificate (NOC) from State Electricity Board or 10. any other Authority 11. Environment Impact Assessment Report 12. Forest Clearance 13. Consent to Establish 14. Consent to Operate Write-up on R&R plan indicating village affected, to the extent 15. of, families affected and resolution 16. Bore well Permission 17. Aviation Clearance from AAI/Ministry of Defence 18. Site map & Micro-siting report Loss Diagram at various stages and system design detail (Details 19. and source to be mentioned) 20. Power Purchase Agreement with the Discom/SEB/3rd Party Last 3 Annual Reports of 3rd Party Purchaser, wherever 21. applicable 22. Fuel Purchase Agreement 23. EPC Contract 24. O&M Contract 25. Transmission/Wheeling Agreement 26. Transmission Connectivity Diagram Copies of Electricity Bills for last 12 month (in case of captive 27. use) 28. Note on Procurement justifying selection of particular supplier 29. Detailed Quotation Evaluation Report 2 Loan Application Form (PFC GEL) Jan 14 30. 31. Detailed technical specification for equipments (to be) procured Copies of Purchase Orders and Invoices Copies of Invoices alongwith the Money Receipts from the 32. suppliers 33. Projected financials, if the same are not annexed with the DPR Performance Guarantee from Equipment 34. Manufacturers/Suppliers/System Integrator 35. Synchronization Certificate 36. Commissioning Certificate 37. JMRs and Billings since Completion 38. Bank Statement reflecting realizations since Completion Loan Account Statements and NOC (No Objection Certificate) 39. form all lenders, in case of refinancing 40. CDM Registration Certificate Calculation of expected revenue from sale of CERs for the life 41. time of the project Technology specific Checklist Solar PV 1. Solar PV policy of the respective authority 2. Solar PV tariff policy of the respective authority Module Configuration with details of mounting arrangements, 3. tilt angle, tracking arrangements 4. Module Technical Specification 5. PCU Technical Specification 6. Solar Radiation/Temperature data/Wind Data 7. Simulation Data 8. IEC Certificates of Modules and inverters Solar Thermal 1. Solar Thermal policy of the respective authority 2. Solar Thermal tariff policy of the respective authority System Configuration with details of mounting arrangements, tilt 3. angle, tracking arrangements 4. Receiver-Collector/Steam Generator’s Technical Specification 5. Heat Transfer Fluid’s Specification 6. Storage Compound’s Specification 7. Turbine Generator’s Specification 8. Solar Radiation/Temperature data/Wind Data 9. Site Data, if any 10. Simulation Data 11. IEC Certificates for the Receiver-Collectors Wind 1.1. Wind Assessment Report 2.2. C-WET certificate for WTGs Small Hydro 1. Topo-sheet and also map showing catchment area 2.1. Hydrology Report 3.2. Clearance from Department of Fisheries/Irragation Biomass 1. Fuel Availibility and Price Study Report 3 Loan Application Form (PFC GEL) Jan 14 1. Name of the Scheme : 2. Project Company (Applicant) : 3. PAN : 4. Applicant Category : Private Ltd/ Public Ltd/ Joint Sector/ Central PSU/ State PSU/ State Electricity Board/ Municipal Bodies/Cooperatives/NBFC/Others (Please specify) 5. Whether Medium Enterprise (as per MSMED Act) 6. Project Type : 7. Technology : Small Hydro/Wind/Bio-mass/Solar PV/Solar Thermal/other (please specify) 8. Capacity : 9. Existing Capacity, if any : 10. Project Cost (` Crore) : 11. Loan sought (` Crore) : 12. Financing sought : Term Loan/Guarantee/Leasing/Supplier’s Credit 13. Financing arrangement sought : Financial Assistance in consortium Financial Assistance in consortium with syndication Financial Assistance in consortium with underwriting 14. Lead FI : 15. Status of the Applicant Company : Existing/New/SPV 16. Incorporated on : 17. Business Commenced on : : New/Expansion/Modification/Diversification 18. Line of business of the Applicant/Promoter : 19. Group to which the Company belongs 1 : Loan Application Form (PFC GEL) Jan 14 20. Communication Particulars of the Applicant: Communication Particulars Coordinator/ Authorized Person Designation Mobile Direct No EPABX Fax Email Building Street Locality Village/Town/City Tehsil Sub Division District State PIN Website 2 Communication Address Registered Address Loan Application Form (PFC GEL) Site Address Jan 14 Entity Informations 1. Shareholding Details A. Authorised Capital : B. Paid-up Capital : C. Share Application Money : Current Shareholding Sl Net Promoter Shareholders Constitution Amount No Worth (Y/N) (` Lakhs) 1. 2. 3. 4. 5. % of total Share Capital Proposed Shareholding Amount (` Lakhs) % of total Share Capital 2. Directors of the Applicant Name Age Nationality DIN Promoter/ Promoter’s Family/ Promoter’s Nominee Designation (Functional/ Professional/ Independent) Qualification Experience 3. Board Resolutions: Sl No Clause Resolution No Passed on a) to undertake the project b) to borrow u/s 149(2) in case of Limited companies and Board resolution in case of Pvt Limited Companies 4. Brief Financials: ` Lakhs Current FY L-2 Year L-1 Year Last FY (till last (Audited) (Audited) (Audited) quarter) Equity Reserve and Surplus Net Worth Sales 3 Loan Application Form (PFC GEL) Jan 14 Entity Informations Turnover PBDT Net Profit Loan (Term Loan) Fixed Asset Dividend (%) Debt-Equity Ratio Capital Employed Credit rating from CRISIL/CARE/ICRA Any qualifying remarks by Auditors in the Annual Report regarding litigation/ contingent liabilities pending with Statutory Authorities Whether the applicant has given any guarantee for the loans raised by other companies/others and if so, provide details thereof. Major legal cases against the company which may have impact on financial position of the applicant Any qualifying remarks by Auditors in the Annual Report regarding litigation/ contingent liabilities in respect where disputes with Statutory Authorities/Regulators/Income Tax Department/Govt Agencies/Suppliers and other creditors are pending Whether any provision has been made to meet the contingent liabilities Financials of the applicant in case of Balance Sheet Financing/Standalone Co If newly formed Co/SPV, details of parent Co may be provided, if parent Co is investment Co, then that of 1st immediate parent engaged in physical business 5. Statutory Compliances: Income Tax Assessment Taxable Promoters Income Tax Income Assessed/Paid Assessed Wealth Tax Assessment Wealth Assessed Wealth Tax Assessed/Paid Sales Tax Assessment(*) Sales Tax Assessed Sales Tax Assessed/paid 6. Capital Market Information: Stock Exchange(s) Face Value Current Market Price Quote Date 52 week high 52 week low Latest Market Cap 7. Sister, Group & Associate Concerns: 8. Projects set up/being implemented by the Company: Sl No Project Details and Location Commissioned on Capacity Generation Loan availed from Amount 4 Loan Application Form (PFC GEL) Jan 14 Entity Informations 1. 2. 9. Bankers to the Applicant Sl No Bank Branch Address Telephone Fax Email 1. 2. 10. Facilities already sanctioned A. By PFC/PFC-GEL to the Applicant: Sl No 1. 2. 3. Project Name Year of sanction PFC Loan Disbursed Amount Repaid Amount B. By PFC/PFC GEL to the Sister, Group & Associate Companies: Sl No 1. 2. 3. Project Name Year of sanction PFC Loan Disbursed Amount Repaid Amount C. By Other Banks/FIs to the Applicant: Lender Facilities RoI Sanction Date Loan Amount Tenure Outstanding Security Repayment Status D. Whether the Applicant Company or any of the Promoters and Sister, Group & Associate Concerns are in Default? If yes, details thereof E. Legal proceedings/Court cases, if any, pending against the Applicant or any of the Promoters and Sister, Group & Associate Concerns If yes, details thereof 5 Loan Application Form (PFC GEL) Jan 14 Project Details 1. Summary of the Project : Village Taluka District State Height above Mean Sea Level A. Accessibility to proposed location of the Project Particulars Nearest Road Head Nearest Railway Station Nearest Airport Nearest water source Nearest Grid/Substation Name Distance from Project Site (km) B. Details of proposed Project Land Particular Area Whether acquired (Likely date of acquiring in case it is to acquired) Whether Mortgageable Revenue Land Pvt Land Forest Land* Total *In case land not mortgageable, enclose letter from concerned Govt. Authority confirming the same 2. Power scenario in State/Region based on latest Survey Deficit in Peak Load Existing (at the end of last FY) Anticipated in future (by the end of 12th Plan) Deficit in Energy Availability State Region 3. Renewable Purchase Obligation (%): Percentage Obligation not Obligation of Obligation fulfilled met by the the Obligated by the Obligated Obligated Entities Entities Entities Last FY Current FY Anticipated in future (by the end of 12th Plan) 4. Procurement Procedure: Tendering/Published/RFQ Procedure/Limited Tender/Single Quotation 5. Consultants/Agencies appointed Power Off-take advisor 6 Loan Application Form (PFC GEL) Jan 14 Project Details Technology Consultants DPR Preparation Owner's Engineer 6. Project Implementation Execution by self/EPC contractor EPC (to be) awarded on Period of Completion Date of start Date of re-start with reasons for hold-up. Indicate whether the EPC contractor, is also the equipment manufacturer? Packages Packages identified Equipment & Services Service Contracts Construction Contracts O&M Agency Order Placed For EPC Contractor/Supplier/Self/Others (please specify) 7. Project Implementation Schedule Date of Order for Main Package (Equipments) Date of Start of Civil Works Date of Completion Date of Commercial Operation 8. Procurement Status: Sl No Item/Package Procurement Method Status/Date of Award Supplier (with Address) Value Delivery Date 9. Brief Cost Estimates Particulars Total Amount (` Lakhs) Preliminary & Pre-operative expenses Registration & Frontend fee including SNA fees Land, R&R & Site Development Engineering & Consultancy Civil Works EPC/Plant & Machinery Evacuation Facilities 7 Loan Application Form (PFC GEL) Jan 14 Project Details Charges payable to Discom/SNA/SEB Contingency Working Capital Margin Project Cost IDC Total Project Cost 10. Proposed Overall Promoters' Contribution Plan Sl No Promoter Type of Promoter* Project Equity Share Capital ` Lakhs % (considering face value) Aggregate Promoters' Contribution ` Lakhs % (considering aggregate contribution including share premium, if any) 1. 2. 3. Total 100% 100% *Specify whether the respective Promoter is a company, corporate group, state/central government department, public sector undertaking, bank, financial institution, infrastructure finance company, private equity/venture capital fund, infrastructure fund, NBFC, individual or other. 11. Expenditure Incurred (till date): A. Phasing of Expenditure (` Crores) Year from start 1st (201 -201 ) 2nd (201 -201 ) 3rd (201 -201 ) Equity Loan from PFC GEL Other Loans 12. Proposed Means of Financing Particulars Amount (` Lakhs) A) Promoter’s contribution Equity Share Capital Internal Accruals Unsecured Loan from Promoters, friends, relatives & their associates Others, if any – specify Sub Total (A) B) Term Loan Proposed From PFC GEL/PFC From Others (FI/Bank) Subordinated Debt from *Subsidy, if any Sub Total (B) Total Project Cost (A+B) 8 Loan Application Form (PFC GEL) Jan 14 Project Details * Capital subsidy if available will reduce PFC GEL/PFC’s loan A. Phasing and means of equity infusion Brought in by the end of Last FY Year +1 Year +2 Year +3 Year +... Equity committed for the project through Internal Accruals through Existing resources through issue of share capital to: Promoters IPO/FPO Others institutions Borrowings Others… 13. Realization expected from sale of energy: Captive Consumption Off-grid/ Decentralised Distribution Sale under PPA Merchant Sale (Long Term) Merchant Sale (Open Access) Capacity (MW) Generation (MU) Tariff Rate/Minimum Guaranteed Rate (`/Unit)* Trading Margin* Rate of Escalation of Tariff In case PPA is yet to be executed, information may be provided based on the approved policy In case of 3rd Party Sale: Name of the Buyer: Last FY LFY-1 LFY-2 Net Sales Operating Expenses Operating Profit Exceptional Items PBT Tax PAT Depreciation Cash Profit 14. Status of commissioning A. : Commissioned/Under Execution/Proposed Commissioning Date : 15. Monitoring and Data Logging Instruments installed : 9 Loan Application Form (PFC GEL) Jan 14 Project Details 16. Forward and Backward Linkages : Achieved Constraint, if any Likely date for achieving Fuel linkage, if applicable Water availability Construction Power Power evacuation Ash disposal Effluents disposal Transportation (Rail/Road) facilities 17. Power Evacuation a) b) c) d) e) f) g) h) i) j) k) l) Generation Voltage Nearest Substation Distance from the substation Voltage, Frequency and Capacity of the substation Power factor at the bus Metering point and metering arrangement To be achieved on Grid adequacy for evacuation & synchronization of project Whether energy banking facility available Wheeling Charge Open access charge, if applicable Details for Power Evacuation Arrangements : : : : : : : : : Yes/No : : : 18. Physical benefits: Process Steam Utilization, if any Additional Generation Reliability (specify the areas) Social Economical Environmental (waste disposal method) Others (please specify) : : : : : : : 19. Performance Indicators (i) (ii) (iii) (iv) (v) (vi) Cost of Generation (`/Kwh) Levellised CoG over life of the project Project IRR (%) Financial IRR (%) DSCR (Average) DSCR (Minimum) : : : : : : Assumptions Installed Capacity (MW) Life PLF/CUF 10 Loan Application Form (PFC GEL) : : : Jan 14 Project Details Exchange Rate : Depreciation Methods and Rates : Discount Rate : Rate of Interest for proposed loan from PFC-GEL : Working Capital Rate of Interest : Repayment Period : Moratorium Period : Selling Price (as per SERC approved & signed Power Purchase Agreement) : Annual escalation in Selling Price : Transmission/Wheeling Charges if applicable : Annual O&M Charges* : Annual escalation of O&M Charges : Insurance Premium : Fuel Cost : Any other (please specify) : *If SCADA is provided, please specify whether it is part of contract (O&M) or exclusive/shared for the project and included in project cost 20. Securities Offered a) b) c) d) e) f) Bank Guarantee from a scheduled bank State/Central Government Guarantee Corporate Guarantee of Promoter/Group/Sister/Associate Concern(s) Personal Guarantee of Promoters and/or promoter directors Pledge of shares Equitable Mortgage (Mortgage by deposit of title deeds) of all the immovable properties; hypothecation of all movable assets, both existing and future, g) Deposit of post-dated cheques in accordance with repayment schedule of principal loan amount and interest. 21. Indicate Incentives and subsidies (Applicable under Govt. Policy): Description Incentive/Subsidies (`) Period Grants (if any) Capital Subsidy (MNRE) Capital Subsidy (others) Tariff as per PPA Generation Based Incentive Exemption from Sales Tax/Excise Duty/Customs Duty Concessional Excise Duty/Customs Duty Exemption from Electricity Generation Duty/Taxes Wheeling & Transmission Facility Accelerated Depreciation Tax Holiday Others (please specify) 22. CDM Expected annual CERs Expected annual revenue from sale of CERs 11 Loan Application Form (PFC GEL) Jan 14 Project Details Expected revenue from sale of CERs for the life time of the project Rate assumed Registration Status CDM Advisor 23. Special features of Project (If any) 24. Undertaking: It is hereby undertaken that all material information pertaining to the project has been disclosed, and no such information has been withheld which are likely to influence the decision of the lender(s). It is further undertaken that there is no willful default in compliance of any of the laws as applicable from time to time on the project Company, for the purpose of availing of loan. Date: Place: 12 Signature: Name: Designation: Loan Application Form (PFC GEL) Jan 14 Project Details Annexure – Small Hydro 1. Category of the Project : Dam/Canal Fall/Run off River/Lake/Others (please specify) 2. Name of the River/Canal/Dam/Lake on which the project is proposed to be located : 3. Whether inter-country/state (please specify) : 4. Design Head (in Meters) : 5. Discharge (in Cumec i.e. m3/Sec) : Maximum Minimum – Design/Rated - 6. Sources of Water : Rain fed/Snow fed/Dam/Lake/any other 7. Sources of Discharge Data : 8. Period for which Discharge Data is seasons : Round the year/monsoon season/lean 9. Estimation of Power Generation 10. Energy Generation estimated as per DPR in MU : 11. Dependable year on which the annual energy has been estimated/arrived at in the DPR 12. Estimated Energy Generation in MU in 90% dependable year (if above is not estimated in 90% dependable year). 13. Annual Auxiliary Energy Consumption : 14. Transformation Loss in MU : 15. Transmission Line Losses in MU : 16. Energy Metering Point location : Switchyard/Grid Substation/Any other 17. Net Generation considered in Financials : 18. Project Configuration : 19. Turbine Type : Kaplan/Francis/Pelton/Any other 20. Proposed Configuration of the Project : 21. Generator Type : Induction/Synchronous/Others 13 MU Units x Loan Application Form (PFC GEL) MW Jan 14 Project Details 22. Detailed Cost Estimates: Particulars Unit Total Cost (` Lakhs) Amount (` Lakhs) Reference of Purchase Orders & Invoices Preliminary & Pre-operative expenses Registration & Frontend fee including SNA fees Land ( acres) R&R Cost Site Development Engineering & Consultancy Civil Works Approach Roads Fencing, Structure and Security Hydro Mechanical Stores/Ware House Substation/Control Room Other Facilities EPC/Plant & Machinery Electro Mechanical Switch Yard Equipment including Transformers Internal Cabling and Earthing Control & Instrumentation Others Spares Installation, testing & commissioning Evacuation Facilities Evacuation Charges payable to Discom/SNA/SEB Contingency Working Capital Margin Project Cost IDC Total Project Cost 23. Manpower Requirement Type / During Skilled Unskilled Implementation Operation 24. Configuration A. Dam/Dykes/Barrage: No Type Discharge Length Height Dam/Barrage Coffer Dam Dyke(s) Diversion tunnel/Channel 14 Loan Application Form (PFC GEL) Jan 14 Project Details B. Upper Reservoir: i. ii. iii. iv. v. Storage in Hr. Of operation) Gross storage (MCM) Live Storage (MCM) FRL (EL) MDDL (EL) C. Lower Reservoir: i. ii. iii. iv. v. Gross Storage (MCM) Storage (in Hr. Of operation) Live Storage (MCM) FRL (EL) MDDL (EL) D. Water Conductor System: No Type Tunnel/Channel Surge Shafts Pressure Shafts E. Hydro-mechanical works: No Type Gates & Hoists Penstock Spillway Discharge Length Height Discharge Length Height F. Power House: i. Type ii. Annual PLF/Availability iii. Turbines No. Type Discharge Head Size Head in generating mode Head in pumping mode iv. Estimated Energy Potential 90% dep. Year 75% dep. Year 50% dep. Year EOT Crane (No and Capacity) v. Generators No 15 Rated Voltage Loan Application Form (PFC GEL) Rated Output Jan 14 Project Details vi. Transformers No Rated Voltage Rated Output vii. Tail Race TWL (Max.)/(Min.) Type Size Length (Mt.) Discharge (cusec) viii. Switchyard Voltage Size/Type No. of bus/feeders ix. Operational Parameters Hr. of operation in gen. mode Hr. of operation in pump mode Availability of off-peak energy (in the regional grid) L/H ratio Charge to discharge ratio Cycle efficiency 25. Environment Impact Assessment Analysis for Small Hydro Major Environmental Issues (e.g. Forest, Land, Water Flow, Pollution etc.) Details of endangered biological species in the area and likely effect on them Is there any environmental mitigation or management plan available? Area of forest/tribal land required for the project Total area of land to be submerged Area of land proposed to be cleared for access road and transmission lines Area where muck/excavated waste material is proposed to be disposed Length & Budget for access road to site Details of upstream and/or downstream project(s), if any and effect thereof Is there any village irrigation scheme? If yes, provide details Minimum water flow planned during dry season (Cumec) Minimum flow proposed in the river during construction period. Approximate no. of trees proposed to be felled for the project. Rehabilitation & Resettlement Plan Are there any community complaints against the project? 16 Loan Application Form (PFC GEL) Jan 14 Project Details Annexure - Wind 1. Wind Data A. Nearest Wind Monitoring Station: B. Whether wind mast is in the approved list of wind sites C. Aerial distance of the proposed site from the above Wind Mast D. Height of above Wind Mast: E. Average Annual Wind Power potential at the proposed site (W/m2) at 50m above ground level 2. Estimation of Power Generation A. Energy generation guaranteed by the machine supplier B. Provide the generation data of wind farm projects adjacent to the proposed project location to verify above data: Sl Operator No Distance from the proposed site (Km) Quantity, Make and Rating of WEGs Actual Generation of last Year Achieved CUF/PLF 3. Project Configuration A. Details of the selected machine manufacturer/supplier Supplier Rating (kW) Hub Height Quantity : Cost/WEG (` Lakhs) 4. Detailed Cost Estimates Total Amount (` Lakhs) : Particulars Unit Total Cost (` Lakhs) Amount (` Lakhs) Reference of Purchase Orders & Invoices Preliminary & Pre-operative expenses Registration & Frontend fee including SNA fees Land ( acres) Site Development Engineering & Consultancy Civil Works Approach Roads Fencing, Structure and Security Stores/Ware House 17 Loan Application Form (PFC GEL) Jan 14 Project Details Tower Substation/Control Room Other Facilities EPC/Plant & Machinery Blades, Nacelle, Hub and Generators Switch Yard Equipment including Transformers Internal Cabling and Earthing Control & Instrumentation Others Spares Installation, testing & commissioning Evacuation Facilities Evacuation Charges payable to Discom/SNA/SEB Contingency Working Capital Margin Project Cost IDC Total Project Cost 18 Loan Application Form (PFC GEL) Jan 14 Project Details Annexure – Biomass 1. Fuel : Biomass/Bagasse/Solid waste (Biogas)/Others (specify) 2. Configuration : No of Units Size (MW) COD 3. Status of FSA & FTA Boiler Equipment Make Turbine Generator : Status Landed Cost of Fuel(with breakup) Quantum of supply/year Period of agreement Future escalation Other conditions 4. Fuel details (for various types of fuel envisaged) : A. Calorific value B. Storage Availability (No of days) C. Distance of project from source 5. Brief Technical specification for major equipment: Name of equipment Boiler Steam Required Process Steam For Power Generation Pressure Outlet Temp Turbine Temperature Inlet Pressure Governing System No of Cylinder Generator Output Rating Rated Voltage Efficiency Cooling System Type of Excitation System Fuel Handling System Ash Handling System 19 Technical Spec Loan Application Form (PFC GEL) Supplier (if finalised) Jan 14 Project Details 5. Detailed Cost Estimates: Particulars Unit Total Cost (` Lakhs) Amount (` Lakhs) Reference of Purchase Orders & Invoices Preliminary & Pre-operative expenses Registration & Frontend fee including SNA fees Land ( acres) Site Development Engineering & Consultancy Civil Works Approach Roads Fencing, Structure and Security Stores/Ware House Main TG Building Fuel Handling System Chimney Ash Handling System Cooling Towers Water Treatment Plant Substation/Control Room Other Facilities EPC/Plant & Machinery Boiler Package TG Package Fuel Handling & Transportation System Water Treatment Plant CW System Ash Handling System Switch Yard Equipment including Transformers Internal Cabling and Earthing Control & Instrumentation Others Spares Installation, testing & commissioning Evacuation Facilities Evacuation Charges payable to Discom/SNA/SEB Contingency Working Capital Margin Project Cost IDC Total Project Cost 20 Loan Application Form (PFC GEL) Jan 14 Project Details 6. Environment Impact Assessment Analysis for Biomass Major Environmental Issues (e.g. Forest, Land, Pollution etc.) Air Emissions Statutory limit Emission Type Anticipated level after commissioning Particulate (Exit) SO2 (Exit) NOX (Exit) Effluent type Water Pollution Sound pollution Is there any environmental mitigation or management plan available? Area of forest/tribal land required for the project Length & Budget for access road to site Evidence/record available of endangered biological species in the area to be enclosed? Provide a copy of clearance received from the Department of fisheries/Other concerned Department Area of land proposed to be cleared for access road and transmission lines Approximate no. of trees proposed to be felled for the project. Are there any community complaints against the project? Indicate major issues and proposed action 21 : Loan Application Form (PFC GEL) Jan 14 Project Details Annexure – Solar Thermal Solar Thermal Power Projects – Technical Data 1. Technology : Parabolic Trough Collector/LFR/Power Tower/Dish Sterling 2. Solar Resource Assessment / Energy Generation Assessment Study : DNI (kwh/m2/year) Gross AEP (kWh/year) Net (Saleable) AEP (kWh/year) P50 level P75 level P90 level Typical Meteorological Year (TMY) IMD NREL NASA Meteonorm Ground Data (if available) 3. Plant Configuration (Solar Field, Power Block, Thermal Storage) Solar Field Solar-Field Aperture Area (sq. m) No of Solar Collector Assemblies (SCAs) No of Loops No of SCAs per Loop SCA Aperture Area (sq. m) SCA Length (m) No of Modules per SCA SCA Manufacturer & Model No Mirror Manufacturer & Model No Heat Collector Element (HCE) / Absorber Tube Manufacturer & Model No No of HCE/Absorber Tubes Heat-Transfer Fluid (HTF) Type HTF Supplier Name Solar-Field Inlet Temp (°C) Solar-Field Outlet Temp (°C) Steam Process Steam For power generation Pressure Outlet Temperature (°C) Power Block Turbine Capacity (Gross, MW) Turbine Capacity (Net, MW) Turbine Manufacturer & Model No No of Cylinders Governing System Power Cycle Pressure (bar) Cooling Method Cooling Method Description Turbine Efficiency at full load 22 Loan Application Form (PFC GEL) Jan 14 Project Details Annual Solar-to-Electricity Efficiency (Gross, %age) Backup Fuel Type, if any (coal/gas etc.) Backup utilization, if any, under normal conditions (in %age) Thermal Storage Storage Type Storage Capacity (in hours) Quantity of Molten Salt (tonnes) Molten Salt - Chemical Composition / Mix (% of each component) Tank height and diameter (in meter) Generator Output Rating Rated Voltage Efficiency Cooling System Type of Exciting System 7. Detailed Cost Estimates : Unit Particulars Cost (` Lakhs) Total Amount (` Lakhs) Reference of Purchase Orders & Invoices Preliminary & Pre-operative expenses Registration & Frontend fee including SNA fees Land ( acres) Site Development Engineering & Consultancy Civil Works Approach Roads Fencing, Structure and Security Stores/Ware House Main TG Building Cooling Towers Water Treatment Plant Substation/Control Room Other Facilities EPC/Plant & Machinery Receiver Collectors Package/Steam Generator TG Package Water Treatment Plant CW System Switch Yard Equipment including Transformers Internal Cabling and Earthing Control & Instrumentation Others Spares Installation, testing & commissioning Evacuation Facilities Evacuation Charges payable to Discom/SNA/SEB Contingency Working Capital Margin Project Cost IDC Total Project Cost 23 Loan Application Form (PFC GEL) Jan 14 Project Details 24 Loan Application Form (PFC GEL) Jan 14 Project Details Annexure – Solar PV Solar PV Power Projects – Technical Data 1. Technology : Monocrystalline/Polycrystalline 4. Solar Resource Assessment / Energy Generation Assessment Study : DNI (kwh/m2/year) Gross AEP (kWh/year) Net (Saleable) AEP (kWh/year) P50 level P75 level P90 level Typical Meteorological Year (TMY) IMD NREL NASA Meteonorm Ground Data (if available) 2. Detailed Cost Estimates : Unit Particulars Cost (` Lakhs) Total Amount (` Lakhs) Reference of Purchase Orders & Invoices Preliminary & Pre-operative expenses Registration & Frontend fee including SNA fees Land ( acres) Site Development Engineering & Consultancy Civil Works Approach Roads Fencing, Structure and Security Stores/Ware House Substation/Control Room Other Facilities EPC/Plant & Machinery SPV Modules (kW) Trackers Power Conditioning System including Inverters Switch Yard Equipment including Transformers Internal Cabling and Earthing Control & Instrumentation Others Spares Installation, testing & commissioning Evacuation Facilities Evacuation Charges payable to Discom/SNA/SEB Contingency Working Capital Margin Project Cost IDC Total Project Cost 25 Loan Application Form (PFC GEL) Jan 14 Annexure Environment Impact Assessment Analysis for other Renewable Energy Projects Major Environmental Issues (e.g. Forest, Land, Water Flow, Pollution etc.) Is there any environmental mitigation or management plan available? Area of forest/tribal land required for the project Length & Budget for access road to site Evidence/record available of endangered biological species in the area to be enclosed? Provide a copy of clearance received from the Department of fisheries/Other concerned Department Area of land proposed to be cleared for access road and transmission lines Approximate no. of trees proposed to be felled for the project. Are there any community complaints against the project? Form I Letter of Authorisation to Banks/FIs Date: _______________ The Manager, _______________________ _______________________ _______________________ _______________________ Dear Sir, We hereby authorize you to discuss with M/s PFC Green Energy Limited, to which we are making an application for financial assistance, our affairs or any matter relating thereto, and to disclose such information as M/s PFC Green Energy Limited may request you or as you may consider fit to disclose. Yours faithfully, ( ) Authorised Signatory 1.0 PROMOTER DETAILS – Individuals (to be submitted separately for each promoter, in Table 1.2 earlier, as individual) 1.1 Name of the Individual promoter 1.2 Relationship of the above promoter: i. With other individual promoters, if any; ii. With other corporate promoters, if any. 1.3 Whether Indian /Foreign National (please give name of the country)/NRI 1.4 Note on how the proposed equity contribution (means of equity) in the project would be met. In case the equity contribution is to be met by way of selling real estate including agricultural land, shares in group companies, etc., the Note may also elaborate on the proposed plan to mobilize required funds. 1.5 Note on existing business operations, if any 1.6 Note on promoters’ qualifications/experience in managing/operating businesses 1.7 Details of guarantees given / committed. 1.8 Details of current over dues, if any, to any bank/FI. 1.9 Note on track record with lenders during last 3 years inter-alia covering recovery proceedings, CDR package, restructuring, rescheduling, etc. 1.10 List of documents to be submitted: iii. Latest net worth statement duly certified by a chartered accountant. iv. Copies of Income Tax / Wealth Tax Returns filed in the last three years v. Copies of the latest income tax assessment order.