NEPTUNE POWER NEPTUNE POWER GROUP MEMORANDUM From: Date: To: Subject: Bruce Howe and Harold Kirkham 17 May 2002 Power Group and CoDR Participants Concept Design Review (CoDR) Planning The NEPTUNE Power System Concept Design Review will take place 10 – 11 June 2002 on the University of Washington Campus. The purpose of this memorandum is to: Define the scope of the review, List the reviewers and participants, Describe the documentation that will be available, Define the expected products and timetable, and Present the agenda. Scope of the CoDR The purpose of the Review is to ensure that the design is progressing appropriately, and to identify possible deficiencies and suggest corrective actions. It is a concept review, so concrete solutions for some aspects of the system may not exist yet. This review will be followed by a NEPTUNE Concept Design Review planned for 10-12 September 2002. A Preliminary Design Review (PDR) for the Power System will follow later in the year. Process The process used in the Review will be to have presentations by the Project to the Board on all aspects of the work. Areas reviewed include the project management (risk, cost, schedule etc), mission assurance, as well as the technical aspects of the development. The Board will note any area of concern, and document the concern on a Request For Action form, along with any suggestions for resolution that they may have. After each day’s presentations, the Board will work with the Project to dispose of the RFAs. This means the concern will be classified as Accepted for Action, Accepted as Advisory or Rejected. The rationale for the disposition will be documented. At the end of the Review, all RFA dispositions will be included in the presentation of the Board’s Summary. Review Board The Review will be conducted by a Board comprised of recognized external authorities in the various fields relevant to the power system (see table). The Review will be open to all NEPTUNE participants and other interested parties. Name Affiliation John Paserba Mitsubishi Electric Power Studies Power systems and solid state Group switches Consultant Electrodes, corrosion Consultant HVDC, Power system analysis ALSTOM T&D Power Electronic Converters Jim Jenkins John Reeve Neil Kirby Expertise Systems, Stafford, England A. J. Farrar (Tony) Michael Hofmann Jules Esztergalyos Alcatel, Greenwich, UK Bonneville Power Authority Bonneville Power Authority Telecom power systems Protection relays Protection Documentation All material will be the web site and available to participants. The existing web site is http://cialab.ee.washington.edu/neptune; the existing ftp site is cialab.ee.washington.edu, username neptune, password neptune. The latter has many of the relevant files but is not so easy to navigate. A new combined site is in preparation and will replace these very soon; you will be notified as to this change. The following material will be provided all reviewers and project personnel in hard copy form and on CD; it will be available on CD to other participants upon request. Project Concept of Operations (Harold Kirkham) System Requirements and Specification (Harold Kirkham) Statements of Work (Bruce Howe and Harold Kirkham) Power System Considerations for Undersea Observatories, Howe, Kirkham, and Vorpérian, IEEE J. Oceanic Engineering, May 2002 Index to Documentation (Bruce Howe) Shore station Converter, surge arresters, and vacuum switches (Mohamed El-Sharkawi) UPS (Tim McGinnis) Electrodes (Tim McGinnis) Cable Cable Parameters (Aditya Upadhye and Mohamed) Node Backbone DC Switchgear – Concept (Mohamed El-Sharkawi) Backbone DC Switchgear – Components (Mohamed El-Sharkawi and Denise Dennis) Node Converter (Vatché Vorpérian) System Data Acq and Comms (Chen-Ching Liu, Kevin Schneider, and Tim McGinnis) Power Monitoring and Control System (PMACS – Kevin Schneider and Chen-Ching Liu) Protection (Kevin Schneider and Chen-Ching Liu) Restoration (Chen-Ching Liu and Byung Ki Park) Slow models: Power Flow (Kevin Schneider and Chen-Ching Liu) Transient Models: Circuit Breaker Restrikes (Aditya Upadhye and Mohamed El-Sharkawi) Reliability (Richard Kemski) Extensive supporting documentation can be found on the present ftp site. Expected Products The minutes of the Review will be prepared by Howe and circulated to the Review Board members and project personnel for review before being posted on the web site by 14 June. All presentation material will also be placed on the web site. The report on the Review, summarizing the major findings, including major outstanding questions and weaknesses, will be prepared by the Chair with assistance from the members. It will be submitted by 18 June and will be posted on the web site. The entire web site, containing all the NEPTUNE power system documentation to date will be copied to CD and made available to interested parties. The report will be presented at the NEPTUNE-wide meeting scheduled for 29 July – 2 August and at the NEPTUNE-wide Concept Design Review, presently planned for 10 – 12 September 2002. Agenda The draft agenda follows. Much of the first morning material is overview; one member may arrive late in the morning. Agenda NEPTUNE Power System Concept Design Review NEPTUNE Program Office Conference Room 207 Old Oceanography Building, on the waterfront, UW Campus 10 – 11 June 2002 Monday 10 June 08:30 09:00 09:15 10:15 10:30 11:45 12:15 13:15 13:45 15:00 15:15 16:15 17:00 Coffee and Rolls Welcome, Introductions, Logistics, Review the Agenda NEPTUNE Overview – Bruce Howe Break Power System Overview – Harold Kirkham Shore station presentations (Mohamed El-Sharkawi, Tim McGinnis) Lunch (sandwiches brought in) Complete shore station presentation Cable parameters, DC switches, and transient Modeling (Mohamed El-Sharkawi) Break Node Converter – Vatché Vorpérian Data acq and comms/node controllers – Tim McGinnis Adjourn Between 17:00 and 18:30, some of the Board will work with the Project on disposing of the day’s Requests for Action (RFA) 18:30 Dinner at ?? Tuesday 11 June 08:30 09:00 09:30 10:00 10:45 11:00 11:30 12:15 12:30 13:30 15:00 15:15 16:00 17:00 Coffee and Rolls Slow Models – Kevin Schneider PMACS – Chen-Ching Liu Protection – Kevin Schneider Break Restoration – Chen-Ching Liu Reliability – Rich Kemski Summary – Harold Kirkham Lunch (sandwiches brought in) Questions This period will also be used for the disposition of outstanding RFAs Break Questions Summarize, draft report Close Liesje Bertoldi, the NEPTUNE Office administrator is just next door (Tel: 206-685-9556). Internet jacks are available. There will be a computer projector and an overhead machine available.