DESIGN NO.______
SECTION 10350
FLAGPOLE
PART 1 - GENERAL
1.01
DESCRIPTION OF WORK
A.
B.
2
1.02
Provide flagpole as indicated on Drawings and
specified herein. Provide flag as specified herein.
Provide pole top flagpole light as specified herein.
SUSTAINABILITY REQUIREMENTS
A.
Sustainability requirements included in the Section are
as follows:
1.
B.
1.03
Documentation on recycled materials.
The Contractor shall implement practices and procedures
to meet the Project’s sustainable requirements. The
Contractor shall ensure that the requirements related
to these goals, as defined in Specification Section
S01352, Sustainability Requirements, and as specified
in this Section, are implemented to the fullest extent.
Substitutions or other changes to the work shall not be
proposed by the Contractor or their sub-contractors if
such changes compromise the stated Sustainable Design
Performance Criteria.
REFERENCES
A.
References and industry standards listed in this
Section are applicable to the Work. Unless more
restrictive criteria or differing requirements are
explicitly stated in the Specifications, or mandated
by
governing
codes
or
regulations,
the
recommendations,
suggestions,
and
requirements
described in the referenced standards shall be deemed
mandatory and applicable to the Work.
1.
1.04
as
Aluminum Association (AA).
SUBMITTALS
A.
Shop Drawings
Show requirements for foundations, connections to
adjacent
Work,
fabrication
details
and
power
requirements for pole top light.
NYCSCA
FLAGPOLE 10350 - 1
05/15/15
B.
DESIGN NO.______
Product Data
Catalog
sheets,
specifications,
and
installation
instructions for flagpoles/flags specified.
C.
Contract Closeout Submittals
Operation and Maintenance Data: Submit two (2) copies,
covering the installed products, to the Authority.
2
1
1.05
D.
Sustainability Submittals
1.
Submit documentation of recycled content for poles
consisting of product data or manufacturer’s
statement.
2.
Submit Contractor’s Sustainable Materials Form for
doors with complete materials cost information in
accordance with Section S01352, Sustainability
Requirements.
QUALITY ASSURANCE
A.
Manufacturer
Five (5) years minimum experience in manufacture of
flagpoles and flags of type specified.
B.
Installer
Three (3) years minimum experience in installation of
flagpole and flags of type specified.
1.06
DELIVERY, STORAGE, AND HANDLING
A.
Deliver, store, and handle flagpole and accessories as
recommended by manufacturer to protect from damage.
PART 2 - PRODUCTS
2.01
2.02
MANUFACTURERS
A.
American Flagpole, Abingdon, VA 24210.
B.
Concord Industries Inc., TX 75001
FLAGPOLE
A.
NYCSCA
Design Criteria:
Flagpole,
bases,
and
devices to resist 90
velocity, flagless.
anchorage
mph wind
FLAGPOLE 10350 - 2
05/15/15
2.03
B.
Material: Aluminum 6063T6 alloy, seamless.
C.
Type of Taper: Uniform conical.
D.
Ground set or outrigger mounting: See Drawings.
E.
Height:
See Drawings.
F.
Finish:
Color selected by Project Architect. Anodized
AA- C22-A42, Class 1.
G.
Finial:
Ball, flush seam, 14 gage, finished to match
flagpole.
H.
Halyards: Two (2) No. 10 polypropylene with two bronze
snap hooks for each halyard.
I.
Cleats: Two 9" aluminum, finish to match flagpole.
J.
Cleat Box: Aluminum, finish to match flagpole. Provide
hinged cover, hasp and staple for padlock
attached with tamper-proof screws.
K.
Flash Collar: Cast aluminum.
L.
Foundation Sleeve:
M.
Foundation Sleeve Plate: 1/2" thick steel plate.
3
16 gage corrugated galvanized steel
tube.
FLAG
A.
2.04
DESIGN NO.______
Material for flag shall be weather resistant, premium
nylon, UV resistant fabric. All seams shall be locked
stitched reinforced for maximum durability. Stars shall
be precision embroidered or sewn appliqued.
FLAGPOLE LIGHT
A.
Flagpole mounted down light shall meet requirements of
International Dark-Sky Association’s Dark-Sky Certified
down light.
PART 3 - EXECUTION
3.01
1
NYCSCA
INSPECTION
A.
Inspect
sleeve.
foundations
for
proper
depth
and
size
of
B.
Inspect anchorage of sleeve to wall. Verify length and
butt diameter of sleeve.
FLAGPOLE 10350 - 3
05/15/15
3.02
DESIGN NO.______
PREPARATION
A.
3.03
Paint portions of flagpole below grade with heavy coat
of bituminous paint.
INSTALLATION
3
3.04
A.
Install flagpoles, flags, base assemblies, cleat and
fittings, in compliance with acceptable final Shop
Drawings and manufacturer's instructions.
B.
Provide
positive
installation.
C.
Provide wiring for flag pole mounted downlight.
lightning
ground
for
flagpole
TEST AND ADJUST
A.
Check and adjust installed
operation of halyards.
fittings
for
smooth
END OF SECTION
AS:as
Notes to Specifier (Delete from Specifications)
1.
Edit to suit Project requirements.
Use paragraph A if ground-mounted flagpole is used. Confirm
that the drawings indicate foundation for the flagpole.
Use paragraph B if wall mounted outrigger type flagpole is
used. Confirm that the drawings indicate structural support
for the flagpole.
2.
Omit for projects where NYC Green Schools Rating System
compliance is not required (Typical of CIP projects, UPK
Center conversions and fit-outs).
Verify for referenced
project.
3.
Pole top luminaire is not required if ground or wall mounted
spot light is provided. Pole top luminaire must be provided
for projects that must comply with NYC Green Schools Rating
System.
Coordinate with Electrical designer to ensure
wiring and electrical requirements are indicated on the
Contract Documents.
NYCSCA
FLAGPOLE 10350 - 4
05/15/15
DESIGN NO.______
LIST OF SUBMITTALS
SUBMITTAL
DATE SUBMITTED
DATE APPROVED
Product Data:
_____________
____________
1. Catalog sheets, specifications,
installation 1nstructions
Shop Drawings:
_____________
____________
_____________
____________
1. Fabrication Details
2. Connections to adjacent
work
Contract Closeout
1. Operation & Maintenance
data
2
Sustainability:
_
______________
1. Mfr’s printed literature
or statement on recycled,
material content.
2. Contractor’s Sustainable
Materials Form (see Section
S01352) with materials
cost information)
* * *
NYCSCA
FLAGPOLE 10350 - 5