Forecasting methods

advertisement
CONTENTS OF PRACTICAL TRAINING II
The goal of the Practical Training II is to improve students’ ability on Industrial
Engineering and Management practices. During the Practical Training II, students have to
learn the required information about the company and its processes and have to answer the
questions in List 1.
Students then have to observe some problems of the processes and provide proper
solutions to problems using any of the management tools or methods shown in List 2.
List 2 could be enlarged according to conditions of the company.
There will be 3 main parts in the internship notebook:
 Short weekly report explaining weekly activities
 Answers to the questions
(70 points)
 Project (Problem definition, Material & Method, Results) (30 points)
Students also must have their evaluation forms filled by their supervisors and bring it in
an enclosed envelope with their internship notebook. Electronic form of the internship
notebook will be uploaded on moodle.
List 1. Questions that will be answered during the Practical Training (Ones in the
brackets will be used if the other question is not appropriate for the facility. Question 6 & 13
can be missed if the study is taken place in service sector and associated points will be
transferred to the project section).
1. General information about the company. (2 points)
2. Historical information regarding realization of the company and follow-up
evolution of the facilities. (2 points)
3. The organizational chart of the company. (4 points)
4. List of administrators, engineers and industrial engineers employed by the
company including their contact information. (3 points)
5. Factors considered in the choice of current location for the facility. (4 points)
6. Analyses of raw materials, labor and other resources. (6 points)
7. List of items produced. (List of services produced.) (5 points)
8. Revenue and market share in domestic and export markets including forecasts. (3
points)
9. Description of the production system in the company. (Description of the service
system in the company.) (10 points)
10. Description of the computer network in the company. (2 points)
11. List of software used in the organization. (2 points)
12. Description of any specialized Industrial Engineering software. (3 points)
13. Production planning and control activities in the company. (10 points)
14. Quality control and management activities. (Customer relations and satisfaction
activities in the company.) (10 points)
15. Other industrial engineering activities performed in the company. (4 points)
List 2. Sample application areas and methods that can be used in Practical Training
project
 Production Planning and Control
 Assembly Line Problems
 Forecasting methods
 Design of products
 Computer Aided Drawing
 Manufacturing Processes
 Problem solving using OR techniques
 Capacity Planning
 Supply – Chain Management
 Human resources management
 Training Programs in the Company
 Project Management
 Transportation Problems
 Computer Aided Manufacturing
 Analysis of the Software used in the company
 ERP packages and database management software
 E-commerce
 Inventory management
 Just-in-Time Systems
 Material Requirement Planning
 Warehousing and Storage
 Scheduling
 Maintenance
 Waiting Line Problems
 Simulation
 Quality Control
 Statistical Process Control
 Total Quality Management Activities
 ISO 9000
 Customer Relationship Management
 Financial Management
 Accounting Management
 Marketing Strategies of the Company
 Productivity
Calendar for Internship Program:
 June 14th: Last day of accepting Internship Acceptance Form (from
‘my.fatih.edu.tr’).
 September 30st: Last day of accepting “Internship Notebook and Evaluation
Form”
 October 11th: Last day of announcing the results of Practical Training II as
acceptance, rejection or correction.
First Corrections:
 October 28th: Last day of accepting corrected internship notebooks.
 November 4th: Last day of announcing the results of corrected internship
notebooks.
Second Corrections:
 November 18rd: Last day of accepting corrected internship notebooks.
 November 25th: Last day of announcing the results of corrected internship
notebooks.
Download