Limestone

advertisement
REVISED: 12/10/09
SPECIFICATION
LIMESTONE
1.0
2.0
SCOPE:
1.1
This specification covers crushed stone, crusher run, crusher dust, rip-rap, and
gabion stone.
1.2
Term: Bid prices shall be effective for one year from date of award. Blanket
agreements based on this bid may be renewed under the same terms and
conditions for two (2) additional one- (1) year periods upon written consent of
both parties.
MATERIAL:
All material listed shall meet the applicable requirements of Section 703-02 - Coarse
Aggregate, and Section 304 - Subbase Course, in accordance with New York State
Department of Transportation Standard Specifications Construction and Materials, latest
edition. (Although NYSDOT specifications are Metric, materials covered by this bid
shall be measured in English units. All materials and methods shall meet converted
NYSDOT Specifications.)
3.0
METHOD OF MEASUREMENT:
Although NYSDOT specifications are Metric, materials covered by this bid shall be
measured in English units. All materials and methods shall meet converted NYSDOT
Specifications.
4.0
AWARD OF BID:
4.1
A Letter of Intent to Award shall be made to each of the respective vendors
solely for the purpose of locking the bid prices.
4.2
For FOB Materials at Bidder’s Location
4.2.1 Vendor shall be bound to sell materials loaded into Municipal trucks at the
bid price.
4.2.2 Award will be based on the Zone Price.
4.2.2.1 The Zone Price is the FOB price plus $0.25/Ton mile times
number of miles from the bidder’s location to the Zone location.
4.2.2.2 Example: FOB + [(.25/Ton mile) x (Miles to Zone)] = Zone Price
4.2.2.3 The Zone applicable to a specific job will be that which is closest
to the job site.
4.2.2.4 Miles from bidder’s location to each Zone is calculated by using
the shortest, most direct or reasonable route.
4.2.2.5 Where the project location or time delays may cause the “award of
bid” not to be in the best interests of the Municipality, or should
the direct route to any successful bidder's location change due to
unforeseen circumstances (i.e. detour), Municipality reserves the
right to re-route trucks to another bidder’s location, which will
result in a lower net cost to the Municipality.
4.2.2.6 Zones:
TOWN HIGHWAY
DEPARTMENT
ZONE
Lansing
1
Groton
2
Dryden
3
Caroline
4
Danby
5
4.3
5.0
TOWN HIGHWAY
DEPARTMENT
ZONE
Ithaca
6
Newfield
7
Enfield
8
Ulysses
9
For Delivered Material –
4.3.1
Vendor shall be bound to sell materials at the F.O.B. Price bid plus the
bid price for delivery via Vendor-supplied trucks to Municipal
location(s) specified.
4.3.2
Awards will be based on the lowest delivered prices (material plus
trucking) to specified locations.
TOMPKINS COUNTY CONTACT:
5.1
Questions concerning the bid package and bid procedures should be directed to:
Lisa Jehu, Buyer
125 East Court Street, Ithaca, NY 14850
(607) 274-5500
FAX: (607) 274-5505
5.2
Questions concerning the technical specifications should be directed to:
William Sczesny, Highway Manager
170 Bostwick Road, Ithaca, NY 14850
(607) 274-0300
FAX: (607) 272-8489
REVISED: 02/06/09
REVISED: 02/06/09
COMPANY NAME:
BID FORM
LIMESTONE
BID:
FOB
Item No.
1
Product Description
#1A
Crushed Limestone
$
/Ton
2
#1ST
Crushed Limestone
$
/Ton
3
#1
Crushed Limestone
$
/Ton
4
#2
Crushed Limestone
$
/Ton
5
#3
Crushed Limestone
$
/Ton
6
#4
Crushed Limestone
$
/Ton
7
Limestone Mix
Equal Parts: #1A, #1, #2
$
/Ton
Crusher Dust
$
/Ton
8
9
Type 2
Crusher Run (2” minus)
$
/Ton
10
Modified Type 2 *
Crusher Run (1½ minus)
$
/Ton
11
Rip Rap
Average Run
$
/Ton
12
Rip Rap
Select
$
/Ton
Gabion Stone
$
/Ton
13

Modified TYPE 2 specifications meet TYPE 2 crusher run, except 100% pass 1½” sieve.
Delivered - ADDITIONAL cost per ton to deliver to Town Highway Departments:
Lansing (Zone 1)
$_________/ton
Caroline (Zone 4) $_________/ton
Newfield (Zone 7) $_________/ton
Groton (Zone 2)
$_________/ton
Danby (Zone 5)
$_________/ton
Enfield (Zone 8)
$_________/ton
Dryden (Zone 3)
$_________/ton
Ithaca (Zone 6)
$_________/ton
Ulysses (Zone 9)
$_________/ton
Indicate here, place of manufacturer, or location of pit, or other source of material:
_________________________________________________________________________
Download