TOWN OF GRANITE FALLS FEE SCHEDULE EFFECTIVE JULY 1, 2010 The following schedule of fees and miscellaneous charges is subject to ongoing staff review and staff will report on this schedule to the Town Council at least annually. Administration I. Photocopies of Existing Documents Town Business (Black & White) Non-Town Business (Black & White) Town Business (Color) Non-Town Business (Color) Maps $.05 $.15 $.15 $.25 $1.50 II. Notary Fee - Non-Town Business $5.00 III. Returned Check Fee $25.00 IV. Privilege License $25.00 V. Etched in Granite $26.75 per sheet per sheet per sheet per sheet Planning Department I. Zoning Permit Single-family homes, accessory structures or other permits not requiring site plan or design review. Multi-family homes/commercial/industrial construction or additions that require site plan review $25.00 $100.00 plus an additional $25.00 for every 1,000 sq. ft. over 5,000 sq. ft. New freestanding sign permits (excludes replacing lettering on existing sign structures) up to 100 sq. ft. signs $50.00 plus an additional $1.00 for every sq. ft. over 100 sq. ft All other sign permits $25.00 Double permit fee for any construction without a permit. 2/12/2016 Page 1 of 7 TOWN OF GRANITE FALLS FEE SCHEDULE EFFECTIVE JULY 1, 2010 (Planning Dept. continued) II. Rezoning Petition/Zoning Map $150.00 III. Zoning Text Amendment $100.00 IV. Variance Request $100.00 V. Conditional Use Permit (CUP) $150.00 VI. Special Use Permit (SUP) $150.00 VII. Planned Developments (PD) $150.00 VIII. Appeal of Interpretation IX. New Cell Tower X. Floodplain Development Permit XI. Zoning Compliance Letter XII. Driveway Permit $50.00 $2,500.00 $25.00 $0 Abatement of Overgrown Property $50.00 $100.00 $250.00 $500.00 2/12/2016 ($1,000 if criteria set forth in Zoning Ordinance is met) $250.00 $25.00 $50.00 XIII. plus $20.00 per acre Driveways Associated with New Zoning Permit No Curb Cut Required Curb Cut Required Cost + $150.00 Administrative Fee + Civil Penalty for 1st Violation Civil Penalty for 2nd Violation Civil Penalty for 3rd Violation Civil Penalty for 4th & All Ensuing Violations Page 2 of 7 TOWN OF GRANITE FALLS FEE SCHEDULE EFFECTIVE JULY 1, 2010 Public Works Department I. Cemetery Lots Sunset Hills II. Traffic Signs Fee $400.00 $1,200.00 Inside Rate (1 per person) Outside Rate (1 per person) Cost plus $5.00 Administrative Fee Recreation Department I. II. III. Resident Team Sports $35.00 Non-Resident Team Sports $45.00 Resident (Swim Team) $15.00 Non-Resident (Swim Team) $25.00 Youth (pool) $3.00 Adult (pool) $4.00 Adult (pool – not swimming) $2.00 Day Care (pool – per person) $2.00 Season Pool Pass (individual) $50.00 Season Pool Pass (family) IV. $130.00 Pool Rental $50.00/$40.00 General Public/Civic & Church Groups Room Rental (Need Description) $25.00/$35.00/hour GFRC Open/GFRC Closed Gym Rental $40.00/hour Paid in Advance Civic Building Rental $30.00/hour Paid in Advance Picnic Area Rental $30.00 Refundable Reservation Fee Company Picnic Rental 2/12/2016 $150.00 Paid in Advance Page 3 of 7 TOWN OF GRANITE FALLS FEE SCHEDULE EFFECTIVE JULY 1, 2010 Water & Wastewater Departments I. Rates II. Water Meter Deposit Residential Commercial/Industrial III. Sewer Deposit Residential Commercial/Industrial See Schedule A $50.00 $250.00 minimum or 2 months average bills $50.00 $250.00 minimum or 2 months estimated average bill IV. Reconnect Fee V. Late Payment Fee VI. Water & Irrigation Taps ¾ inch 1 inch 2 inch 6 inch 8 inch $800.00 $1,200.00 $1,800.00 Cost plus 15% Cost plus 15% each each each each each Sewer Taps 4 inch 6 inch 8 inch 10 inch 12 inch $1,000.00 $1,500.00 Cost plus 15% Cost plus 15% Cost plus 15% each each each each each VII. 2/12/2016 $30.00 5% of bill outstanding Page 4 of 7 TOWN OF GRANITE FALLS FEE SCHEDULE EFFECTIVE JULY 1, 2010 Electric Department I. Rates II. Electric Meter Deposit Residential Commercial/Industrial See Schedule B $250.00 $1,000.00 minimum or 2 months estimated average bills III. Reconnect Fee $50.00 IV. Late Payment Fee 5% of bill outstanding V. Underground Service 200 AMP less than 125 feet 0.00 No charge all electric service. $175.00 Partial electric service 200 AMP greater than 125 feet Cost of labor & materials for all electric service Greater of $250 or cost of labor & materials for partial electric service 400 AMP less than 125 feet $400.00 All electric service Greater of $500 or cost of labor & materials for partial electric service 2/12/2016 Page 5 of 7 TOWN OF GRANITE FALLS FEE SCHEDULE EFFECTIVE JULY 1, 2010 WATER AND SEWER RATES EFFECTIVE 7/1/2010 W3 175% OF INSIDE OUTSIDE $22.50 $2.90/1000 $3.05/1000 $3.20/1000 $33.25 $5.08/1000 $5.35/1000 $5.62/1000 WATER RATES 0-3000 Next 12,000 Next 10,000 Over 25,000 $19.00 $2.90/1000 $3.05/1000 $3.20/1000 SEWER (RESIDENTIAL) 175% OF INSIDE Base Charge 0-15,000 Over 15,000 $20.00 $4.20/1000 $4.47/1000 $11.45 $2.40/1000 $2.55/1000 SEWER (COMMERCIAL) Base Charge 0-15,000 Over 15,000 $12.75 $2.60/1000 $2.85/1000 $22.31 $4.55/1000 $5.00/1000 LARGE COMMERCIAL AND INDUSTRIAL WATER RATE TO QUALIFY MUST USE OVER 250,000 GALS/MO. 0-3,000 $21.38 3,000 - 50,000 $2.30/1000 50,000-100,000 $2.40/1000 100,000 & OVER $2.50/1000 (Huffman Hos., Pepsi Cola, Camelot) 2/12/2016 Page 6 of 7 Granite Falls Electric Rates Effective 7-1-2010 Residential Rates $ $ $ $ $ $ E3 16.57 0.55 17.12 0.09651 0.09528 0.09325 Basic Facilities Charge: REPS Fee Total Facilities $ $ $ Commercial Electric E6 E13* 23.36 $ 23.36 $ 2.21 $ 2.21 $ 25.57 $ 25.57 $ Minimum Charge: $ 25.57 $ 25.57 $ 95.13 $ 30.70 $ 94.57 $ 67.90 $ 112.93 $ 130.61 $ 153.42 Demand Charges: 0 to 30 kW Over 30 kW $ $ $ 6.91 $ $ 6.91 $ $ 8.46 $ $ 6.91 $ $ 8.46 $ $ 7.83 $ $ 8.18 $ $ 8.18 $ 9.80 $ $ 0.13190 $ 0.07429 $ $ 0.06617 $ 0.06225 $ 0.05595 Basic Facilities Charge REPS Fee Total Facilities First 500 kWh Next 500 kWh All over 1,000 kWh $ $ $ $ $ $ E4 16.57 0.55 17.12 0.09561 0.09325 0.09101 $ $ $ $ $ $ E5 16.57 0.55 17.12 0.09409 0.09045 0.08865 Commercial and Industrial Rates Energy Charges: First 100 kWh/ kW billing First 3,000 kWh All over 3,000 kWh All kWh Commercial E8 E9 92.92 $ 28.49 2.21 $ 2.21 95.13 $ 30.70 0.13190 0.07429 $ $ $ All-Electric E13 $ 92.36 $ $ 2.21 $ $ 94.57 $ 0.12212 0.06909 0.07292 $ $ $ E7 36.48 $ 31.42 $ 67.90 $ Industrial Electric E10 E11 81.51 $ 99.19 $ 31.42 $ 31.42 $ 112.93 $ 130.61 $ E12 122.00 31.42 153.42 0.12212 0.06337 0.07292 Next 200 kWh kW billing All kWh $ 0.07775 $ 0.07775 $ 0.07292 $ 0.07370 $ 0.06719 $ 0.06337 $ 0.06450 $ 0.05584 $ 0.05022 Over 300 kWh / kW billing All kWh $ 0.06797 $ 0.06797 $ 0.06831 $ 0.06225 $ 0.05887 $ 0.06101 $ 0.06101 $ 0.05415 $ 0.04381 CP-98-1C Basic Facilities Charge REPS Fee Total Facilities Demand Charge: Summer(June-Sept) Winter (Oct-May) Excess all months Energy Charges: First 438kWh/kW of Billing Demand All remaining kWh REPS Fee Total Facilities Energy Charge: Does not include NC sales tax. * E13 is for Small Commercial No Demand Electric Rates 7-1-10 CP-98-1I CP-98-2I CP-98-3I $284.54 $2.21 $286.75 $287.95 $2.21 $290.16 $56.51 $31.42 $87.93 $284.54 $31.42 $315.96 $287.95 $31.42 $319.37 $19.29 $4.65 $1.65 $18.74 $3.31 $1.65 $18.37 $2.88 $0.00 $19.29 $4.65 $1.65 $18.74 $3.31 $1.65 $18.37 $2.88 $0.00 $0.04520 $0.04134 $0.03969 $0.03638 $0.03674 $0.03367 $0.04520 $0.04134 $0.03969 $0.03638 $0.03674 $0.03367 $184.28 $2.21 $178.11 Demand Charge: Monthly On-Peak Demand: Summer Winter Excess Demand (all months) CP-98-3C $56.51 $2.21 $58.72 CP TOU Basic Facilities Charge CP-98-2C $16.12 $5.77 $2.30 $0.05184