File Number: _______________ (For OSE Use Only) NEW MEXICO OFFICE OF THE STATE ENGINEER PROOF OF COMPLETION OF WORKS (SURFACE WATERS) 1. PERMITTEE Name: _________________________________________ Work Phone: ____________ Contact: _________________________________________ Home Phone: ____________ Address: _________________________________________ _________________________________________ City: _________________________________________ State: __ Zip: __________ 2. POINT OF DIVERSION (A, B, C, or D required, E or F if known) A. ____1/4 ____1/4 ____1/4 Section:____ Township:____ Range:____ N.M.P.M. in ______________________________________________________________ County. B. X =_____________ feet, Y = _________________ feet, N.M. Coordinate System __________ Zone in the ___________________________________________ Grant. U.S.G.S. Quad Map _____________ C. Latitude: ______d _____m _________s Longitude: ______d _____m _________s D. East __________ (m), North __________ (m), UTM Zone 13, NAD __ (27 or 83) E. Tract No. _____, Map No. _____ of the _______________ Hydrographic Survey F. Lot No. _____, Block No. _____ of Unit/Tract _____________________ of the ____________________ Subdivision recorded in ____________________ County. G. Other: __________________________________________________________________ H. Give State Engineer File Number if existing well: ______________________ I. On land owned by (required): ____________________________________________ J. Source of surface water supply: a. Name of ditch, acequia, or spring: ___________________________________ b. Stream or water course: ______________________________________________ c. Tributary of: ________________________________________________________ 3. CONSTRUCTED WORKS CONSIST OF: (Enumerate Diversion dams, main canals, headgates, pipelines, flumes, reservoirs, laterals, etc.)_________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ __________________________Do Not Write Below This Line________________________ File Number: _______________ Form: wr-22 Trn Number: _______________ page 1 of 4 File Number: _______________ (For OSE Use Only) NEW MEXICO OFFICE OF THE STATE ENGINEER PROOF OF COMPLETION OF WORKS (SURFACE WATERS) 4. DIVERSION DAM (if applicable) The diversion dam is constructed of _______________________________________; Crest length ________ feet; Crest width _________ feet; Height above stream bed ________ feet; Depth below stream bed ________ feet; Side slopes of ________ horizontal to 1 (one) vertical on upstream face And ________ horizontal to 1 (one) vertical on downstream face; And contains about ________ cubic yards of material. 5. HYDRAULIC PROPERTIES OF MAIN CANAL OR PIPELINE (if applicable) Name of ditch ____________________________________________________________ ; Bottom width ________ feet; Depth of water at full operating capacity _________ feet; Side slopes _________ horizontal to 1 (one) vertical; Diameter (pipe line or circular flume) ________ feet; Type of pipe line _________________________________________________________; Slope ________ feet per 1000 feet; Capacity ________ cubic feet per second; Length of canal or pipeline _________ feet. __________________________Do Not Write Below This Line________________________ File Number: _______________ Form: wr-22 Trn Number: _______________ page 2 of 4 File Number: _______________ (For OSE Use Only) NEW MEXICO OFFICE OF THE STATE ENGINEER PROOF OF COMPLETION OF WORKS (SURFACE WATERS) 6. HYDRAULIC PROPERTIES - STORAGE DAM (if applicable) Maximum storage capacity _________ acre feet; Maximum height above foundation _________ feet; length of crest _______ feet; Maximum width at base ________ feet; Crest width _________ feet; Slope of upstream face _____________________ horizontal to 1 (one) vertical; Slope of downstream face ____________________ horizontal to 1 (one) vertical; Elevation of crest of dam _____ feet; Elevation of spillway crest _____ feet; Elevation of flow line of outlet conduit ________ feet; Freeboard (above high water line at maximum spill) ________ feet; Width of spillway ________ feet; Discharge capacity of spillway ________ cubic feet per second; Location of spillway: _____________________________________________________; Cross-sectional area at maximum flow: ________ square feet; Size and character of outlet conduit _______________________________________ ___________________________________________________________________________; Type of dam, construction material, etc. ___________________________________ ____________________________________________________________________________ ____________________________________________________________________________ Elevation or (feet) depth above outlet ____________________ ____________________ ____________________ ____________________ ____________________ Area of Water Storage Capacity Surface, (Acres) (Acre Feet) __________ __________ __________ __________ __________ __________ __________ __________ __________ __________ Remarks _____________________ _____________________ _____________________ _____________________ _____________________ 7. CONSTRUCTION OF WORKS WAS COMPLETED: ____________ (mm/dd/year) 8. ADDITIONAL STATEMENTS OR EXPLANATIONS: ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ __________________________Do Not Write Below This Line________________________ File Number: _______________ Form: wr-22 Trn Number: _______________ page 3 of 4 File Number: _______________ (For OSE Use Only) NEW MEXICO OFFICE OF THE STATE ENGINEER PROOF OF COMPLETION OF WORKS (SURFACE WATERS) ENGINEER'S CERTIFICATE State of New Mexico County of ______________________________ I,_________________________ state that I am a qualified registered professional engineer, that I have inspected the works as above set forth and find them to be completed in accordance with the foregoing statement of facts; that they are properly and safely constructed and are now in a satisfactory conedition for acceptance. (Engineer’s Seal) Signed: _______________________________ License No.: _______________________________ _______________________________________________________________________________ ACKNOWLEDGEMENT (I, We) ____________________________________________________ affirm that the (Please Print) foregoing statements are true to the best of (my, our) knowledge and belief. _____________________________________ _____________________________________. Permittee Signature Permittee Signature __________________________Do Not Write Below This Line________________________ File Number: _______________ Form: wr-22 Trn Number: _______________ page 4 of 4