Highway Design Requirements

advertisement
Section 3
Prequalification Response Format
H-1 HIGHWAY DESIGN
Consists in the preparation of highway design, construction plans, and specifications in accordance with the NJDOT Design Manual and
AASHTO “A Policy on Geometric Design of Highways and Streets”.
Firm:
Staff
Requirements
Project Manager
1) w/ 4 years experience - Level A
2) w/ 4 years experience - Level B
a) w/ 1 year as PM
3) w/ 8 years experience - Level C
a) w/ 4 years as PM
PE – Highway
1) w/ 2 years experience - Level A
2) w/ 4 years experience - Level B
3) w/ 6 years experience - Level C
PE – Structural
1) w/ 2 years experience - Level A
2) w/ 4 years experience - Level B
3) w/ 6 years experience - Level C
Draftsperson
INSTRUCTIONS: List staff that meet requirements highlighting qualifications, experience, and training
certificates using format in Section 4.**
Level A
Staff
Level
Name
Level B
ER
Staff
Level
1.
1
Name
1.
1
1
1
NEW JERSEY DEPARTMENT OF TRANSPORTATION – DIVISION OF PROCUREMENT
PS11 – Jan. 2014
1.
1.
1.
1.
1
1.
1
ER
1.
1.
1.
Name
1
1
1
ER
1.
1
1
Level C
Staff
Level
1.
1
PAGE 1 of 3
H-1
Staff
Requirements
Designers
1) w/ 2 years experience - Level A
2) w/ 4 years experience - Level B
3) Level C
a) each individual has 6 years
experience in one or more of the
highway design tasks listed
below
b) as a group, 6 years combined
experience in all the highway
related tasks listed below
Structural Design ● Highway Design ●
Electrical Design ● Traffic Design ●
Geotechnical Design ● Hydraulic Design
● Right-of-Way Design ● Utilities
Design ● Permit Preparation
INSTRUCTIONS: List staff that meet requirements highlighting qualifications, experience, and training
certificates using format in Section 4.**
Level A
Staff
Level
Name
Level B
ER
Staff
Level
1.
Name
Level C
ER
Staff
Level
1.
Name
ER
1.
2.
2.
3.
4.
3.
1
4
5.
9
6.
4.
7.
8.
9.
NEW JERSEY DEPARTMENT OF TRANSPORTATION – DIVISION OF PROCUREMENT
PS11 – Jan. 2014
PAGE 2 of 3
H-1
INSTRUCTIONS: List the titles of projects that meet requirements using the format in Section 5 to report the specifics of the
listed projects. Projects must have been completed in the last ten years.**
Level A
Firm’s
Project
Requirements
CADD and
MicroStation
ER
Level B
1.
Two
Projects
Required
2.
ER
Level C
1.
Two
Projects
Required
2.
ER
1.
Two
Projects
Required
2.
Level A: resurfacing and/or rehabilitation of roadways, or improvement of intersections and have completed two
projects (100% design and construction).
Level B: grade separated interchanges, roadway widening, or new two-lane facilities and have completed two projects
(100% design and construction).
Level C: design of multi-lane, high-volume highways, and multi-level or multiple interchanges on existing or new
locations and have completed two projects (100% design and construction).
**Link for the Resume and Project Detail formats are found in Section 2 Page 6 on the PS11 Prequalification Form.
NEW JERSEY DEPARTMENT OF TRANSPORTATION – DIVISION OF PROCUREMENT
PS11 – Jan. 2014
PAGE 3 of 3
H-1
Download