Rule 002 Proposed changes for 2016 [Stakeholder: ______________________________] Instructions: (1) Please provide the name of your organization in the space provided above. (2) For each proposed change, please provide your organization’s viewpoint in the stakeholder comment boxes. If your organization is in favour of the proposed change, please state this for clarity. However, blank boxes will be interpreted as favourable comments. (3) Unless otherwise indicated, section references in this document refer to sections in AUC Rule 002. (4) The content of the column entitled Existing is quoted directly from the current version of AUC Rule 002. The content of the column entitled Proposed Changes reflects the wording proposed for the next version of the rule. (5) Bolding is used here when contents taken from the rule are bolded. (6) Yellow highlighting is used to draw attention to words or phrases that are proposed to change from the current version to the next version. (7) Please save and email a Word version of the document to regulatorypolicy@auc.ab.ca by November 24, 2015. Section Subsection 4 Measurements of performance and service quality standards for owners of electric distribution systems 4.1.4 Currency of tariff bill file content Existing Proposed changes Method of calculation of performance: Method of calculation of performance: Percentage of sites billed and coded regular billing cycle that are billed within the required eight business days = [(number of sites within original tariff bill files with a site production reason code of 2020 where the tariff bill file date created minus the current bill period end date for each site is less than or equal to eight business days) ÷ (the total number of sites with a site production reason code of 2020 in original tariff bill files)] x 100 Percentage of sites billed and coded regular billing cycle that are billed within the required eight business days = [(number of sites within original tariff bill files with a site production reason code of 2020 where the tariff bill file date created minus the current bill period end date for each site is less than or equal to eight business days) ÷ (the total number of sites with a site production reason code of 2020 in original tariff bill files – ineligible sites)] x 100 Where: Page 1 of 4 Stakeholder comment AUC response Section Subsection Existing Proposed changes Ineligible site = Site that was initially energized after its scheduled read date for the month. 4.1.5 Tariff bill file completeness Method of calculation of performance: Method of calculation of performance: Percentage of sites expected to bill on each billing cycle that are billed and coded regular billing cycle on their scheduled tariff bill file publish date = [(number of sites assigned to billing cycles and transmitted in original tariff bill files on their scheduled tariff bill file publish date with a site production reason code of 2020) ÷ (total number of sites expected to bill for those billing cycles)] x 100 Percentage of sites expected to bill on each billing cycle that are billed and coded regular billing cycle on their scheduled tariff bill file publish date = [(number of sites assigned to billing cycles and transmitted in original tariff bill files on their scheduled tariff bill file publish date with a site production reason code of 2020) ÷ (total number of sites expected to bill for those billing cycles – ineligible sites)] x 100 Where: Ineligible site = Site that was initially energized after its scheduled read date for the month. 5 Performance categories and standards for gas distributors 5.1.4 Currency of tariff bill file content Method of calculation of performance: Method of calculation of performance: Percentage of sites billed and coded regular billing cycle that are billed within the required eight business days = [(number of sites within original tariff bill files with a site production reason Percentage of sites billed and coded regular billing cycle that are billed within the required eight business days = [(number of sites within original tariff bill files with a site production reason Page 2 of 4 Stakeholder comment AUC response Section Subsection Existing Proposed changes code of 2020 where the tariff bill file date created minus the current bill period end date for each site is less than or equal to eight business days) ÷ (the total number of sites with a site production reason code of 2020 in original tariff bill files)] x 100 code of 2020 where the tariff bill file date created minus the current bill period end date for each site is less than or equal to eight business days) ÷ (the total number of sites with a site production reason code of 2020 in original tariff bill files – ineligible sites)] x 100 Where: Ineligible site = Site that was initially energized after its scheduled read date for the month. 5 Performance categories and standards for gas distributors 5.1.5 Tariff bill file completeness Method of calculation of performance: Method of calculation of performance: Percentage of sites expected to bill on each billing cycle that are billed and coded regular billing cycle on their scheduled tariff bill file publish date = [(number of sites assigned to billing cycles and transmitted in original tariff bill files on their scheduled tariff bill file publish date with a site production reason code of 2020) ÷ (total number of sites expected to bill for those billing cycles)] x 100 Percentage of sites expected to bill on each billing cycle that are billed and coded regular billing cycle on their scheduled tariff bill file publish date = [(number of sites assigned to billing cycles and transmitted in original tariff bill files on their scheduled tariff bill file publish date with a site production reason code of 2020) ÷ (total number of sites expected to bill for those billing cycles – ineligible sites)] x 100 Where: Ineligible site = Site that was initially energized after its scheduled read date for the Page 3 of 4 Stakeholder comment AUC response Section Subsection Existing Proposed changes month. Appendix C – ATCO Electric Ltd. ATCO Electric Ltd. SAIFI and SAIDI service standards for owners of electric distribution systems subject to this rule Maximum SAIFI excluding major events: Maximum SAIFI excluding major events: 2.69 or less 2.69 2.39 or less Maximum SAIDI excluding major events: Maximum SAIDI excluding major events: 8.86 or less 8.86 8.12 or less AltaGas Utilities Inc. AltaGas Utilities Inc. (1) (1) Appendix F – Alberta gas distributors’ emergency response service standards 65 per cent or greater of emergencies responded to within 60 minutes; 65 70 per cent or greater of emergencies responded to within 60 minutes; Page 4 of 4 Stakeholder comment AUC response