STATEMENT OF REASONS
Central Ranges Pipeline Gas Network
Annual Tariff Variation 2014–15
The Australian Energy Regulator has approved annual tariff variations for the Central Ranges
Pipeline Gas Network in accordance with Part 3B sections 3.2, 3.3, 3.4, 3.4A and Part 3C
clause 3.5A of the 2005 access arrangement (the access arrangement1). The access
arrangement sets out a price path over a five year period. The approved tariffs are consistent
with the price path established by the access arrangement and approved by the AER at the
time of the last gas price review.
The reasons for allowing the tariff variations are that:

We are satisfied that Central Ranges Pipeline Gas Network has correctly applied the
approved variation method to calculate the reference tariffs in accordance with Part
3B of the access arrangement. The approved tariff variation method consists of an
escalation formula whereby the reference tariffs are escalated by the change in the
average of the CPI for the four quarters to December on a year on year basis
multiplied by the previous year’s approved reference tariff.
Approved reference tariffs for 2014–15
Special contract
transportation service
Contract transportation
service
I & C transportation service
Domestic transportation
service
1
Charge in $/GJ (excl. GST)
Charge in $/GJ (incl. GST)
0.06
0.07
1.62
1.78
2.01
2.21
4.71
5.18
See
http://www.apa.com.au/media/140844/access%20arrangement%20cenrral%20ranges%20network%20amended
%20august%20and%20october%202008.pdf

We are satisfied that Central Ranges Pipeline Gas Network has correctly applied the
approved variation method to calculate charges for ancillary services in accordance
with Part 3C clause 3.5A of the access arrangement. The approved tariff variation
method consists of an escalation formula whereby the reference tariffs are escalated
by the change in the average of the CPI for the four quarters to December on a year on
year basis multiplied by the previous year’s approved reference tariff.
Approved ancillary service charges for 2014–15
Request for service
Special meter read
Meter testing service
Domestic customer
disconnection fee
I & C contract and special
contract customer
disconnection fee
After hours reconnection
service
Charge in $ (excl. GST)
71.52 plus 71.52 per hour
after the first hour
42.90
247.93
Charge in $ (incl. GST)
78.67 plus 78.67 per hour
after the first hour
47.19
272.72
89.39
98.33
357.57
393.33
119.20
131.12