RED FLAG CHECKLIST Complete this checklist for projects that do not go through the MnDOT scoping process or were scoped prior to March 2015. For projects currently being scoped, complete the TMP Scoping Worksheet, which includes the Red Flag Checklist, Work Zone Impact Assessment Worksheet, and TMP Scoping Conclusions). Prepared By: Date: Project Information: SP: TH: Let Date: Project Length: Project Description (work type, area type, anticipated duration): Yes No Needs further study N/A Comments 1. Is the existing shoulder in good enough condition to support traffic during construction? 2. Could temporary structures and/or additional width be needed on culverts, bridges or shoulders to maintain traffic on the existing route or a detour route? 3. Is there a pedestrian/bicycle path, trail, or access that needs to be maintained during construction? 4. Will a Temporary Pedestrian Access Route (TPAR) be required (route meets ADA and PROWAG standards)? 5. Are there critical features or services on the route that need to be considered (e.g. hospital, emergency services, transit, school buses)? 6. Could crossovers be needed? 7. Are there any issues regarding construction timeframes (e.g. time of day, time of year limits, major events, permits, bird nesting, fish spawning, high water)? Red Flag Checklist SP XXXX-XX Page 1 of 4 6/22/2015 tjd Yes No Needs further study N/A Comments 8. Could there be a need to maintain railroad traffic? 9. Might temporary traffic signals be required? 10. Does it appear that maintenance of traffic will require additional right-ofway? 11. Will/Can the traffic be detoured? If yes, list proposed routes and answer the following: a. Is the local alternate detour route in good condition? b. c. d. e. Will the detour route have a detrimental impact on emergency vehicles, school buses, or other sensitive traffic? Are there bridge/culvert width or height restrictions on the detour? Are there issues regarding the suitability of the detour route (load limit restrictions, length, speed limit, travel time, etc)? Are modifications needed at intersections on detour/alternate routes? 12. Could construction have business impacts that could affect project staging and/or require mitigation? 13. Could Intelligent Work Zone (IWZ) devices be needed to mitigate traffic impacts? Red Flag Checklist SP XXXX-XX Page 2 of 4 6/22/2015 tjd Yes No Needs further study N/A Comments 14. Could moveable barrier be needed/desirable to mitigate traffic impacts or for constructibility? 15. Are there other projects in the area that should be coordinated or avoided? 16. Are there geotechnical issues (poor soils, contaminated material, etc) that may affect construction? 17. Are there utility issues that may affect construction staging? 18. Is the delay to traffic anticipated to be greater than 10 minutes? 19. Could the project benefit from innovative contracting (if Yes, contact OCIC to schedule a procurement method selection meeting)? Red Flag Checklist SP XXXX-XX Page 3 of 4 6/22/2015 tjd Consideration of Accelerated Bridge Construction (ABC) Techniques Complete this section if project includes bridge construction (this checklist may need to be completed multiple times if multiple bridges with different staging complexity are included in project). Bridge No.: SP: TH: Question/Issue ADT On: Yes No Needs further study ADT Under: N/A Comments 20. Is it likely that this project will include complex traffic control schemes, long detours, or significant user impacts due to bridge construction? 21. Is it likely that this project will have an extended duration (more than one construction season, or extend into late fall) due to bridge construction? 22. Is bridge construction on the critical path of this project? 23. Does the existing bridge have features that make it difficult to accommodate staging (truss bridge, slab span, beam spacing issues, etc)? 24. Are there significant risks or other factors (site complexity) that could be mitigated by accelerating bridge construction? ABC Consideration Conclusion**: Based on the findings & comments above, further consideration of accelerated bridge construction is warranted: YES NO Project Manager Name: ___________________________ Date: ___________ If further consideration is warranted the Project Manager should contact the Bridge Office Preliminary Plans Unit and the Regional Bridge Construction Engineer for assistance in selecting appropriate ABC alternatives and techniques. **Please send a completed copy of this page to the Preliminary Plans Unit at MS 610. Red Flag Checklist SP XXXX-XX Page 4 of 4 6/22/2015 tjd