Uthungulu

advertisement
UTHUNGULU
DISTRICT MUNICIPALITY
PROFILE
1
TABLE OF CONTENTS
1.
1.1
1.2
1.3
1.4
2.
2.1
2.2
2.3
2.4
2.5
2.6
3.
4.
4.1
4.1.1
4.1.2
4.1.3
5.
6.
7.
EXECUTIVE SUMMARY
INTRODUCTION
Overview
Municipalities within the District
Political and Administrative Leadership and Seat of District
Political Representation
SERVICE DELIVERY
Household Infrastructure
Sanitation
Water
Electricity
Refuse Removal
Service Provider
AUDIT OPINIONS
STATE OF LOCAL GOVERNMENT ASSESSMENT
Overview of findings on assessment in the Municipality
Governance
Financial Management and Viability
Service Delivery
INFRASTRUCTURE PRIORITIES IN TERMS OF THE MUNICIPAL
TURN-AROUND STRATEGY
MIG PROJECTS
VULNERABILITY CLASSIFICATION
2
3
4
4
5
6
6
7
7
7
7
8
8
8
8
9
9
9
10
10
10
12
16
EXECUTIVE SUMMARY
Uthungulu District Municipality is situated in northeastern KwaZulu-Natal and is made
up of the six local municipalities. The significant economic centres that shape the district
are Richards Bay with its harbour facilities which have been the prime reason for largescale industrialisation in the district, and Empangeni, an industrial and service centre.
However, pockets of wealth in these centres are surrounded by vast areas where many
people live in abject poverty.
There are enormous backlogs in service infrastructure, especially in rural areas. An
overview of household access to infrastructure in the district shows an improvement in
access from 36% in 1996 to 53% in 2009. Water and electricity infrastructure are the
main contributor to the improvement in the district’s infrastructure in general.
All municipalities in Uthungulu district except Mfolozi improved their audit outcomes
over time to obtain financially unqualified audit outcomes. Mfolozi achieved qualified
and disclaimers between 2005/6 and 2009/10.
Uthungulu District was not highlighted in the KwaZulu-Natal State of Local Government
Assessment as in the most serious category of classification of municipalities. Three of
the local municipalties (uMhlatuze, Mfolozi and Nkandla) have been identified as facing
serious challenges in terms of governance, while Nkandla also had serious challenges
on financial management and service delivery.
In terms of its Municipal Turn-Around Strategy the Uthungulu District Municipality
identified the need for bulk infrastructure in the rural areas, as well as maintenance of
existing urban infrastructure. There is also a need for a regional site for waste disposal
from the local municipalities.
Two of the six local municipalities in the Uthungulu District have been classified as in
the category of most vulnerable by DCoG in terms of functionality, socio-economic
profile and backlog status. This profile confirms that infrastructure prioritisation in
Uthungulu District should focus on a dual strategy of urban infrastructure maintenance
and replacement, and addressing rural backlogs in water and sanitation, including bulk
infrastructure development.
3
1.
INTRODUCTION
1.1 Overview1
Uthungulu District Municipality is situated in northeastern KwaZulu-Natal and is made
up of the six local municipalities of Mbonambi, uMhlathuze, Ntambanana, uMlalazi,
Mthonjaneni and Nkandla.
A flat coastal region comprises the Natal coastal belt and the Zululand coastal plain.
Inland, the lowveld to the northeast and the Eshowe block to the west are hilly. To the
northwest the terrain is more extreme, with steeply incised valleys.
The N2 highway is a link to other economic centres, in particular the national economic
powerhouse, Gauteng Province. The most important rail link is the coal line from
Mpumulanga Province via Vryheid to the Richards Bay coal terminal.
The significant economic centres that shape the district are Richards Bay, whose
harbour facilities are world class and have been the prime reason for large-scale
industrialisation in the district, and Empangeni, an industrial and service centre whose
higher-order services attract people from many rural settlements. However, pockets of
wealth in these centres are surrounded by vast areas where many people live in abject
poverty. Rural poverty, rampant crime and the HIV/AIDS pandemic are major
challenges to be met. Richards Bay has been identified as an industrial development
zone and this is sure to boost economic activity and attract jobseekers. The district has
a climate conducive to agriculture and tourism and has significant natural resources.
Major land uses are commercial agriculture (sugar-cane in the low-lying coastal belt and
citrus, vegetables and subtropical fruit in irrigated areas), forestry (mainly in non-tribal
areas), mining, traditional farming, urban areas that are expanding and industrial
development in the Empangeni-Richards Bay complex. Manufacturing is the largest
contributor to the economy (51%), followed by transport (15.1%) and agriculture (9.5%),
although the community, social and personal services sector provides the most people
with employment, with agriculture second and wholesale and retail trade third.
The district is characterised by low levels of urbanisation; approximately 80% of the
population of 8213.39 live in the rural areas. More than 50% of the population is
younger than 19 years. Thirty-one percent have no formal schooling. A further 18%
entered the schooling system but left before completing primary school. Only 6% have a
tertiary education. Employment stands at 23.84% and unemployment at 24.18%, while
51.99% are not economically active. The road infrastructure is under increasing
pressure, particularly from heavy vehicles. The John Ross Highway and the adjacent
network are simply not able to keep pace with demands placed on them; in addition,
who is responsible for provincial and municipal roads still needs to be clarified.
Source: Gaffney’s, November 2009: Local Government in South Africa 2009 – 2011, Official Yearbook:
p 863 - 864
1
4
There are enormous backlogs in service infrastructure, especially in rural areas. For
example, 41% of households have no access to piped water and only 17% have water
inside their dwelling. Thirty-five percent use pit latrines, mostly without ventilation, and
28% have no sanitation provision at all. Just over half of the population has electricity
for lighting, while 42% still rely on candles. Small numbers use other sources such as
gas, paraffin or solar generation.
There is a high demand for health services. AIDS-related deaths are unacceptably high,
especially among young people; however, there needs to be more community
involvement with regard to awareness campaigns. Recreational facilities are also
needed, but development is hindered by a lack of finance and a general sentiment that
these are not a priority.
The district has a broad-based tourism appeal, from bird-watching to luxury
accommodation and cultural events.
Tourism development is focused on coastal resources, eco-tourism, wildlife and
hunting. The core theme of the provincial strategy is Zulu culture and heritage and the
district needs to tap into this. The major resources to promote eco-tourism include
nature reserves at uMlalazi, Amatikulu, Enseleni, Ongoye Forest, Dlinza Forest and
Nkandla Forest.
The rugged terrain presents an opportunity to open up 4 x 4 trails.
1.2
Municipalities within the Uthungulu District
The details of the six local municipalities within Uthungulu District are tabled below:
Table 1: Statistics of the Uthungulu District and Local Municipalies
Municipalities within the
District
Area (km²)
in 2009
Area (km2) after 2011
Local Govt Elections
& % change
Population
No. of
Households
Poverty Rate
uThungulu District Municipality
8,213.39
8,213.39
-
905,382
186,806
62.50%
Mfolozi (Mbonambi) Local Municipality
1,209.98
1,209.98
-
119,548
21,902
55.82%
Mthonjaneni Local Municipality
1,085.97
1,085.97
-
47,592
10,805
57.83%
Nkandla Local Municipality
1,827.58
1,827.58
-
129,040
22,666
72.76%
Ntambanana Local Municipality
1,082.75
1,082.75
-
95,359
15,029
56.65%
793.18
793.18
-
336,288
82,015
60.13%
2,213.94
2,213.94
-
177,555
34,389
71.81%
uMhlathuze Local Municipality
uMlalazi Local Municipality
5
1.3
Political and Administrative Leadership and Seat of District2
Political Leadership: Executive Mayor: Ms TVB Nchunu
Administrative Leadership: Acting Municipal Manager: Mr D Nubbe
The head office of the District is located in Richards Bay.
1.4
Political representation3
Table 2: Local Government Election 2006 / Provincial & National Elections 2009
comparison:
Leading
Parties in
the
Elections
1st
2nd
3rd
4th
Local Government Elections 2006
Party
Party Votes and
Ward Votes and
%
%
IFP
ANC
DA
ACDP
Other
Totals
112,793
57,623
6,181
745
6,180
183,522
61.5%
31.4%
3.4%
0.4%
3.4%
100%
112,963
56,984
6,193
656
6,869
183,665
61.5%
31.0%
3.4%
0.4%
3.7%
100%
Councillor Seats
Party
Seats %
IFP
ANC
DA
FEDCO
Other
Totals
23
13
2
1
59.0%
33.3%
5.1%
2.6%
39
100%
Provincial Elections 2009
Party
Votes and %
ANC
IFP
DA
COPE
Other
181,521
112,030
11,033
1,353
5,433
311,370
58.3%
36.0%
3.5%
0.4%
1.7%
National Elections 2009
Party
Votes and %
ANC
IFP
DA
COPE
Other
100%
188,508
102,825
13,942
1,624
6,606
313,505
Figure 1: 2011 Local Government Election results and seat allocations:
The ANC is the leading party in terms of proportional DC40 Seats in Uthungulu, with 9
seats of 17 seats.
2
3
Source: Uthungulu DM; August 2011
UPDATE Aug’09: DC40 seats - IFP(63%) 10 seats, ANC(31%) 5 seats, DA(6%) 1 seat, Total 16 DC40 seats
6
60.1%
32.8%
4.4%
0.5%
2.1%
100%
2.
SERVICE DELIVERY4
2.1
Uthungulu District Municipality Household Infrastructure
Household Infrastructure Overview
KZN - DC28 Uthungulu District Municipality
0.80
0.70
0.60
0.50
Index
0.40
0.30
0.20
KZN - DC28…
South Africa
0.10
0.00
1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Source: IHS Global Insight Regional eXplorer version 574
Uthungulu district has got the third highest access to infrastructure amongst the districts
in the province. An overview of household access to infrastructure in the district shows
an improvement in access from 36% in 1996 to 53% in 2009. Water and electricity
infrastructure are the main contributor to the improvement in the district’s infrastructure
in general.
2.2
Sanitation
With regard to access to sanitation, the district municipality’s household access to
hygienic toilets has gone up from 31% in 1996 to 46% in 2009. The improvement in
access to sanitation in general in the Municipality is mainly due to the increase in the
use of pit latrines with ventilation which was around 15% in 2009.
2.3
Water
Water infrastructure is the main contributor to the improvement in the district’s
infrastructure in general. Access to piped water above RDP level increased from 29% to
69% from 1996 to 2009. Similarly, there has been a slight increase as well in access to
4
Sources: IHS Global Insight Regional eXplorer version 574 and Municipal Demarcation Board, 2008:
National Report on Local Government Capacity, District and Local Municipalities, MDB Capacity
Assessment, 2007/2008.
7
piped water below RDP level. About 20% of the households do not have access to
piped clean water at all.
2.4
Electricity
The increase in electricity connections is the second biggest infrastructure achievement
in the municipality. In 1996, household access to electricity connections was at a lower
level of 39%. Access has, however, increased over the years by almost 36% reaching
75% by 2009.
2.5
Refuse removal
Access to formal refuse removal service decreased slightly from 23% in 1996 to 22% in
2009 in the District Municipality. While this is the case, personal refuse removal went up
over the years reaching 55% in 2009. The high levels of personal refuse removal must
be taken in the context of low settlement densities, where on-site disposal or backyard
burning of waste is sometimes appropriate.
2.6
Service provider
Uthungulu district does not have authority and does not perform the electricity
reticulation function. The district, however, has authority and performs potable water
and sanitation functions. The district has no authority and is not performing the refuse
removal, refuse dumps and solid waste disposal function.
3.
AUDIT OPINIONS
Table 3: Audit Opinions of the District and Local Municipality
Municipality
Uthungulu
DM
Mfolozi LM
(previously
Mbonambi)
Mthonjaneni
LM
Audit
Opinion
2005/6
Financially
unqualified
with other
matters
Qualified
Audit
Opinion
2006/7
Financially
unqualified
with other
matters
Disclaimer
Audit
Opinion
2007/8
Financially
unqualified
with other
matters
Disclaimer
Audit
Opinion
2008/9
Financially
unqualified
with findings
Audit
Opinion
2009/10
Financially
unqualified
with findings
Disclaimer
Qualified
Qualified
Financially
unqualified
with other
matters
Disclaimer
Financially
unqualified
with findings
Financially
unqualified
with findings
Disclaimer
Financially
unqualified
with other
Financially
unqualified
with findings
Financially
unqualified
with findings
Financially
unqualified
with findings
Nkandla LM
Disclaimer
Financially
unqualified
with other
matters
Qualified
Ntambanana
LM
Disclaimer
Qualified
8
matters
City of
Qualified
Financially
Financially
uMhlathuze
unqualified
unqualified
LM
with other
with other
matters
matters
Umlalazi LM Qualified
Disclaimer
Financially
unqualified
with
other
matters
Source: Auditor-General 2009 and 2011, see. www.agsa.co.za
Financially
unqualified
with findings
Financially
unqualified
with findings
Financially
unqualified
with findings
Financially
unqualified
with findings
Mfolozi failed to secure a financially unqualified audit outcome in the period from 2005/6
to 2009/10. On the other hand, between 2005/6 and 2009/10 Uthungulu district
consistently received financially unqualified audit outcomes. In the five financial years
from 2005/6 to 2009/10 Nkandla secured a financially unqualified audit outcome once.
The two municipalities, Mthonjaneni and City of uMhlathuze, following qualified opinions
in 2005/6 they managed to secure financially unqualified audit outcomes from 2006/7 to
2009/10.
4.
STATE OF LOCAL GOVERNMENT ASSESSMENT
4.1
Overview of findings on assessment in the municipality
Uthungulu District was not highlighted in any specific category as in the most serious
category of classification of municipalities, which seem to indicate that challenges are
moderate. Three of the local municipalities (uMhlatuze, Mfolozi (Mbonambi), Nkandla)
have been identified as facing serious challenges. These challenges are discussed in
more detail below.
4.1.1 Governance
uMhlatuze Local Municipality is one of 17 municipalities in KwaZulu-Natal affected by
political instability. The Provincial Report lists a number of causes of political instability
including: the lack of understanding and adherence to the roles and responsibilities of
political office bearers, interference in council matters from the regional and provincial
political structures, a lack of deliberations on matters in council, domination of some
councils by politically powerful administrations, power struggles between political office
bearers from same party and a lack of communication and public participation
frameworks creates environment for uncoordinated interaction with community.
uMhlatuze Local Municipality is one of 8 municipalities in KwaZulu-Natal facing serious
challenges in the political and administrative interface. According to the Provincial
Report the most recorded complaint by stakeholders is the tendency to appoint
politically aligned Municipal Managers and Section 57 Managers. Some of the other
reasons for a poor relationship between the political and administrative components
which negatively affects service delivery are: councillors getting over-ruled by officials;
political office bearers interfering in administrative function, lack of strategic direction on
service delivery by council due to poor leadership and focus on political rule in council;
and staff forced to show political alliance to ensure job security.
9
Mfolozi (Mbonambi) Local Municipality and Nkandla Local Municipality are of 24
councils that do not seem to perform any oversight function and should be supported to
implement the oversight role. The Provincial Report states that the lack of Councillor
Oversight has emerged as the single most contributing factor to poor governance and
service delivery. A large number of Councillors appear not to appreciate the nature and
importance of their oversight role and the administration seem to ignore the need for
oversight due to the administrative and accountability implications it will have for them.
4.1.2 Financial Management and Viability
Nkandla Local Municipality is also one of 30 municipalities in KwaZulu-Natal that are
facing serious financial management challenges. The Provincial Report lists some of
these concerns, including: poor financial planning, inadequately skilled staff appointed,
lack of proper financial controls, poor financial competencies of elected representatives,
and unemployment and poverty had a negative effect on credit control and income.
There is also a general perception that councils are not transparent when it comes to
financial policies and activities and that the reason for this is to hide their corrupt
practices from the public.
4.1.3 Service Delivery
Twenty municipalities in KwaZulu-Natal, including Nkandla Local Municipality are
experiencing serious service delivery challenges. The Provincial Report is of the view
that the allocation of powers and functions between the different categories of
municipalities is impeding service delivery. This factor, coupled with the lack of
adequate funding and objective prioritisation of needs, appear to be the major factors
giving rise to service delivery challenges.
5.
INFRASTRUCTURE PRIORITIES OF THE MUNICIPAL TURN-AROUND
STRATEGY
The Uthungulu District Municipality identified a number of priorities for infrastructure
delivery in the Action Plan for the Uthungulu Turn-Around Strategy. The need exists for
bulk infrastructure in the rural areas, as well as maintenance of existing urban
infrastructure.
Table 4: Infrastructure delivery in terms of the MTAS
Potable Rural
Water
Challenges
Rural Water:
45% backlogs
55% access
Ageing urban
infrastructure
(O&M of
towns)
Ageing
infrastructure in
towns could
impact on
10
Sanitation,
domestic waste
water and
sewage
disposal
system
Rural Sanitation:
50% backlog
Require
Solid Waste
disposal
District
responsible for
regional site.
Municipal
Actions
District in
process of bulk
infrastructure
development
backlogs figures
maintenance
and upgrade of
urban facilities
Tariffs cannot
recoup all the
expenses
incurred and
loan
responsibilities.
Urban
infrastructure
maintenance and
replacement
WSDP review
Additional
funding from
govt
Construct new
site to receive
waste from 5
municipalities
Policy issue to
be reconsidered
with regard to
digging of pit
latrines (sweat
equity)
Landfill Site
Master Plan for
regional site
WSDP review
Additional
funding
requested from
government
Borehole plan
outside supply
areas
Exploration of
revenue
generating
activities at
landfill site
Regional solid
waste – loan to
be repaid.
Tanker reduction
strategy for
drought affected
areas – medium
to long term
supply rather
than tankers
Consider tariffs
and aggressively
increase such in
all areas.
Need approval
for upgrade of
permit for
recycling and
energy
abstraction –
upgrade permit
from GMB+ to
Hh
Other support
and
interventions
Increased MIG
and other
funding to
eliminate
backlogs R500million per
annum for target
Additional MIG
funding for
operations and
maintenance
(policy issue)
Application to
Netherlands for
11
Funding to
eliminate
backlogs
Additional MIG
funding for
maintenance
Appropriate
feasibility studies
to be undertaken
Expedite permit
upgrade and
investigate
options for
income
generation
Enforcement
Additional MIG
funding for
operations and
maintenance
(policy issue)
additional grant
funding
Application to
Netherlands for
additional grant
funding
Application to
Netherlands for
additional grant
funding
from DAEA on
waste permits to
ensure sustained
volumes at site
and decrease
pollution
impacts.
Approach funder
s to fund
feasibility study
Review of
policies relating
to water
abstraction by
DWAF (policy
issue)
Policy issue:
MIG funding only
for RDP level
service while
yard services
are provided.
6.
MIG PROJECTS5
Table 5: MIG projects
Municipality
Mfolozi
(Mbonambi)
LM
Project name
Tshingimpisi Community
Hall Ward 6
Shwashweni Community
Hall
Pay Point Shelters and
Toilets
Mabuyeni Library (Ward 7)
Manzamnyama Library
(Ward 1)
Mkhayideni Library (Ward
6)
Cinci Pension Pay Point
Shelter Ward 4
Mbabe Pension Pay Point
Shelter Ward 8
Ontinqweni Pension Pay
MIG funds
Actual
expenditure in
the 2010/11
financial year
Project status
(Registered/d
esign/tender/c
onstruction)
R 1,029,400.00
R 245,918.33
Construction
R 1,029,400.00
R 271,174.45
Construction
Multi purpose
community halls
Multi purpose
community halls
R 3,137,750.00
R 732,000.00
R 393,209.81
R 133,983.20
Construction
Construction
Local Amenities
Libraries
R 732,000.00
R 202,603.42
Construction
Libraries
R 732,000.00
R 107,659.89
Construction
Libraries
R 900,000.00
R 364,190.76
Construction
Local Amenities
R 900,000.00
R 900,000.00
R 445,051.94
R 605,491.48
Construction
Construction
Local Amenities
Local Amenities
5
Project category
(e.g. water,
sanitation, PMU)
According to June 2011 non-financial report on Municipal Infrastructure Grant, KwaZulu-Natal has not adopted
the new format of reporting on MIG projects. As a result, it becomes a challenge to track the implementation of
MIG projects in that province.
12
Point Shelter Ward 3
Ocilwane Pension Pay
Point Shelter Ward 13
Mfolozi Creches in Wards
2,3,4,5,8,9,10,11 and 13
Bus Shelters (Emakhosini
and Thuthukani) Ward 8
Mfaniso
Bulimeni Library - Ward 04
Mfolozi Crèches in Wards
06,07,09 and 13
City of
uMhlathuze
LM
Nkandla LM
R 900,000.00
R 490,940.96
Construction
Local Amenities
R 6,686,263.81
R 4,862,185.04
Construction
Child care fac
R 109,440.00
R 840,000.00
R 109,440.00
R 309,218.04
Bus Shelters
Libraries
R 2,739,769.02
R 2,214,186.97
Construction
Registered
Design &
Tender
Ngome Road - Ward 1
R 922,716.00
R 843,117.44
Registered
Sabhuza Road - Ward 10
Sport Fields - Ward 01
(Ediphini), Ward 05
(Sizanani), Ward 08
(Sigaganeni)
Msunduze to Mthwana
Road - Ward 11
R 922,716.00
R 828,021.05
Registered
R 637,985.50
R 637,985.50
Registered
R 922,716.00
R 733,094.23
Registered
Nhlangwini Road - Ward 12
Mbonambi VIP Sanitation
Phase 2 (AFA1) MIS
171353
Kwambonambi low cost
housing water
Mbonambi CWSS Phase 2
Mkhwanazi South/ Dube
Sanitation Phase 2 (AFA)
MIS 166771
Madlebe Reticulation Water
Supply Phase 3 (AFA) MIS
186370
Mkhwanazi North Phase 5
Water Supply
uMhlathuze Rural
Sanitation
PMU
Upper Nseleni Bulk Water
and Reticulation Ph 1,2 &3
(AFA) MIS 149395, 189754
Nkandla Business Park
Mahlayizeni
Matshenezimpisi Road
Rehabilitation
Nkandla SMME Park –
Ward 5
CBD Roads, Stormwater,
Water and Sewerage
upgrade
R 922,716.00
R 592,190.11
Registered
Sport Facility
Road &
Stormwater
Road &
Stormwater
R 18,433,582.00
R 646,811.61
Completed
Sanitation
R 2,291,000.00
R 27,901,268.00
R 51,136.42
R 4,504,010.22
Construction
Construction
Water
Water
R 33,080,000.00
R 14,974,678.24
Completed
Sanitation
R 44,537,859.00
R 16,128,289.00
Completed
Water
R 50,433,571.14
R 805,248.36
Completed
Water
R 314,012,490.00
R 25,926,118.95
R 1,534,665.45
Construction
Sanitation
Other
R 91,746,101.00
R 3,100,000.00
R 7,708,063.12
R 979,235.90
Construction
Completed
Water
Markets
R 5,100,000.00
R 230,285.70
Construction
Road &
Stormwater
R 2,499,297.00
R 1,589,772.63
Construction
Markets
R 6,349,422.33
R 5,215,388.96
Construction
Idlangeza Access Road
Construction of Nkandla
CBD Community Sidewalks
R 4,000,000.00
R 3,904,467.87
Construction
R 2,340,000.00
R 1,499,351.80
Construction
Upgrading of Cemeteries
R 4,781,140.00
R 2,665,738.81
Construction
Ntshamanzi Causeway
R 2,699,171.32
R 1,860,663.39
Ndikwe Causeway
Kwaseyane Causeway
R 2,202,526.99
R 2,199,999.00
R 157,184.84
R 2,199,999.00
Construction
Design &
Tender
Completed
13
Child care fac
Road &
Stormwater
Road &
Stormwater
Road &
Stormwater
Road &
Stormwater
Sidewalks
Cemeteries /
Crematoriums
Road &
Stormwater
Road &
Stormwater
Road &
Ward 1
Ezilozini Causeway Ward
13
Maphuthu Access Link
Road Rehabilitation - Ward
10
Mdlelanga - Community
and Crèche Facility (Ward
11)
Ezimpisini (KwaGugu) Community and Crèche
Facility Ward 8
PMU
Middledrift: Bulk Water
Supply Phase 2 (AFA) MIS
179100
Vutshini Phase 2 Bulk
Water Supply
Nkandla Phase 3 VIP
Sanitation
Middledrift SSA5 Bulk
Water and Reticulation
Middledrift SSA3 Water
Umlalazi LM
Fire Station at Mtunzini
(AFA) MIS 176557
Fire Station at Gingindlovu
Izingwenya Sports Field
(AFA)
Nkanini Sportsfield (Ward
7) (AFA1) MIS 161011
Ncekwane Sportsfield
(Ward 23) (AFA) MIS
161014
eSwohlweni Community
Hall Ward 21 (AFA1)
Mombeni Low Level
Causeway
Upgrade of Gingindlovu
Taxi Rank Ward 18 (AFA1)
163438
Construction of Ward 4
Pedestrian Bridge
D135 Kwakhosa Road
Ward 15 (AFA) MIS
167242
Shakaland Road
Rehabilitation P248 (Ward
26) (AFA2) MIS 167238,
177115
Mpungose Sports Field
(Ward 9)
Construction of Ethondo
Causeway Ward 21
Construction of KSD
Sunnydale Pedestrian
Bridge Ward 12
Construction of Nhlababo
Causeway and Road
Construction of Ntontonto
River Causeway (Ward 25)
Ncekuya Creche Ward 3
GRAVELLING OF NGOJE
Stormwater
Road &
Stormwater
R 3,804,283.99
R 346,189.84
Design &
Tender
R 6,823,680.50
R 525,329.05
Design &
Tender
Road &
Stormwater
R 3,361,150.00
R 305,864.65
Registered
Child care fac
R 3,361,150.00
R 305,864.65
R 103,480.00
R 88,158,778.00
R 7,603,745.12
Construction
Water
R 19,804,998.28
R 3,851,139.48
Construction
Water
R 21,318,327.15
R 7,023,986.67
Construction
Sanitation
R 208,304,337.00
R 2,732,712.03
Registered
Water
R 40,805,279.54
R 401,643.38
Registered
Water
R 954,269.00
R 299,701.00
R 556,591.09
R 4,468.07
Completed
Completed
Fire fighting
Fire fighting
R 583,620.00
R 20,732.66
Completed
Sport Facility
R 1,012,632.00
R 44,413.48
Completed
Sport Facility
R 1,001,916.00
R 35,125.95
Completed
R 1,119,292.40
R 39,826.70
Completed
R 1,171,702.00
R 313,285.11
Completed
Sport Facility
Multi purpose
community halls
Road &
Stormwater
R 4,177,777.00
R 516,478.54
Completed
R 770,000.00
R 34,195.10
Completed
Taxi Ranks
Road &
Stormwater
R 1,689,668.00
R 685,879.26
Construction
Road &
Stormwater
R 11,211,429.00
R 458,872.34
R 1,025,124.00
R 9,109.68
Completed
Design &
Tender
R 885,313.00
R 105,034.40
Completed
R 800,000.00
R 6,208.41
Completed
R 1,400,000.00
R 521,808.78
Completed
R 750,000.00
R 501,000.00
R 584,820.00
R 8,382.95
R 465,592.74
R 513,000.00
Completed
Construction
Construction
14
Design &
Tender
Child care fac
Other
Road &
Stormwater
Sport Facility
Road &
Stormwater
Road &
Stormwater
Road &
Stormwater
Road &
Stormwater
Child care fac
Road &
ROAD (WARD 8)
NKANINI COMMUNITY
HALL (WARD 7)
Eshowe Waste Transfer
Station (AFA) MIS 188813
MATUSHITSWO
CAUSEWAY (WARD 24)
Mthonjaneni
LM
Ntambanana
LM
R 1,191,880.00
R 846,650.79
Construction
R 7,888,349.31
R 7,370,014.13
Completed
R 682,290.00
R 401,473.53
Construction
Matshamhlophe Road
Insala Creche Ward 20
Kwamondlo Bus Shelter
Mabhokweni Sportsfield
(Ward 17)
Nyanini Sportsfield Ward 13
Musimbeni Creche Ward 3
Zampkuhle Creche Ward
24
Mbongolweni / Mthombe
Causeway and Road
Safube Creche Ward 16
KZ284 PMU
Umlalazi Sanitation Phase
3 (Ward 2 and 3)
Mpungose 1D Reticulation Kwahlokohloko SSA2 and
SSA3 Water Supply
Goedetrouw Regional
Water Scheme Kwahlokohloko SSA5
Kwahlokohloko SSA1
Water
Upgrade of roads in
Melmoth and Thubalethu
(AFA) MIS 162928
Phase 2 Sidewalk and
Pedestrian Bridge
Upgrading and
refurbishment of Municipal
Stores in Melmoth (AFA)
MIS 187808
Rehabilitation and
Upgrading of Urban Roads
in Melmoth and Thubalethu
Phase 2
Urban Roads Upgrade in
Melmoth and Thubalethu
Phase 3
Greater Mthonjaneni Bulk
Water Supply Phase 1
VO:1 (AFA) MIS 174718
Mthonjaneni Sanitation
Phase 3
R 1,680,328.00
R 614,107.00
R 139,262.40
R 84,651.00
R 517,344.00
R 110,782.40
Registered
Construction
Construction
Stormwater
Multi purpose
community halls
Solid waste
disposal Site
Road &
Stormwater
Road &
Stormwater
Child care fac
Bus Shelters
R 1,550,215.00
R 922,505.00
R 526,009.00
R 429,565.70
R 922,505.00
R 492,036.00
Construction
Construction
Construction
Sport Facility
Sport Facility
Child care fac
R 544,485.00
R 480,096.87
Construction
R 1,600,000.00
R 570,000.00
R 1,233,889.80
R 507,728.35
R 792,257.17
Construction
Construction
Child care fac
Road &
Stormwater
Child care fac
Other
R 21,762,755.37
R 2,788,940.99
Construction
Sanitation
R 70,219,891.17
R 1,687,978.16
Design &
Tender
Water
R 157,844,574.30
R 7,479,138.31
Design &
Tender
Water
R 263,150,511.00
R 1,123,574.06
Registered
Water
R 6,801,982.00
R 331,129.33
Completed
Road &
Stormwater
R 2,160,000.00
R 87,832.78
Completed
Sidewalks
R 5,053,678.18
R 4,965,225.76
Construction
Admin Facilities
R 8,705,000.00
R 4,349,715.03
Construction
Road &
Stormwater
R 6,368,040.00
R 161,352.75
Design &
Tender
Road &
Stormwater
R 209,367,631.97
R 47,885,047.39
Construction
Water
R 15,602,121.38
R 3,010,552.34
Construction
Sanitation
Mawanda Sportsfield
Bhadaza Pay Point
Ward 1 Lumbi Creche
Ward 4 Qomintaba Creche
Ward 3 Ogqabhinyeni
Creche
Ward 3 Dlomodlomo
Creche
Ward 5 Nsimbakazi Creche
Ward 5 Mondini Creche
R 1,977,347.41
R 1,218,698.13
R 845,981.22
R 845,981.22
R 109,501.76
R 87,990.84
R 537,747.11
R 575,906.81
Completed
Completed
Completed
Completed
Sport Facility
Local Amenities
Child care fac
Child care fac
R 845,981.22
R 818,518.44
Completed
Child care fac
R 845,981.22
R 845,981.22
R 845,981.22
R 823,772.29
R 825,313.51
R 833,254.87
Completed
Completed
Completed
Child care fac
Child care fac
Child care fac
15
Bhiliya Community Hall
Ward 4: Ncwane Creche
Ward 2 Maduma
Community Hall
Ward 7: Macekane Crèche
Ward 3: Njomelwane
Crèche
Ward 5: Mancence Crèche
Ward 8: Mgquzankunzi
Sports Field
Ward 6: Ntuzuma Multi
Purpose Centre
Mhlana Phase 3B
extension
Mhlana Somopho 3C
(Upper Nseleni Bulk and
Reticulation)
Source: All MIG projects, June 2011
Construction
Completed
Design &
Tender
Design &
Tender
Multi purpose
community halls
Child care fac
Multi purpose
community halls
R 2,462,304.31
R 845,981.22
R 2,292,672.91
R 831,538.10
R 1,086,311.15
R 360,609.92
R 845,981.22
R 63,623.41
R 972,379.26
R 972,379.26
R 73,144.28
R 73,144.28
R 2,806,620.84
R 207,270.00
Registered
Registered
Design &
Tender
R 2,413,035.87
R 181,556.83
Registered
Sport Facility
Multi purpose
community halls
R 3,970,113.00
R 250,006.94
Completed
Water
R 116,618,865.96
R 4,657,653.76
Design &
Tender
Water
Child care fac
Child care fac
Child care fac
Local municipalities in Uthungulu district municipality have a mix of MIG projects.
Among others are projects such as the establishment of libraries, child care facilities,
sport facilities and multi-purpose community halls. Some of these projects have been
completed, while most are under construction. The June 2011 non-financial report on
MIG states that Uthungulu district and its locals did not submit their 2011 June MIG
reports.
7.
VULNERABILITY CLASSIFICATION
The DCoG Municipal Spatial Classification System was designed to develop municipal
profiles according to spatial location, based upon results from indicator sets on
functionality, socio-economic profile and backlog status. Its purpose is to inform a
differentiated approach to municipalities.
The four municipal classifications developed by DCoG are:
Class 1: Most vulnerable (57 local municipalities)
Class 2: Second most vulnerable (58 local municipalities)
Class 3: Second highest performing (58 local municipalities)
Class 4: Highest performing (58 local municipalities)
The six local municipalities in the uThungulu District can be classified as follow:
Table 6: Vulnerability Classification
Local Municipality
Mfolozi (Mbonambi)
Mthonjaneni
Nkandla
Ntambanana
uMhlatuze
Classification
Second most
vulnerable
Second most
vulnerable
Most vulnerable
Most vulnerable
Highest performing
16
uMlalazi
Second most
vulnerable
From this table it is evident that two of the six local municipalities in the uThungulu
District fall into the most vulnerable category, while three more local municipalities are
classified in the second most vulnerable grouping.
17
Download