EE/2015-16/ Dt. 09.09.2015 COURIER Dear Sir (s), The wax sealed/tempers proof quotation are invited on percentage rate basis from empanelled contractors and from other contractors having PWD/CPWD/MES/Railways/IIT/ NITIE for the following work on behalf of Director, NITIE Mumbai – 87. Quotation forms can be obtained from the office of Executive Engineer, NITIE, Mumbai -400 087. Tel. No. 28035377. This notice is also available on web-site : www.nitie.edu Name of work : Providing M.S. Grill to residential quarters. Estimated cost of work put to quotation : Rs. 7,21,245.00 Earnest Money Deposit : Rs.14,425.00 ( Pay order or DD to be attached in favour of "NITIE Mumbai - 87) Period of contract : 1 month. Defect Liability : 1 year. Last date of issue of quotation : 28.09.2015 up to 3.30 P.M Last date of submission of quotation : 29.09.2015 up to 10.30 A.M. Place of submission of quotation : Quotation Box kept in front of the office of Controller of Examination, Admn. Building, NITIE. Date of opening of quotation : 29.09.2015 up to 11.30 A.M. Validity period of quotation for : 90 days from date of submission acceptance. NITIE reserves the right to reject any or all tenders without assigning any reason thereof. Thanking you, EXECUTIVE ENGINEER NITIE, Mumbai -400 087 SCHEDULE Name of work: - Providing M .S. Grill to residential quarters. Sr. Item Qty. Unit Rate Amount Sqm. 1,440.10 6,48,045.00 Kg. 97.60 73,200.00 No 1 Providing and fixing mild steel grill work for window, ventilators weight 15 kg. per Sqm. as per drawing including necessary welding and painting with one coat(one coat of red lid oil paint and two 450.00 coats of oil paint of approved shade) of anticorrosive paint by preparing the surface etc. complete as per directed. 2 Add for extra weight or deduct for less weight for fabricating such as cutting, shaping, riveting etc. mild steel for grill works including welding and 750.00 painting with one coat of red lid oil paint and two coats of oil paint of approved shade. Total Amount 7,21,245.00 We hereby ready to execute the work ------------------------ % (in words--------------------------------------------------------------) ABOVE / BELOW/AT PAR on the estimate cost put to quotation inclusive of all taxes. Total Quotation Amount quoted after considering the percentage in figure Rs._____________________________Total Quotation Amount quoted after considering the percentage in Word Rs.____________________________ Dt: ------------------------ _____________ CONTRACTOR _______________________ EXECUTIVE ENGINEER