Item 7 - Carbon report

advertisement
Item 7
Annual sustainability report 2013-14
Prepared by:
Dean Gornall
Head of Facilities
Chris Harding
Director of Estates and Facilities
Covering paper:
Rob Elek
Director of Strategy & Business Development
Board of Directors
20th November 2014
Date produced:
9th October 2014
Action for Board:

For information

For consideration

For decision

Annual sustainability report 2013-14: Covering paper
The detailed annual sustainability report for 2013-14 is appended to this covering paper, this
presents a summary of carbon emissions performance from April 2008 to March 2014, based on
all building carbon emissions where Moorfields is responsible for the procurement of energy.
The carbon target represents a 10% reduction in carbon emissions over the 5-years from the
baseline year of 2008/09 to 2014/15; our performance at the end of the 4th year is shown below:
•
Absolute carbon emissions have decreased by 1% from 5,456 tCO2 to 5,386 tCO2;
•
Emissions from electricity have reduced by 3%, those from gas have increased by 2%;
•
Emissions from City Road, the asset responsible for most carbon emissions, have
decreased by 4%, whilst those from the RDCEC have increased by 21%.
The detailed report presents the energy efficiency measures delivered over the past 4 years,
and demonstrates that the increase in patient activity has been delivered with minimal impact on
our carbon emissions, i.e. our carbon emissions per patient have reduced by approximately
29%. This has been achieved despite the continuing growth in the intensity of use of the estate,
both in terms of occupancy and extended working hours, additional diagnostic equipment, and
the delivery of the new data centre in the RDCEC (a key component of our IT business
continuity plans).
Based on the above information, we will not achieve the 10% saving in the final scheme year;
however a key planned efficiency relating to voltage optimisation will have a significant impact
on our emissions and may enable us to meet the target at the end of 2015/16. There are no
financial consequences for not achieving the target, over and above the continued purchase of
carbon allowances. The reputational impact of non-achievement should be minimised by our
over-achievement in reducing emissions per patient, and the reality that the national
performance lists are no longer published.
As participants in the Carbon Reduction Commitment we are required to purchase carbon
allowances at £12 per tonne. We emitted 5,625 tonnes1 in 2013/14 and this equates to £67,500
in allowance purchases – in line with planned expenditure and a saving of £2,700 against the
previous year.
Carbon allowances will increase to £16.40 per tonne for the 2014/15 scheme year, if we were to
maintain our current emission levels this would equate to a cost £92,250.
Trust Board Recommendation
The Board is asked to note:
1. The annual sustainability report and our current performance against the 10% target, in
the context of additional patient activity and intensity of use.
2. The underlying carbon emission reduction of approximately 29% per patient.
3. The further plans to improve energy efficiency through voltage optimisation.
Rob Elek
Director of Strategy & Business Development
1
Government mandates that organisations use different carbon emissions for CRC reporting therefore CRC
emissions factors are higher than the factors used for company reporting, hence the difference between the two
figures. Government has now recognised this discrepancy and from next year the two reporting process will be
aligned and the figure will be more comparable.
1
2013/14 Sustainability Report
Annual Update
2013/14 Sustainability Report
Contents
Section/Chapter
Carbon Emissions - Performance
Page
4
Carbon Emissions - Mitigation
10
Waste – Performance
13
Compliance
13
3
2013/14 Sustainability Report
Carbon Emissions - Performance
This annual report provides a summary of carbon emissions performance from April 2008 to March
2014 based on all building carbon emissions where Moorfields Eye Hospital NHS Foundation Trust is
responsible for the procurement of energy.
This includes the following sites:
• Moorfields Eye Hospital, City Road;
• Moorfields Pharmaceutical;
• Richard Desmond Children’s Eye Centre;
• Ebenezer Street;
• Provost Street;
• 8 Wimpole Street;
• Arthur Steele Unit;
• St Anne’s.
The key messages from this report are highlighted below:
When comparing financial year 2008/09 and financial year 2013/14:
• Absolute carbon emissions have decreased by 1% from 5,456tCO2 to 5,386tCO2;
• Carbon emissions from electricity consumption have decreased by 3%;
• Carbon emissions from natural gas have increased by 2%;
• Emissions at Moorfields Eye Hospital, City Road, the asset responsible for most carbon
emissions, have decreased by 4%;
• Emissions at the Richard Desmond Eye Centre have increased by 21% over this time period.
Detailed explanation of these results is provided over the following pages.
4
2013/14 Sustainability Report
1.1 Absolute Carbon Emissions
Absolute carbon emissions refer to the total amount of carbon emitted through the consumption of
energy across all buildings where Moorfields Eye Hospital NHS Foundation Trust is responsible for
the procurement of energy. The reason why carbon emissions are measured on this basis is that this
directly links to the requirements of the Carbon Reduction Commitment legislation (see
Compliance Section) as well as NHS Sustainable Development Unit and Climate Change Act targets.
In order to calculate carbon emissions, Moorfields utilises industry standards including the
Greenhouse Gas Protocol and DEFRA Guidance to report emissions from scope 1, 2 and 3 sources.
These reporting scopes are explained below:
• Scope 1 emissions: direct greenhouse gas emissions occurring from sources owned or
controlled by the Trust. For example the combustion of natural gas in boilers;
• Scope 2 emissions: greenhouse gas emissions from the off-site generation of grid electricity;
• Scope 3 emissions: all other indirect emissions, which are the consequence of the Trust’s
activities but occur from sources not owned or operated by the Trust. For example grid loses
from the transportation and distribution of electricity.
In order to contribute towards national carbon mitigation targets set by both Government and the
NHS Sustainable Development Unit, Moorfields has set the following carbon reduction target:
Moorfields Eye Hospital NHS Foundation Trust will reduce absolute carbon emissions by 10% by
the end of financial year 2014/15 based on a 2008/09 baseline.
The following figures and tables illustrate the Trust’s progress to date:
5
2013/14 Sustainability Report
Building Carbon Emissions
Performance Indicator
Total direct and indirect Greenhouse Gas emissions by
weight broken down by asset (tCO2e)
Broken-down by asset:
Moorfields Eye Hospital
Moorfields Pharmaceutical
Richard Desmond Children’s Eye Centre
Ebenezer Street
St Ann's Court
Arthur Steele Unit
Provost Street
8 Wimpole Street
2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 % difference
5,456
5,517
5,361
5,420
5,510
5,386
-1%
3,731
878
470
207
98
37
30
4
3,791
837
507
214
98
37
30
4
3,699
847
478
167
98
37
30
4
3,684
883
482
201
98
37
30
4
3,689
880
520
258
98
37
24
4
3,579
875
570
202
97
38
20
4
-4%
0%
21%
-2%
-1%
3%
-32%
-8%
As the figure and table above demonstrate, absolute carbon emissions have decreased from
5,456tCO2 to 5,386tCO2 (1%) when comparing 2008/09 with the same period in 2013/14. This
therefore shows that, at present, Moorfields is not on track to achieve its carbon emissions target.
The relatively small reduction has been achieved primarily due to a 3% reduction in electricity
consumption. In contrast, carbon emissions from the combustion of natural gas have increased 2%.
In the half year Sustainability Report, emissions were reported as 8% below the April-September
2008 baseline level. This was encouraging and suggested that the carbon emissions reduction target
would be achieved. However, it was noted at the time that emissions were expected to increase
during the remainder of the year as the Combined Heat and Power (CHP) engines were switched off
to undergo maintenance. Whilst this led to the slight benefit of reducing natural gas consumption,
electricity consumption increased markedly. This can be clearly seen in the figure below, where from
February to early April an increase in average daily half hourly electricity consumption can be seen.
From early April electricity consumption returned to normal operating levels. It is expected that this
should continue for the rest of the year.
By using the CHP consumption figures for the same time period in 2012/13 it can be calculated that a
6.4% saving would have been achieved when comparing 2008/09 with 2013/4. This would have put
the Trust far closer to the reduction target going in to the last year of the target period.
6
2013/14 Sustainability Report
(a) Carbon emissions by asset
7
2013/14 Sustainability Report
These demonstrate that Moorfields Eye Hospital, City Road was responsible for 66% of total building
emissions during 2013/14 and is therefore the largest contributor to the absolute carbon footprint.
Emissions at this asset have decreased 4% when comparing 2008/09 and 2013/14. A number of
energy efficiency measures have been implemented at this site over the past 2 years which have
contributed to reduction in emissions here. See the “Carbon Emissions - Mitigation” section for further
details. It is expected that this reduction will increase over the next financial year as the CHP engine
has returned to normal operating levels.
Moorfields Pharmaceutical is the second largest emitter of carbon in the Trust’s estate portfolio. The
second figure illustrates that carbon emissions have remained broadly similar over the past 6 years
with a relatively minor 0.4% decrease when comparing 2008/09 and 2013/14.
Following the installation of a data centre and associated plant (including a new chiller) at the Richard
Desmond Eye Centre, carbon emissions increased 21%. However, no further major mechanical and
electrical system installations are planned for this site in the near future. If emissions had remained
static at this asset, a 3% reduction target across the whole organisation would be achieved when
comparing absolute emissions between 2008/09 and 2013/14.
1.2 Relative Carbon Emissions
Relative carbon emissions are used to understand how Moorfields Eye Hospital NHS Foundation
Trust emits carbon relative to its functions as a specialist healthcare organisation. To do this absolute
carbon emissions are scrutinized against two intensity factors, £million revenue and patient activity
numbers, in order to understand how carbon emissions change as business functions change.
Relative carbon emissions Apr-Sep 2008 to Apr –Sep 2013 - £million revenue
8
2013/14 Sustainability Report
Relative carbon emissions Apr-Sep 2008 to Apr-Sep 2013 – patient activity
These figures both demonstrate that despite substantial increases in £million revenue and patient
activity numbers, relative carbon emissions have decreased by 35% and 23% respectively. This
therefore illustrates that the Trust is operating in a more energy efficient manner.
The principle reason that absolute carbon emissions have not reduced more over the past 6 years is
that the Trust’s business activities, as highlighted above, have rapidly increased.
For example, patient activity has grown by 29% when comparing 2008/09 and 2013/14. This in turn
has resulted in increased carbon emissions as increased patient demand has driven increased
energy consumption. Any savings made through energy conservation measure projects have been
partly negated as a result of this.
If patient carbon intensities had remained at the same rate as 2008/09, absolute carbon emissions in
2013/14 would have been 7,020 tCO2. When comparing this figure with the actual performance of
5,386 tCO2 in 2013/14 it can be inferred that carbon mitigation measures have resulted in the
avoidance of 1,634 tCO2, a 29%reduction.
9
2013/14 Sustainability Report
Carbon Emissions - Mitigation
Previously the status of installed energy efficiency measures was provided verbally by the
Maintenance Manager. However, the Energy Engineer is now in the process of undertaking detailed
surveys of previous energy saving measures and providing full reports on each activity to both
confirm level of savings achieved as well as highlighting any potential future opportunities.
Future planned activities are shown below.
It is anticipated that these actions should ensure the required reduction in absolute carbon emissions,
assuming no changes to business functions e.g. an increase in patient activity numbers or the
installation of energy intensive equipment. A further detailed analysis will be provided over the
coming months.
Past Energy Efficiency Measures – 2010 to Present
Ref
1
2
3
Energy saving
projects
Upgrade lighting
as part of
outpatients
refurbishment
Full review of
previous energy
related projects
Installation of
Variable Speed
Drives on the Air
Handling Units
(AHU)
4
Insulation of
exposed pipework.
5
A&E Ventilation
Plant improvement
- BMS Controls
6
Installation of
Inverters on
Constant
Temperature
Pump
Capital
Cost
Annual
Cost
Saving
£ 134,311
£ 11,090
£ 36,894
£ 19,000
£ 36,894
£ 19,000
£
£
£
4,995
-
£ 57,828
£
4,301
5,200
£ 26,600
Anticipated
Energy
Saving
(kWh)
Carbon
Saving
(tCO2)
Status
Comment
The A and E
department has
had a full LED re fit
when this area was
upgraded
123,211
67
Complete
August
2010
Medical
Records &
A&E
190,000
104
Complete
March 2011
190,000
104
Complete
March 2011
108,000
20
Complete
May 2011
54,000
28
Complete
October
2011
650,000
120
Complete
November
2011
At present set
manually to one
speed. No evidence
of auto speed
adjustments
Some areas
outstanding e.g.
steam pipes near
Estates Offices.
This has been
complete. Early
2013
All the controls
have been finetuned during the
service. Fire
dampers have been
installed and
tested.
A Control strategy
has now been
applied to schedule
the running speed
of these inverters
10
2013/14 Sustainability Report
with the outdoor air
temperature. The
speed of the
inverter drives is
now reduced to an
average of 35 htz
(70%) using this
strategy compare to
the manual
adjustment method
previously applied
at 45 Htz (90%)
7
Chiller switch off
during Out of
Hours and
increased use of
free cooling - BMS
controls
8
Insulation of Clean
Steam Generators
9
10
11
Installation of Fan
Coil Units in
Cumberledge
Ward Bedrooms
and a Plate Heat
Exchanger for
bathroom heating
HVAC Controls Feasibility study to
reduce run times,
adjust set points
and review service
planning for AHUs
Primary Plant
Controls Feasibility study to
adjust primary
plant run times in
order to reduce
working loads
whilst maintaining
current operating
conditions
£
£
-
3,410
£ 57,828
£
£
-
-
£ 13,068
£
3,187
£ 26,600
TBC
TBC
145,200
132,807
650,000
TBC
TBC
77
Complete
January
2012
This will be within
2014.
25
Complete
February
2012
The Steam
Generators have
been insulated Mid
2012
120
Complete
June 2012
FCU’s have been
insulated in the
Cumberledge ward
Mid 2012
Complete
October
2013
Feasibility
complete, evidence
available and new
schedules applied.
Savings to be
confirmed by
Energy Engineer
Complete
October
2013
Feasibility
complete, evidence
available and new
schedules applied.
Savings to be
confirmed by
Energy Engineer
TBC
TBC
Introduction
12
Installation of
controls to valve
across two chillers
to allow the set
back of the day
chiller at night.
£
1750
TBC
TBC
TBC
Complete
October
2013
Both of the Chiller
machines on the
LG floor at 163 City
are running 24/7.
The reason for this
is that there are no
control strategies to
ensure that the
11
2013/14 Sustainability Report
Moorefield’s
Pharmacy is kept to
an appropriate
temperature for the
storage of the
Drugs and other
medical products.
13
Combined Heat
and Power (CHP)
Projects
Total
£
5,600
£ 15,000
£ 337,760
£ 143,046
375,000
205
2,618,218
870
Part
Complete
Energy
Engineer to
ensure data
points are
operational
Energy meters
installed.
CHPs linked to
BMS.
Infrastructure and
contract complete
for selling excess
energy to the grid.
Current Energy Efficiency Measures
Ref Energy saving
projects
Project Description
A building specific dashboard for energy
audits, carbon savings and cost savings is
being developed to support business cases
for future energy saving measures. These
will be used to inform the Sustainability
Steering Group.
Undertake a full detailed survey of previous
energy related projects to ensure accuracy of
completion, kWh reductions and submit
reports to the Estates Director for review.
1
Implementation of
Energy Books
2
Energy audits
3
LED Lighting
Rollout
Continued replacement of existing lighting
with LED equivalents where suitable.
HVAC Controls
Tuning of AHU control loops to make plant
operations more efficient. Checking of all
AHU's to ensure correct operation of fresh air
and recirculation dampers for free heating
and cooling.
4
5
Voltage
Optimisation
Installation of Voltage Optimisation
equipment as part of ongoing energy
efficiency measures
Status
Near Completion
Some final fine tuning
required
In Progress
In Progress
Survey completed for
lighting options to the
Lower Ground.
In Progress
In Progress
See Case Study. This
process has been
initiated under the ESPO
Framework.
12
2013/14 Sustainability Report
Waste – Performance
The table below gives an overview of our waste volumes and segregations percentages.
Facilities previously benchmarked Moorfields with all NHS hospitals across the UK using the ERIC
data for 2012 – 2013. The data showed that Moorfields were currently placed 38 out of 294 hospitals
with regards to the percentage of waste being diverted from Landfill.
Waste volumes – April 2013 to March 2014
Waste Weights
83,084, 16%
22,401, 4%
Landfill
Reused/Recycled
HT incineration with recovery
421,738, 80%
Whilst we are placed 38 within the UK out of 294 hospitals there are other considerations that need to
be understood. A large percentage of the other 37 Hospitals incinerate most of their waste. This is
not the best disposal route as stated by the EA with the waste hierarchy. If we take the incineration
process into consideration then we would indicatively be place within the top ten hospitals within the
UK on waste performance. Please note that this information was benchmarked against 2012 – 2013
as the most current ERIC reports have not been released online as of yet.
Compliance
Carbon Reduction Commitment
As participants in the Carbon Reduction Commitment Moorfields Eye Hospital NHS Foundation Trust
is required to measure, monitor and disclose carbon emissions from all electricity and certain gas
supplies to the Environment Agency where the Trust is responsible for the procurement of energy.
When carbon emissions have been ascertained, an allowance for each tonne of carbon must be
purchased and surrendered at a cost of £12/tonne. This cost is due to increase to £16.4 for the next
scheme year (2014/15).
13
2013/14 Sustainability Report
During the 2013/14 period 5,625 tonnes of carbon covered by the scheme have been emitted. This
equates to £67,500 in allowance purchases. When compared to the previous scheme year,
emissions covered by the CRC have reduced by 225 tonnes. This represents a saving of £2,700 in
reduced allowance purchase requirements.
(a) Carbon Reduction Commitment – External Audit
In order to avoid financial penalties associated with noncompliance, an external audit has been
carried out covering Moorfields participation in the first four years of the scheme. Following this audit,
where participation was independently checked and assured, the Trust can confirm that it is
compliant in all areas of the scheme including areas of best practice.
Display Energy Certificates
Buildings occupied by a public authority where the total useful floor area of the building exceeds
500m2, and which is frequently visited by the public, are legally required to have a Display Energy
Certificate (DEC). The aim of these are to provide an energy rating of a building from A to G, where A
is very efficient and G is the least efficient based on the amount of metered energy used by the
building. These must be updated on an annual basis.
At present Moorfields is required to have two Display Energy Certificates - one for Moorfields Eye
Hospital, City Road, the other for the Richard Desmond Eye Centre. The most recent Display Energy
Certificates are shown below. Despite each A-G rating remaining the same as previous certificates,
Moorfields Eye Hospital, City Road has shown an improvement with a score of 132 as opposed to
136 in the previous year. In contrast, performance at the Richard Desmond Eye Centre, for reasons
mentioned in the “Carbon Emissions - Performance” Section, has slipped with a score of 113
compared to 106 last year.
Display Energy Certificates – Moorfields Eye Hospital and Richard Desmond Eye Centre
14
Download