Final design of the Brekovica bridge over Una river at regional road Brekovica – Bihać Spans and total length: L=20,90+21,20+20,9=63,00m Construction method: composite precast T beams with monolithic slab Material of superstructure: prestressed concrete Client: Public Company Roads Federation of Bosnia and Herzegovina Location: Brekovica, intersection of regional and major road M14 Date: from December 2014 to January 2015 Final design of the Počitelj bridge over Neretva river from km 3+445 to km 4+390 at Počitelj – Zvirovići motorway section. Spans and total length: L=105 + 5×147 + 105=945,00m Construction method: balanced cantilever method Material of superstructure: prestressed concrete Client: Public Company Motorways Federation of Bosnia and Herzegovina Location: Počitelj – Zvirovići motorway section Date: from January 2014 to December 2014 Final design of the Vrbovac underpass at Svilaj – Odžak motorway section in km 3+500 Spans and total length: L=24+34+24=82,00m Construction method: on fixed falsework Material of superstructure: prestressed concrete Client: Public Company Roads Federation of Bosnia and Herzegovina Location: Vrbovac near Svilaj Date: from July 2014 to August 2014 Final design of the Gradina overpass at Počitelj – Zvirovići motorway section. Arch span and total length: Lspan=33m, Llength=37m Construction method: arch on falsework Material of superstructure: reinforced concrete Client: Public Company Motorways Federation of Bosnia and Herzegovina Location: Počitelj – Zvirovići motorway section Date: from January 2014 to May 2014 Final design of 4 underpasses at Počitelj – Zvirovići motorway section. Span and total length: Lspan=9 -18m, Ltotal=45m Construction method: on falsework Material of superstructure: reinforced concrete Client: Public Company Motorways Federation of Bosnia and Herzegovina Location: Počitelj – Zvirovići motorway section Date: from January 2014 to May 2014 Final design of the bridge M05.0-2-08 rehabilitation over Pliva river at major road M5 Spans and total length: L=25 +25 +25 =75,00m Construction method: incremental launching method Material of superstructure: steel – concrete composite bridge Client: Public Company Roads Federation of Bosnia and Herzegovina Location: Jajce Date: from September 2013 to December 2013 Final design of the Bojnik bridge at Butile - -Vlakovo motorway section Spans and total length: L=20 + 3×25 +20=115,00m Construction method: span by span, on fixed falsework Material of superstructure: prestressed concrete Client: JV Euroasfalt Sarajevo Ltd & ŽGP Ltd Sarajevo Location: Bojnik, Sarajevo bypass Date: from August 2013 to October 2013 Final design of the Treševine overpass at Butila - -Vlakovo motorway section Spans and total length: L=47m Construction method: on fixed falsework Material of superstructure: prestressed concrete Client: JV Euroasfalt Sarajevo Ltd & ŽGP Ltd Sarajevo Location: Treševine, Sarajevo bypass Date: from August 2013 to October 2013 Final design of the Dubravice bridge at Kaonik – Vitez expressway section Spans and total length: L=24 + 6×30 + 24=228,00m Construction method: span by span, on fixed falsework Material of superstructure: prestressed concrete Client: Public Company Motorways Federation of Bosnia and Herzegovina Location: Kaonik - Vitez expressway section Date: from January 2013 to March 2013 Final design of the Kaonik 1 bridge at Kaonik – Vitez expressway section Spans and total length: L=27 + 3×34 + 27=156m Construction method: span by span, on fixed falsework Material of superstructure: prestressed concrete Client: Public Company Motorways Federation of Bosnia and Herzegovina Location: Kaonik - Vitez expressway section Date: from January 2013 to March 2013 Final design of the Kaonik 2 bridge at Kaonik – Vitez expressway section Spans and total length: L=27 + 2×34 + 27=122m Construction method: span by span, on fixed falsework Material of superstructure: prestressed concrete Client: Public Company Motorways Federation of Bosnia and Herzegovina Location: Kaonik - Vitez expressway section Date: from January 2013 to March 2013 Detailed design of the Pavlovići viaduct at Zvirovići – Kravice motorway section Spans and total length: L=33 + 7×43 +33=367m Construction method: incremental launching method Material of superstructure: prestressed concrete Client: OHL ŽS Brno, Czech Republic Location: Pavlovići, Zvirovići – Kravice motorway section Date: from August 2012 to January 2013 Final design of the Zukići 1 viaduct at Tarčin - Konjic motorway section Spans and total length: L=24 + 4×30 + 27=171m Construction method: span by span, on fixed falsework Material of superstructure: prestressed concrete Client: Public Company Motorways Federation of Bosnia and Herzegovina Location: Zukići, Tarčin - Konjic motorway section Date: from Januar 2012 to Decembar 2012 Final design of the Zukići 2 viaduct at Tarčin - Konjic motorway section Spans and total length: L=45 + 3×50 + 45=240m Construction method: incremental launching method Material of superstructure: prestressed concrete Client: Public Company Motorways Federation of Bosnia and Herzegovina Location: Zukići, Tarčin - Konjic motorway section Date: from Januar 2012 to Decembar 2012 Final design of the Podhrastovi viaduct at Tarčin - Konjic motorway section Spans and total length: L=50 + 90 +125 +90 +50=405m Construction method: balanced cantilever method Material of superstructure: prestressed concrete Client: Public Company Motorways Federation of Bosnia and Herzegovina Location: Podhrastovi, Tarčin - Konjic motorway section Date: from Januar 2012 to Decembar 2012 Final design of the Pirići viaduct at Tarčin - Konjic motorway section Spans and total length: L=24 + 2×30 + 27=111m Construction method: span by span, on fixed falsework Material of superstructure: prestressed concrete Client: Public Company Motorways Federation of Bosnia and Herzegovina Location: Pirići, Tarčin - Konjic motorway section Date: from Januar 2012 to Decembar 2012 Final design of the Vrbljani 1 viaduct at Tarčin - Konjic motorway section Spans and total length: L=35 + 7×50 + 35=420m Construction method: incremental launching method Material of superstructure: prestressed concrete Client: Public Company Motorways Federation of Bosnia and Herzegovina Location: Vrbljani, Tarčin - Konjic motorway section Date: from Januar 2012 to Decembar 2012 Final design of the Vrbljani 2 viaduct at Tarčin - Konjic motorway section Spans and total length: L=40 + 3×50 + 40=230m Construction method: incremental launching method Material of superstructure: prestressed concrete Client: Public Company Motorways Federation of Bosnia and Herzegovina Location: Vrbljani, Tarčin - Konjic motorway section Date: from Januar 2012 to Decembar 2012 Final design of the Kanjina 1 viaduct at Tarčin - Konjic motorway section Spans and total length: L=43 + 6×54 +43 =410m Construction method: incremental launching method Material of superstructure: prestressed concrete Client: Public Company Motorways Federation of Bosnia and Herzegovina Location: Kanjina, Tarčin - Konjic motorway section Date: from Januar 2012 to Decembar 2012 Final design of the Kanjina 2 viaduct at Tarčin - Konjic motorway section Spans and total length: L=70 + 125 +70=265m Construction method: balanced cantilever method Material of superstructure: prestressed concrete Client: Public Company Motorways Federation of Bosnia and Herzegovina Location: Podhrastovi, Tarčin - Konjic motorway section Date: from Januar 2012 to Decembar 2012 Final design of the Galjevo 1 viaduct at Tarčin - Konjic motorway section Spans and total length: L=29 + 45 + 3×50 +45 +32=301m Construction method: incremental launching method Material of superstructure: prestressed concrete Client: Public Company Motorways Federation of Bosnia and Herzegovina Location: Galjevo, Tarčin - Konjic motorway section Date: from Januar 2012 to Decembar 2012 Final design of the Galjevo 1 viaduct at Tarčin - Konjic motorway section Spans and total length: L=29 + 45 + 3×50 +45 +32=301m Construction method: incremental launching method Material of superstructure: prestressed concrete Client: Public Company Motorways Federation of Bosnia and Herzegovina Location: Galjevo, Tarčin - Konjic motorway section Date: from Januar 2012 to Decembar 2012 Final design of the Donje Selo viaduct at Tarčin - Konjic motorway section Spans and total length: L=32 + 40 +2×50 +40 =212m Construction method: incremental launching method Material of superstructure: prestressed concrete Client: Public Company Motorways Federation of Bosnia and Herzegovina Location: Donje Selo, Tarčin - Konjic motorway section Date: from Januar 2012 to Decembar 2012 Final design of the Bila bridge at Vitez – Nević polje expressway section Spans and total length: L=27 + 6×34 + 27=258m Construction method: span by span, on fixed falsework Material of superstructure: prestressed concrete Client: Public Company Motorways Federation of Bosnia and Herzegovina Location: Vitez – Nević polje expressway section Date: from May 2011 to December 2011 Final design of the Mali Mošunj 1 bridge at Vitez – Nević polje expressway section Spans and total length: L=24 + 4×30 + 24=168m Construction method: span by span, on fixed falsework Material of superstructure: prestressed concrete Client: Public Company Motorways Federation of Bosnia and Herzegovina Location: Vitez – Nević polje expressway section Date: from May 2011 to December 2011 Final design of the Mali Mošunj 2 bridge at Vitez – Nević polje expressway section Spans and total length: L=27 + 34 + 27=88m Construction method: on fixed falsework Material of superstructure: prestressed concrete Client: Public Company Motorways Federation of Bosnia and Herzegovina Location: Vitez – Nević polje expressway section Date: from May 2011 to December 2011 Final design of the Stara Bila 1 bridge at Vitez – Nević polje expressway section Spans and total length: L=30m Construction method: on fixed falsework Material of superstructure: prestressed concrete Client: Public Company Motorways Federation of Bosnia and Herzegovina Location: Vitez – Nević polje expressway section Date: from May 2011 to December 2011 Final design of the Stara Bila 2 and 3 bridge at Vitez – Nević polje expressway section Spans and total length: L=32m Construction method: on fixed falsework Material of superstructure: prestressed concrete Client: Public Company Motorways Federation of Bosnia and Herzegovina Location: Vitez – Nević polje expressway section Date: from May 2011 to December 2011 Final design of the Nova Bila bridge at Vitez – Nević polje expressway section Spans and total length: L=32m Construction method: on fixed falsework Material of superstructure: prestressed concrete Client: Public Company Motorways Federation of Bosnia and Herzegovina Location: Vitez – Nević polje expressway section Date: from May 2011 to December 2011 Final design of the Pećuhe bridge at Vitez – Nević polje expressway section Spans and total length: L=21 + 23 +21 =65m Construction method: on fixed falsework Material of superstructure: prestressed concrete Client: Public Company Motorways Federation of Bosnia and Herzegovina Location: Vitez – Nević polje expressway section Date: from May 2011 to December 2011 Final design of the Nević polje 1 bridge at Vitez – Nević polje expressway section Spans and total length: L=24 + 3×30 +24 =138m Construction method: span by span on fixed falsework Material of superstructure: prestressed concrete Client: Public Company Motorways Federation of Bosnia and Herzegovina Location: Vitez – Nević polje expressway section Date: from May 2011 to December 2011 Final design of the Nević polje 2 bridge at Vitez – Nević polje expressway section Spans and total length: L=20m Construction method: on fixed falsework Material of superstructure: reinforced concrete Client: Public Company Motorways Federation of Bosnia and Herzegovina Location: Vitez – Nević polje expressway section Date: from May 2011 to December 2011 Preliminary Design for Interchange Johovac and conceptual designs for objects at inter-regional interchange Investor: Ministry of communications and transport B&H Year: 2011 Main Design for highway Interchange Lašva - Interchange Nević polje Investor: Federal Office for Roads Year: 2011 Surveying of current condition of antenna pole 250 m height in Donje Moštre – Visoko Investor: Public Television Service B&H Year: 2010 Conceptual Design for the route and objects on Main Road Foča-Plužine Investor: European commission Year: 2010 Main Design for overpass Kamenica on displaced main road M5 Investor: Federal Office for Roads Year: 2010 Main Design for Bridge Mrežnica at displaced main road M5 Investor: Federal Office for Roads Year: 2010 Main Design for reconstruction of Bridge Lukavac at main road M.4 Doboj-Šički over abandoned riverbed Investor: Federal Office for Roads Year: 2010 Main Design for structures along the Corridor Vc Motorway section Svilaj-Vukosavlje (LOT1)-Bridges M1-M5 Investor: Ministry of communications and transport B&H Year: 2010 Main Design for structures along the Corridor Vc Motorway section Svilaj-Vukosavlje (LOT1)-Overpasses NP1-NP4 Investor: Ministry of communications and transport B&H Year: 2010 Main Design for structures along the Corridor Vc Motorway section Johovac-Doboj Jug (LOT3)-Underpass Rudanka Investor: Ministry of communications and transport B&H Year: 2010 Main Design for structures along the Corridor Vc Motorway section Johovac-Doboj Jug (LOT3)-Bridge Rudanka Investor: Ministry of communications and transport B&H Year: 2010 Main Design for structures along the Corridor Vc Motorway section Johovac-Doboj Jug (LOT3)-Bridge Kraševo Investor: Ministry of communications and transport B&H Year: 2010 Main Design for structures along the Corridor Vc Motorway section Johovac-Doboj Jug (LOT3)-Viaduct Putnikovo brdo Investor: Ministry of communications and transport B&H Year: 2010 Main Design for structures along the Corridor Vc Motorway section Johovac-Doboj Jug (LOT3)-Bridge Lukavička rijeka Investor: Ministry of communications and transport B&H Year: 2010 Main Design for structures along the Corridor Vc Motorway section Johovac-Doboj Jug (LOT3)-Bridge Bosna Investor: Ministry of communications and transport B&H Year: 2010 Main Design for structures along the Corridor Vc Motorway section Johovac-Doboj Jug (LOT3)-Bridges Usora 1,2,3 Investor: Ministry of communications and transport B&H Year: 2010 Main Design for structures along the Corridor Vc Motorway section Johovac-Doboj Jug (LOT3)-Overpass Prisade Ministry of communications and transport B&H Year: 2010 Main Design for reconstruction of bridge over River Poričnica at main road M.16.3 Investor: Federal Office for Roads Year: 2010 Main Design for reconstruction of bridge over Jala River at main road M.18.0 Investor: Federal Office for Roads Year: 2010 Main Design for noise protection panels at Corridor Vc Motorway sections, LOT 1, LOT 3 and section Vlakovo-Lepenica Investor: Ministry of communications and transport B&H Year: 2010 Main Design for 7 facilities of TMCC complex Drivuša Investor: P.E. Federal Office for construction, managing and maintaining of Motorway Year: 2009 Main Design for the bridge over River Bosna, on Corridor Vc Motorway section Drivuša- Bilješevo Investor: P.E. Federal Office for construction, managing and maintaining of Motorway Year: 2009 Main Design for Bridge M1, at Corridor Vc Motorway section Drivuša- Bilješevo Investor: P.E. Federal Office for construction, managing and maintaining of Motorway Year: 2009 Main Design for bridge and uderpass Drivuša at Corridor Vc Motorway section Drivuša- Bilješevo Investor: P.E. Federal Office for construction, managing and maintaining of Motorway Year: 2009 Main Design for viaduct Bilješevo at Corridor Vc Motorway section Drivuša- Bilješevo Investor: P.E. Federal Office for construction, managing and maintaining of Motorway Year: 2009 Main Design for underpass Lučani 1, Lučani 2 and Lučani 3 at Corridor Vc Motorway section Drivuša- Bilješevo Investor: P.E. Federal Office for construction, managing and maintaining of Motorway Year: 2009 Main Design for retaining walls at Corridor Vc Motorway section Drivuša- Bilješevo Investor: P.E. Federal Office for construction, managing and maintaining of Motorway Year: 2009 Main Design for retaining walls on regional road R445, section Drivuša- Bilješevo Investor: P.E. Federal Office for construction, managing and maintaining of Motorway Year: 2009 Main Design for Bridge no.8 at Interchange Kamenica on newly designed route of Bypass Bihać Investor: Federal Office for Roads Year: 2008 Main Design for Bridge Mrežnica on newly designed route of Bypass Bihać Investor: Federal Office for Roads Year: 2008 Bridges Mo-1, Mo-2 and Mo-3 on regional road R445, section Drivuša – Kakanj Investor: Federal Office for Roads Year: 2008 Main Design for reconstruction of Bridge Topčić Polje on main road M.17, section Doboj-Zenica-Lašva Investor: Federal Office for Roads Year: 2008 Main Design for rehabilitation of bridge in Kiseljak on main road M.5 Investor: Federal Office for Roads Year: 2008 Main Design for high retaining walls in Lucani on Motorway i Regional road R445 Investor: Federal Office for construction, managing and maintaining of Motorway and Federal Office for Roads Year: 2008 Main Design for MO-3 bridge on Regional road R-445 Investor: Federal Office for Roads Year: 2008 Main Design for Moscanica bridge on Motorway Zenica - Sarajevo, section Drivusa- Biljesevo Investor: Federal Office for construction, managing and maintaining of Motorway Year: 2008 DOSLA DO OVDJE Main Design for new bridge M-4 on Zenica-Sarajevo Motorway section Biljesevo-Kakanj Investor: Federal Office for Roads Year: 2008 Main Design for Pedestrian bridge over Miljacka river, between streets Obala Kulina-bana and Obala Maka Dizdara Investor: Municipality Centar, Sarajevo Year: 2008 Main Design for rehabilitation of bridge over Lepenica river in Kiseljak Investor: Federal Office for Roads Year: 2008 Main Design for rehabilitation of Flying control object on Podgorica Airport Investor: Podgorica Airport Year: 2008 Main Design for side toll stations in Visoko and Podlugovi Investor: Federal Office for construction, managing and maintaining of Motorway Year: 2008 Main Design for the bridge over Bosna river on access road of Drivuša interchange on Motorway section Zenica Sarajevo, section Drivuša – Bilješevo Investor: Federal Office for construction, managing and maintaining of Motorway Year: 2008 Main Design for underpass Drivuša Investor: Federal Office for construction, managing and maintaining of Motorway Year: 2008 Main Design for underpass Lucani Investor: Federal Office for construction, managing and maintaining of Motorway Year: 2008 Main Design for rehabilitation of landslide Bogatići retaining walls Investor: Federal Office for Roads Year: 2007 Main Design for reservoirs in Tešanj , Mostar, Zenica, Vukosavlje and near Tunnel Vijenac (V=100m3 i 600m3) Investor: Municipalities Year: 2007 Main Design for rehabilitation of Bridge Brloški Potok on Main Road M.18 Investor: Federal Office for Roads Year: 2007 Main Design for rehabilitation of Bridge over Railway in Šićki Brod M.18 Investor: Federal Office for Roads Year: 2007 Main Design for the Bridge over River Bosna, railway line and local road (“Zli Brijeg”) on Corridor Vc route Investor: Federal Office for Roads Year: 2007 As-built design for of Krsmanovića foundation in Brčko Investor: Brčko District Government Year: 2007 Main Design for closed reception facility for irregular migrants in BH Investor: IOM-EU Year: 2007 Main Design for reconstruction and additional building for Air traffic control center in Sarajevo Investor: Federal Ministry of transport and communications Year: 2007 Main Design for rehabilitation of bridge over railway tracks in Sicki Brod at km 1+004 on M 18.0-2 Investor: Federal Office for Roads Year: 2007 Main Design for rehabilitation of old airport building in Podgorica Investor: Podgorica Airport Year: 2007 Main Design for rehabilitation ofnrailway stations in Niksic, Slap, Stubica, Ostrog and Danilovgrad on Niksic-Podgorica railway Investor: OHL ŽS, a.s. (Željeznica Crne Gore) Year: 2007 Main Design for rehabilitation of bridge over Brloski potok near Kladanj on main road M 18.0-2 Investor: Federal Office for Roads Year: 2007 Main Design for revitalisation of Bridge of Blaz Jovanovic over Moraca river in Podgorica Investor: Construction agency Podgorica 2007 Main Design for the brdige over Fojnica River in Visoko Investor: Visoko Municipality Year: 2007 Main Design for the bridge over Kolina River in Jabuka settlement on Ustikolina- Garež corridor, km 16+250 Investor: Federal Office for Roads Year: 2007 Main Design for the bridge over Crna rijeka River in Delijasi settlement, on the Ustikolina-Garež corridor, km 38+500 Investor: Federal Office for Roads Year: 2007 Main Design for underpass on main road no.5 Izacic - Bihac – Orljani Investor: Federal Office for Roads Year: 2007 Main Designs for industrial plant Natron-Hayat Maglaj Investor: Natron-Hayat Maglaj Year: 2007 Preliminary Design for Toll Station Jošanica Investor: Federal Ministry of transport and communications Year: 2007 Research report on causes and intervention plan on pedestrian bridge ARS-AEVI in Sarajevo Investor: Cantonal Office for Roads Year: 2007