Resume Career Objectives: - Looking for an excellent opportunity to work as Construction manager where my management and engineering skill will come into use. PERSONAL DETAILS: Name Father’s Name Address : S.EDWARD KENNEDY : P.SELVARAJ : No. 3, 3rd Cross Street, Kamban Nagar, Reddiyar palayam, PONDICHERRY- 605010. Date of Birth Marital Status Contact Number Email ID : 07-03-1973 : Married : 9940882290, 0413-2292396 : edwardkennedy.s@gmail.com : selvakedy@yahoo.com PASSPORT DETAILS :Passport No DOI DOE : H7832890 : 11-01-2010 : 10-01-2020 PROFESSIONAL EDUCATION : Education Computer Knowledge : B.E. (Mechanical), Madras University, : MS Office, Basic knowledge in AutoCAD PROFESSIONAL STATUS:- Over 17 years experience in mechanical construction field (power plant, oil and gas plant, Industrial building& warehouse) – Supply, Installation of Fire fighting and plumbing system, WTP,RO & STP system, Installation of Compressed air system with piping, HVAC system, EXPERIENCE Mechanical Manager (01.10.14 to 30.09.15) M/s. Lotte E & C India Pvt.Ltd., Owner: Lotte India Corporation Ltd Project: Lotte India Factory, Rohtak, Haryana. Fabrication and erection of Utility piping, Fire fighting and plumbing system, System Air conditioning and ventilation system, Supply and installation of HSD Storage tank(3oTon), Steam Boiler(2000KH/H),Cooling tower(1169CRT),LPG storage tank(20Ton), Hot water generator(3,00,000kcal/h), Compressed Air System, Air cooled water chiller, WTP with SMC Storage tank, ETP & STP Responsibility Site Explanation Preparing BOQ as per approved drawing Contract negotiation and preparing PO & RA Bill. Planning and scheduling the work as per target dates. Maintaining Daily progress report. Coordination with other departments for effective installation and avoiding rework. Responsible for taking correct and proper decisions during projects. Hand over the project to client and get completion certificate. Manager-Mechanical (01.12.12 to 31.08.14) M/s. Hyundai Engineering India Pvt. Ltd., Formerly Hyundai Amco India Pvt. Ltd., Owner: Hyundai Motors India Ltd & Hyundai Mobis India Ltd., Project1: Hyundai Engine Shop # 3, Chennai. Fabrication and erection of Utility piping, Fire fighting and plumbing system, Rain water piping, Fresh Air unit(FAU) system with ducting, Air conditioning and ventilation system, Supply and installation of HSD Storage tank(5KL & 20KL) Project2: Hyundai WIA CVJ Factory Chennai. Utility System, Fire fighting & Plumbing system, Installation of STP, WTP & RO System, Air Conditioning &Ventilation System. Project3: Hyundai Mobis India Ltd., Chennai a) Mobis Second Factory project Supply, Installation and Commissioning of Air compressor with piping, Borewell, WTP,RO & STP system, Erection of Water(SMC) storage tanks, Fire fighting and plumbing system, HVAC and Ventilation system b) Audio/Airbag Remodeling project Supply, Installation and Commissioning of Air compressor, Air Conditioning & Ventilation System, plumbing System. Responsibility Making of Site Explanation & Agreement for new project Preparing BOQ as per approved drawing Contract negotiation and preparing PO. Coordination with other departments for effective installation and avoiding rework. Checking of Contractors Bills and certifying the same. Daily progress report. Planning and scheduling the work as per target dates. Responsible for taking correct and proper decisions during projects. Responsible for observing the installation process till the completion. Record keeping of Contractor agreement, Hand over the project to client and get completion certificate. Project incharge-Mechanical (11.01.2010 to 25.10.2012) M/s. Samsung Heavy Industries Co., Ltd., Owner: Samsung India Electronics Pvt. Ltd., Project 1: Heat Exchanger plant, Refrigerator plant, Chennai. Fabrication and erection of utility piping, Fire fighting system and plumbing, Erection of LPG,O2 and N2 storage tank, 850Kg/hr. LPG Fired Boiler, Air cooled liquid Chiller (200TR), Double skin horizontal floor mounted Air handling unit(AHU),Oil inject Air screw compressor, Co2 flooding system and STP system. Project 2: Samsung Mobile Plant Samsung India Electronics Pvt. Ltd., Noida, U.P. Installation of Compressed Air System with piping, Fire fighting and Plumbing system, Installation of Air Cooled Chiller with AHU), RO(25m3/hr) & STP(350KLD),Co2 flooding system. Responsibility Preparing Site Explanation & Agreement for new project Making BOQ as per approved drawing Conduct Tool Box meeting Responsible for taking correct and proper decisions during projects. Responsible for supervising sub-contractors, suppliers and vendors who are working at the site. Keeping record for Sub contractor agreement & Hand over certificate Conduct the pneumatic and hydro testing. Senior Engineer (06.10.2006 to 05.09.2009) M/s. Samho Gunyoung Construction Pvt. Ltd., Client: Hyunai amco india pvt. ltd Owner: Hyundai Motors India Ltd., Project: Body shop, Assembly shop, Engine shop # 2, Chennai. Fabrication and erection of utility piping, Plumbing and Fire fighting system, Air washer system, Steam, gas and oil line for Body shop, Assembly shop & Engine shop. Hyundai Heavy Equipment and Construction India Pvt.Ltd, Pune. Fabrication and erection of utility piping and gas line in assemble shop and production shop. Responsibility Conduct Tool Box meeting before start the work. Handled team of workers and engineers. Preparing RA Bill for every month. Making schedule for whole week and report to manager. Responsible for allocating jobs to supervisors and others at site Able to work under pressure and independently. Good Housekeeping and safety measures taken at the work area. Preparation of Hydro testing and air testing. Hand over the job to client as per drawings. Execution Engineer (28.12.2003 to 30.07.2006) M/s. SPIC JEL Engineering Construction Ltd., Client: Technip KT India Ltd., IOTL, TOYO Engineering ltd., & Air oil gas (I) ltd. Project1: Naphtha Splitter Unit. Fabrication and erection of piping, firefighting system and sprinkler for storage tanks, Fabrication and erection of Flare stack supporting structure with 50MT Water seal drum and flare tip. Project 2: Ethylene storage tank facilities. Client: Technip India ltd. Owner: Chemplast Sanmar Ltd, Karaikal. Fabrication and erection of cross country piping(1.3km from LFP),Erection of in plant piping and pipe supports, Erection of equipment,Erection of Flare stack supporting structure with drum flare tip and piping Responsibility Tool box Meeting Allocating the works to the workers. Deploy the manpower, Scheduling and monitoring the activities. Co-ordination with the client, Consultant, Owner, Sub-contractor and site Management. Preparing RA Bill for every month. Responsibility for checking all the aspect in safety concern along with clients. Daily make sure the Target got done and report to the Manager. Hydro testing and Pneumatic testing of piping. Senior Engineer (01.04.2002 to 22.09.2003) M/s. Prasanna Engineering Corporation Client: L & T Ltd., Owner: Madras Atomic Power Station, Kalpakkam. Project 1: Removal of old pressure tube and installation of new pressure tube in reactor, ENMASS Coolant Channel replacement in Unit II Project 2: Dismantling of damaged conveyor and Refabrication and erection of conveyor gallery (18mtr.Length and elevation between +17.54m and +38m). Neyveli Lignite Corporation (NLC), Thermal station-II, Neyveli. Responsibility Responsible for supervising subcontractor supervisor and works who are working on the plant Work execution and training the man power. Piping Engineer (01.09.2001 to 31.03.2002) M/s. Sakthi Hi-Tech Construction Pvt. Ltd., Chennai. Client: Jacobs H & G pvt. Ltd., Owner: Marico Project: Fabrication and erection of steam line, oil line and water line. Coconut oil extraction plant, Pondicherry. Responsibility Co-ordination with client, sub contractor Installation of equipments Hydro testing and Final Billing. Planning Engineer (10.11.1998 to 12.07.2000) M/s. Texcel Engineers pvt. Ltd., Chennai. Client: Bharat Heavy Electrical Ltd., (BHEL) Owner: National Thermal power corporation (NTPC) Project: Combined Cycle power project (HRSG), Faridabad, Haryana. Commissioning, testing and trial run of 2 X 231 TPH Heat recovery steam generator- 2 X 70MW capacity. (Unloading, erection, alignment of 2 X 18MT LP drum and 2 X 100MT wt. of HP drum with Steam line piping, Erection of 2 X 70mtr. Height of chimney. Responsibility Conduct the Tool box meeting. Co-ordination with site engineer to carryout erection activities and daily progress report. Material requisition as per drawing. Conduct Hydro testing and pneumatic testing. Billing and hand over the system to client. Erection Engineer (05.05.1997 to 25.09.1998) M/s.Prumatect Services pvt.ltd. Chennai. Client: JINDAL vijay nagar steel plant. Project: Heavy equipment plant, Bellary. Unloading, erection and alignment of Radial drilling machine, Boring machine, Heavy duty turret lathe, CNC milling machine. Responsibility Co-ordination with client. Preparation the job for erection as per the erection method statement & executing the job. Site Engineer (21.01.1996 to 28.02.1997) M/s Dowel Erectors pvt. Ltd., Chennai. Client: Bharat heavy plate and vessels ltd., Project: LPG Storage plant IOCL, Kandla, Gujarat. Fabrication and erection of inter connecting and cross country piping, Flare stack supporting structure. Responsibility Daily progress report updating. Material requisition as per requirement & Billing Site Engineer (05.10.1994 to 22.12.1995) M/s. Gen power Engineers pvt. Ltd., Chennai. Client: Wartisila Diesel Ltd., Owner: India Cements Ltd., Project: Erection and alignment of6MW Diesel Generator, Cuddapah, Andra. Unloading, Erection and alignment of 6MW Diesel generator with erection of chimney and Diesel storage tank. Responsibility Daily progress report. Co-ordination with workers. Arranging the man power and material for site requirement. Making arrangement for hydro testing and pneumatic testing. DECLARATION I hereby declare that the above furnished details are true to the best of my knowledge. Date: Place: Chennai. S.EDWARD KENNEDY