Evaluation of Proposed System Implementation Plan Traffic Violations Fine Assignment System (TVFAS) Evaluation of Proposed System 4.1 Information Gathering Technique 4.1.1 We have short time to complete project. There are some techniques: Interview, JAD and questionnaire. There are criteria such as depth and breadth of information, integration of information, User involvement and cost of technique. The depth of information in our project is the most important, so the questionnaires technique is not applicable with our project. Interview and JAD are applicable with our project because it has high depth and integration of information, also it has high user involvement and lowmedium cost. 4.1.2 Interview technique is applicable We meet with stakeholders: User (who uses the system). Financial department (connect with employees salaries system). We meet with Ministry of Interior for connecting with Violations System (automated link). 4.1.3 Our Project (TVFAS) Joint Application Design (JAD) The Staff of Project make some meetings for brainstorm. Discuses requirements got it from stakeholders and ministry of Interior. Putting solutions for the system. 4.1.4 Conclusion We use two technique for get or gathering information: Interview and JAD, because we don't have more time and need to depth of information as soon as. 4.2 Develop Work-Plan 4.2.1 WBS activities We develop work-plan activities (WBS) as shown below in (Figure 1). Evaluation of Proposed System TVFAS Gather requirements Meet with stakeholders users Ministry of Interior Financial Department Determine Scope Write problem description Identify application benefits Project Schedule Build WBS Estimate resource Produce Gantt chart Feasibility Study Expected Value Estimate Tangible benefit Estimate Intangible benefit Study technical feasibility Network availability Connect with external DB Study economic feasibility Study Organizational feasibility Analysis Determine requirements Functional modeling Build use case diagram Structure modeling Build class diagram Behavioral modeling Build Sequence diagram Build Collaboration diagram Build State chart Relationship between diagrams Design Design Strategy Moving to Design Database Design User Interface Figure 1 WBS Activities Evaluation of Proposed System 4.2.2 WBS Structure TVFAS 1 Gather requirements 1.1 Meet with stakeholders 1.1.1 Project Schedule 1.2 Build WBS 1.2.1 Estimate resource users 1.2.2 1.1.1.1 Ministry of Interior 1.1.1.2 Produce Gantt chart 1.2.3 Feasibility Study 1.3 Analysis Design 1.4 1.5 Determine requirements Design Strategy 1.4.1 1.5.1 Tangible benefit Functional modeling 1.3.1.1 Moving to Design 1.4.2 1.5.2 Expected Value 1.3.1 Intangible benefit 1.3.1.2 use case diagram 1.4.2.2 Financial Department 1.1.1.3 Determine Scope Study technical feasibility Structure modeling 1.3.2 1.4.3 1.1.2 Network availability 1.3.2.1 Write problem 1.1.3 Identify benefits 1.3.2.2 1.4.4 1.3.3 User Interface 1.5.4 1.4.3.1 Behavioral modeling Study economic feasibility 1.5.3 class diagram Connect with external DB 1.1.4 Database Design sequence diagram 1.4.4.1 Collaboration Study Organizational feasibility 1.3.4 1.4.4.2 state chart 1.4.4.3 Figure 2 WBS Structure Relationships 1.4.5 Evaluation of Proposed System 4.2.3 Staff the Project 4.2.3.1 Dr.Abdullah Bin Mohammed Alshehri General manager of IT at GIP 4.2.3.2 Technical Programmer (3) Rayef Mohammed Karim Abdullah Sultan Alrashidi 4.2.3.6 System Analyst (2) Ahmed Bin Abdul-Aziz Alomrani Sultan Bin Nasser Almasoud 4.2.3.5 Vice Project Manager (1) Dr.Khalid Bin Furayeej Alotaibi manager of Information Department at GIP 4.2.3.4 Project Manager (1) DBA (1) Surayhan Bin Gazi Alharbi Figure 3 Gantt Chart (activities responsibility) Evaluation of Proposed System 4.3 Non-Functional Requirements 4.3.1 Operational requirement The TVFAS should be integrating with work environment. The TVFAS should be able to work on web application. The TVFAS reports should be compatible with reports system. 4.3.2 Performance requirement The TVFAS should not exceed 3-5 seconds when user interacts with system. The TVFAS should be receiving updated violations information from Ministry of Interior every one hour. The TVFAS should be available for use 10 hours per work day. 4.3.3 Security requirement Managers and direct user can see violations report. The data DB should be encrypted. The TVFAS should be having audit (who changing data).