SC3.2 Priority infrastructure plan maps
The Priority infrastructure plan includes the maps stated in Table SC3.2.1 and which are
referenced in sections 4.3, 4.4, 4.5 and 4.6.
Table SC3.2.1—Priority infrastructure plan maps
Map number
Title of map
Purpose of map
Map A1
Priority Infrastructure Area
Identifies the areas that the local
government prioritises in order to provide
trunk infrastructure for urban development
(see section 4.4). The purpose of the
priority infrastructure area is to align the
footprint for development with the plans
for trunk infrastructure
Map A2
Priority Infrastructure Area
and priority infrastructure
area localities
Identifies the priority infrastructure area
localities (section 4.3.2 of Part 4) contained
within the priority infrastructure area
Map A3
Water Supply Network
Service Catchments
Identifies the service catchment boundaries
for the water supply network
Map A4
Sewerage Network Service
Catchments
Identifies the service catchment boundaries
for the sewerage network
Map A5
Stormwater Network Service
Catchments
Identifies the service catchment boundaries
for the stormwater network
Map A6
Transport Network Service
Catchments
Identifies the service catchment boundaries
for the transport network
Map A7
Community Purposes
Network Service Catchments
Identifies the service catchment boundaries
for the community purposes network
Map B1
Plans for Trunk
Infrastructure – Water
Supply Network Key
Provides a guide to the plans for trunk
infrastructure and schedule of works for the
water supply network
Map C1
Plans for Trunk
Infrastructure – Sewerage
Network Key
Provides a guide to the plans for trunk
infrastructure and schedule of works for the
sewerage network
Map D1
Plans for Trunk
Infrastructure – Stormwater
Network Key
Provides a guide to the plans for trunk
infrastructure and schedule of works for the
stormwater network
Map D2
Stormwater Network DSS
Conveyance Standards
Assists in the interpretation of the desired
standards of service for the stormwater
network (see section 4.5.4)
Map E1
Plans for Trunk
Infrastructure – Road
Network Key
Provides a guide to the plans for trunk
infrastructure and schedule of works for the
transport network (local and State-
Schedule 3 – Priority infrastructure plan mapping – Priority infrastructure plan maps
Effective 30 June 2014
controlled road network)
Map E2
Plans for Trunk
Infrastructure – Active and
Public Transport Network
Key
Provides a guide to the plans for trunk
infrastructure and schedule of works for the
transport network (pathway network and
public transport (ferry terminals and bus
stops) network)
Map E3
Transport Network DSS
Mode Share Targets
Assists in the interpretation of desired
standards of service for the transport
network (local and State-controlled road
network) (see section 4.5.5)
Map F1
Plans for Trunk
Infrastructure – Community
Purposes Network Key
Provides a guide to the plans for trunk
infrastructure and schedule of works for the
community purposes network
Map F2
Community Purposes
Network DSS Areas
Assists in the interpretation of desired
standards of service for the community
purposes network (see section 4.5.6)
Schedule 3 – Priority infrastructure plan mapping – Priority infrastructure plan maps
Effective 30 June 2014