Daily Progress Report of Project Site Engineer

1. Name of Contractor Agency: G.V.P.R.Engineer L.td 4.Date : 31-7-10

2. Package No : 12th 5.Name : K.Sambasiva Rao

3. Location : KM 136.50 to 137.100

Team Present:

SI.No Irrigation Department SI.No Contractor

1 T.Satyanarayana

2

3

1

2

3

SI.No. 3 Party QC &QA

1 B.Anil Kumar

2

3 rd

1.Description of work :- Shot cret is under progress

2.Visual Observations :- Wire mesh provided before spray of shot cret 1 st layer. Top level of shot cret is not maintained.

3.Field Tests Conducted :- Sand and Metal tested

4.Any Major Observations :- Suggested to spray the 2 nd layer of shot cret, within 24 hours after spraying 1 st layer of shot cret.

5.Compliance of Earlier Comments :- Even through suggested wire mesh fixed before spraying 1 st layer . This may please be avoided. Uniform top level of shot cret may please be provided.

Signatures :

Rep.of I & CADD TPQC Rep.Contractor

SMEC INTERNATIONAL Pty.Ltd.

Daily Progress Report of Project Site Engineer

1. Name of Contractor Agency: G.V.P.R.Engineer L.td 4.Date : 22-7-10

2. Package No : 12th 5.Name : K.Sambasiva Rao

3. Location : KM 128.00

Team Present:

SI.No Irrigation Department

1

2

3

Sri. Subba Rao E.E

T.Satyanarayana A.E

SI.No Contractor

1

2

3

SI.No. 3 rd Party QC &QA

1 B.Anil Kumar S.T

2

3

1.Description of work :- C.C. Bed Lining

2.Visual Observations :- Transfer & Longitudinal steps are being providing but not in uniform intervals fields motars should be according specificities precast porus plugs not providing.

3.Field Tests Conducted :- Slump verified and load rejected again

Slump Verified C.C.Cubes casted

4.Any Major Observations :- Excess water in c.c. mix Honey coumbs observed uniform top surface of c.c lining not maintain undulations noticed with naked eye . These may please be avoided at least in future. .

5.Compliance of Earlier Comments :-

Signatures :

Rep.of I & CADD TPQC Rep.Contractor

SMEC INTERNATIONAL Pty.Ltd.

Daily Progress Report of Project Site Engineer

1. Name of Contractor Agency: G.V.P.R.Engineer L.td 4.Date : 22-7-10

2. Package No : 12th

3. Location : KM

5.Name : K.Sambasiva Rao

Team Present:

SI.No Irrigation Department SI.No Contractor

1 Sri. Subba Rao E.E 1

2 T.Satyanarayana A.E 2

3 Sri. Kabir Basha D.E.E 3

SI.No. 3

1

2

3 rd Party QC &QA k.Sambasiva Rao PSE

B. Anil Kumar S.T

1.Description of work :- Shot cret

2.Visual Observations :- (1). Wire mesh fixed before laying 1 st layer of shot cret.

(2). Mix not by Weight

(3). Sufficient plasticize not available at site

3.Field Tests Conducted :- ------

4.Any Major Observations :-Requested to use plasticizes also while doing shot cret.

Shot cret should be a uniform levels duly removing roots etc.

5.Compliance of Earlier Comments :- Even throught suggested, one layer of shot cret not done, before fixing wire mesh and at least they have not provided brickets under wire mesh.

Signatures :

Rep.of I & CADD TPQC Rep.Contractor

SMEC INTERNATIONAL Pty.Ltd.

Daily Progress Report of Project Site Engineer

1. Name of Contractor Agency: G.V.P.R.Engineer L.td 4.Date : 22-7-10

2. Package No : 12th 5.Name : K.Sambasiva Rao

3. Location : KM 137.100 to 136.6

Team Present:

SI.No Irrigation Department SI.No Contractor

1 Sri. Subba Rao D.E.E 1

2 T Sri. Kabir Basha D.EE 2

3 T.Satyanarayana A.E 3

SI.No. 3 Party QC &QA

1 B. Anil Kumar S.T

2

3 rd

1.Description of work :- Shot cret

2.Visual Observations :- Rammer test conducted. Roots removing as suggested uniform top level not maintained. Sufficient plasticizer and sodium silicate should be available at site as the present state may be sufficient.

3.Field Tests Conducted :- Shot cret tested with hammer.

4.Any Major Observations :-Continuous curing not being done. Wire mesh fixed without shot cret one layer event through requested to of times.

5.Compliance of Earlier Comments :- Roots removing uniform level on top of shot cret not maintained. Continuous curing not done event thorough repeated requests wire mesh fixed before laying shot cret. At least Brickets not provided under the wire mesh.

Signatures :

Rep.of I & CADD TPQC Rep.Contractor

SMEC INTERNATIONAL Pty.Ltd.

Daily Progress Report of Project Site Engineer

1. Name of Contractor Agency: G.V.P.R.Engineer L.td 4.Date : 21-7-10

2. Package No : 12th 5.Name : K.Sambasiva Rao

3. Location : KM 122.00 to 128.00

Team Present:

SI.No Irrigation Department

1

2

3

T.Satyanarayana A.E

SI.No

1

2

3

Contractor SI.No. 3 rd Party QC &QA

1 B. Anil Kumar S.T

2

3

1.Description of work :- C.C. Bed Lining

2.Visual Observations :- Honey coumbs observed at both the edges of cc panels. Excess water observed load rejected & rectified before the available.

3.Field Tests Conducted :- Slump Verified.

C.C.Cubes Casted

4.Any Major Observations :-

5.Compliance of Earlier Comments :- Even through suggested honey coumbs observed requested compact properly.

Signatures :

Rep.of I & CADD TPQC Rep.Contractor

SMEC INTERNATIONAL Pty.Ltd.

Daily Progress Report of Project Site Engineer

1. Name of Contractor Agency: G.V.P.R.Engineer L.td 4.Date : 14-7-10

2. Package No : 12th 5.Name : K.Sambasiva Rao

3. Location : KM 137.100 to 137.300

Team Present:

SI.No Irrigation Department SI.No Contractor

1 Sri. Subba Rao D.E.E 1

2 T.Satyanarayana A.E 2

3 3

SI.No. 3 Party QC &QA

1 Sri. M.Basavaiah

2

3 rd

1.Description of work :- Shot cret

2.Visual Observations :- Curing not done properly, wire mesh fixed before laying Ist layer of shot cret without removing vegetations, small through roots etc at top edge, they are doing shot cret.

3.Field Tests Conducted :-

4.Any Major Observations :- Roots, vegetation not removed at top edge where shot cret doing which is lining objective able. Wire mesh fixed before laying 1 st layer of shot cret even through requested, curing not done affectively, Continuous curing not done. It is also observed that shot cret not observed it approved to be very loose.

5.Compliance of Earlier Comments :- Work not improved even number of times requested.Roots not removed continuous curing not done. Weighing machine not adopting.

Signatures :

Rep.of I & CADD TPQC Rep.Contractor

SMEC INTERNATIONAL Pty.Ltd.

Daily Progress Report of Project Site Engineer

1. Name of Contractor Agency: G.V.P.R.Engineer L.td 4.Date : 19-7-10

2. Package No : 12th

3. Location : KM 128.00

5.Name : K.Sambasiva Rao

Team Present:

SI.No Irrigation Department

1

2

3

T.Satyanarayana A.E

SI.No

1

2

3

Contractor SI.No. 3 rd Party QC &QA

1 B. Anil Kumar S.T.

2

3

1.Description of work :- C.C. Bed Lining

2.Visual Observations :- Porous plugs not fixed properly. Requested to provide precast plugs filters also not providing properly demonstrations how to provide filters & porous plays at site . Excess water ask them to minimize water observe the W/C Ratio properly.

3.Field Tests Conducted :- Slump Verified

C.C Cubes Casted

4.Any Major Observations :- Sub grade not weighing for depth of 15 cm before laying C.C

Requested them to do the c.c only after wetting the bed surface as suggested. Transfers & longitudinal steps not fixed as per specific gravity.

5.Compliance of Earlier Comments :-

Signatures :

Rep.of I & CADD TPQC Rep.Contractor

SMEC INTERNATIONAL Pty.Ltd.

Daily Progress Report of Project Site Engineer

1. Name of Contractor Agency: G.V.P.R.Engineer L.td 4.Date : 14-7-10

2. Package No : 12th 5.Name : K.Sambasiva Rao

3. Location : KM 127.900

Team Present:

SI.No Irrigation Department

1 Sri. Subba Rao D.E.E

2 T.Satyanarayana A.E

3

SI.No

1

2

3

Contractor SI.No. 3

1

2

3 rd Party QC &QA

Sri. M.Basavaiah

1.Description of work :- C.C. Lining on R/s in the Canal bed.

2.Visual Observations :- PVC Pips fixing manually

Honey coumbs observed.

Weighing machine not adopted for mixing c.c

3.Field Tests Conducted :- ----

4.Any Major Observations :- ----

5.Compliance of Earlier Comments :- Requested to avoid honey coumbs paver roller should be moved up to ends of pannel for proper rolling & to avoid coumbs.

Signatures :

Rep.of I & CADD TPQC Rep.Contractor

SMEC INTERNATIONAL Pty.Ltd.

Daily Progress Report of Project Site Engineer

1. Name of Contractor Agency: G.V.P.R.Engineer L.td 4.Date : 14-7-10

2. Package No : 12th

3. Location : KM 122.810

5.Name : K.Sambasiva Rao

Team Present:

SI.No Irrigation Department

1

2

3

Sri. Subba Rao D.E.E

T.Satyanarayana A.E

SI.No

1

2

3

Contractor SI.No. 3 rd Party QC &QA

1 Sri. M.Basavaiah

2

3

1.Description of work :- C.C. Lining

2.Visual Observations :- Bed surface preparing to seat c.c. lining

3.Field Tests Conducted :- Metal, Sand Collected

4.Any Major Observations :- ----

5.Compliance of Earlier Comments :- ----

Signatures :

Rep.of I & CADD TPQC Rep.Contractor

SMEC INTERNATIONAL Pty.Ltd.

Daily Progress Report of Project Site Engineer

1. Name of Contractor Agency: G.V.P.R.Engineer L.td 4.Date : 14-7-10

2. Package No : 12th

3. Location : KM 114.60

5.Name : K.Sambasiva Rao

Team Present:

SI.No Irrigation Department

1

2

3

Sri. Subba Rao D.E.E

T.Satyanarayana A.E

SI.No Contractor

1

SI.No. 3

Madhu Sudan Reddy 1 rd Party QC &QA

Sri. M.Basavaiah

2

3

2

3

1.Description of work :- shot cret crust tested

2.Visual Observations :- Slopes not cleaned before laying shot cret. Weighing machine should be kept at site.

3.Field Tests Conducted :- Sand collected for testing in Lab.

4.Any Major Observations :- ----

5.Compliance of Earlier Comments :- Slopes of deep cut should cleaned with water before starting shot cret.

Signatures :

Rep.of I & CADD TPQC Rep.Contractor