Projects in Phase 2 January 20, 2014 Projected In-Service Date Planned Rating Comprehensive Report Date/From Review Group First Meeting Date West of McNary Reinforcement Project 2013 4500 MW 8/10/09 BPA ? ? New Project Southline Transmission Project 12/2014 Multiple See Phase 2 log 3/8/12 Southline Transmissio, LLC. ? ? New Project Path 42 1500 MW Upgrade Project 12/2013 1500 MW E-W 3/9/12 SCE ? Path 42 800 MW Upgrade Project 12/2012 800 MW E-W 10/5/11 SCE ? Yes Uprate Cascade Crossing Transmission Project 4/2015 1500 MW E-W 05/07/09 PGE ? Yes New Project Walla Walla-McNary Transmission Project 12/2012 800 MW E-W 10/06/09 PacifiCorp ? Yes New Project TransWest Express Project 12/2014 3000 MW N-S 10/06/09 TWE, LLC ? Yes New Project ? 600 MW N-S 07/30/09 CFE 03/02/10 Yes Uprate Devils Gap Interconnection to CNC 500 kV Line 2015 500 MW 03/12/09 AVA ? Yes New Project NorthernLights Project 2015 2000 MW 12/11/08 TransCanada Energy Ltd. ? Yes New Project Canada-Northern California Transmission Project (CNC Project) 2015 3000 MW 12/22/08 PG&E ? No New Project 2011-16 3000 MW N-S, Aeolus South 11/21/08 PacifiCorp ? No New Project ? No New Project Project Path 45 Uprate Project Gateway South Project Gateway West Transmission Project 2012 2050 MW 11/21/08 Aeolus West PacifiCorp/IPC * Projects listed as “In service” will be removed from the next issue of this log. In Base Cases? Yes/No ? Comments Uprate Project Projected In-Service Date Projects in Phase 2 January 20, 2014 Comprehensive Planned Report Rating Date/From Review Group First Meeting Date In Base Cases? Yes/No Comments SWIP North Transmission Project 2014 1400 MW N-S, 2000 MW S-N 5/20/08 LS Power, LLC ? No New Project Wyoming-Colorado Intertie Project 2014 900 MW 6/07 Trans-Elect ? Yes New Project Sea Breeze Pacific Juan de Fuca Project 2012 +/- 550 MW 10-31-06 / Sea Breeze ? No New Project Navajo Transmission Project Segment 1 2016 1500 MW 12-21-06 Sithe Global ? No New Project SWIP-South Project (formerly known as Great Basin Transmission Project (Robinson Summit – Harry Allen 500 kV Line)) 2012 1430 MW (N – S) 05-17-06 LS Power Development LLC 3/20/07 No New Project * Projects listed as “In service” will be removed from the next issue of this log. Projects in Phase 3 January 20, 2014 Project Accepted Projected In-Service Date Revised Projected In-Service Date Review Group Comprehensive First Meeting Report Date / Date/From Date Received Accepted Rating TOT 1A (Path 30) Limit Calculation Update Project 2013 6/12/2013 WAPA ? 1/7/2014 Keota Interconnection TOT 3 Definition Change 2015 8/16/2013 TSGT Southern Nevada Transmission Interface Project (Path 81 Redefinition) 2013 Path 18 Upgrade Project In Base Cases? Yes/No Comments Yes Upgrade ? 11/12/2013 ?? New Project 03/7/2012 NV Energy ? 11/4/2013 ?? New Project 2013 11/16/2012 NWE ? 01/30/2013 Yes Upgrade Hemingway to Boardman Transmission Project 2018 08/21/2012 IPC ? 11/28/12 Yes New Project Path 3 S-N Rating Increase ?? 11/01/2012 BCTC ? 12/13/2012 Yes Upgrade TOT3 Archer Interconnection Project 2013 05/14/2012 TSGT ? 11/16/2012 ?? Upgrade Path 23 Transformer Upgrade Project 2012 2/1/12 APS ? 4/18/12 Yes Upgrade Path 26 S-N Re-definition Project 2011 6/7/11 PG&E ? / 9/27/11 Yes Re-Definition Mountain States 500 kV Transmission Intertie (MSTI) 2013 3/28/08 NWE 6/5/08 / 9/27/11 Yes New Project Gateway West – Borah West, Midpoint West & Bridger 2400 MW Upgrade Projects 2012 11-24-08 IPC ? / 7/21/11 Yes New Project 2011-16 11-21-08 PACE ? / 6/21/11 Yes In Service 04-23-09 SWPG 08/27/09 Yes New Project Gateway South TOT 2B/2C Project SunZia Southwest Transmission Project 2014 2015 Gateway West-Aeolus West, Bridger/Anticline West and Path C Project ? 11-24-08 IPC ? / 1/05/11 Yes New Project Gateway South-Aeolus South Project ? 11-21-08 PACE ? / 12/16/10 Yes New Project Gateway West-TOT 4A Project ? 11-24-08 IPC ? / 12/04/10 Yes New Project * Projects listed as “In service” will be removed from the next issue of this log. Projects in Phase 3 January 20, 2014 Project TOT 4A/4B Transmission Path Rerate EOR 10500 MW Project Accepted Projected In-Service Date Revised Projected In-Service Date ? Review Group Comprehensive First Meeting Report Date / Date/From Date Received Accepted Rating In Base Cases? Yes/No Comments 7-30-10 PACE ? / 10/11/10 Yes Uprate Yes Simultaneous Rating of New and existing projects 2009 2011 12-30-05 SCE ? 03-01-07 Devers–Palo Verde No.2 Project (DPV2)/Path 46 Rating Summer 2009 2011 04-25-06 SCE 12-6-05/ 05-17-06 Yes New project Devers–Palo Verde No.2 Project (DPV2)/Path 49 Rating Summer 2009 2011 07-27-05 SCE 7-21-04 8-30-05 Yes New project Path 49 Upgrade Project (to 8055 MW) Fall/Winter 2006 8055 MW by summer 2006. 3/03 SDGE 5-16-03 Yes In-Service but Not Complete * Projects listed as “In service” will be removed from the next issue of this log.