Company Logo Address Work Order (Labour- On item rate basis) Work Order No : Work Order Date: To , Contractor’s Company Name Address: Tel/Mobile No: Email ID: Service Tax No: PAN: Subject: Flooring and Dado (Wall cladding ) work for building (building name), in our project (project name), located at (project address) With reference to your quotation dated ………………., & discussions we had with you, we are pleased to award you the work order for flooring and dado ( Wall cladding ) work for building (building name), in our project (project name), at ( address) on labour basis. Hereinafter (Developer’s company/firm name) is called as “Developer/Owner” and (Contractor’s company/firm name) is called as “Contractor”. The detailed terms & conditions of the work order are as follows. DETAILED TERMS AND CONDITIONS: 1.Project details: The project & building details for which this work order has been allotted are as follows: Project name: Address: Building name/number: 2. Scope of work: The scope of work for the agreed item rates includes labour work fora) Vitrified/ceramic tile flooring and skirting in all apartments, toilets/bathrooms/WC’s, attached terraces/balconies b) Vitrified/ ceramic tile flooring and skirting for all floor lobbies, parking level lobby, Staircase mid landings c) Vitrified/cement concrete/paver tile flooring for parking d) Kota/marble/granite treads and risers for staircases e) Wall tiling/dado of vitrified/ceramic tiles for kitchen f) Wall tiling/dado of vitrified/ceramic tiles for toilets/bathrooms/WC g) Wall tiling/dado of vitrified/ceramic tiles for floor lobbies, parking level lobby h) Wall cladding of marble/ granite for floor lobbies, parking level lobby i) Marble/granite window sills/jambs j) Marble/granite door frames for rooms, toilets and lift openings k) Marble/granite kitchen otta supported on kadappa supports l) Counter wash basins m) Filling of grout for all kinds of flooring and wall tiling n) Polishing of marble/granite or any other natural stone where ever applicable 3.Quantity: This is an item rate contract .The quantities of various items are as per attached annexure I. 4) Quantity variation: If due to any reasons, the quantity as per annexure I changes than the actual executed work on site, then the revised actual quantity shall be considered for final payable amount calculation. The change in the quantity shall be jointly certified by the contractor & our site in charge. 5) Payable amount: The payable amount shall be as per the agreed rates as mentioned in annexure I. As per these rates, the total amount of this contract comes out to Rs.____________/- (In words ________________) Service tax, if applicable, shall be paid extra. 6) Rates for the extra or new items: If some item is not included in annexure I herein, the contractor shall bring it to the notice of the site in charge before the start of its work. Such item shall be executed on the site only after the approval of Developer or site in charge for its cost. The Consultant/ Developer shall settle the item rates for all extra and/or new items, by deriving them from similar items already quoted in the quotation or mentioned in the annexure I herein. In case if this is not possible, the rates will be computed as per the cost of the daily wages of labour plus 15% to cover overheads, supervision and profits. The Consultant’s/ developer’s decision and derivations regarding this shall be final and binding on the Contractor. Such items shall be included in annexure I later as a part of this Work order. 7) Bill of quantities: The Bill of Quantities as mentioned in annexure I, forms part of the Contract but the developer does not undertake to carry out the whole of the work as shown in it and reserves the right to modify any part thereof. The Contractor shall not be allowed any compensation or damages for work, which is so omitted or cancelled by the developer. The Bill of Quantities is for indication purposes only and the item rates shall remain valid for any variation in individual quantities or for variation in overall value of work. 6) Payment terms: a) No advance shall be paid to the contractor. b) Contractor shall submit R.A bills along with measurement sheets etc with certification by site engineer & site in charge. The payment of the duly certified bill will be done within ____ days from the receipt of the same. c) Retention of 5% of bill value shall be deducted from each R.A bill & the same shall be released after successful completion of defects liability period of _____ months . d) Service tax shall be paid extra.( tax registration certificate shall be provided to claim the tax ) e)Applicable TDS will be deducted from each payable amount and TDS certificate for the same will be handed over to the contractor at the financial year end. f) Debit Notes, if any, shall be attached along with each R.A. Bill duly signed by Site in Charge and accepted by the contractor. Decision of Director / Project Manager/ Site In charge will be considered as final in case of discrepancies. 7) Payment stages: a) For items without polishing: There will be no payment stages as such and bills shall be submitted item wise and floor wise against 100% work completion. b) For items with polishing: After fixing of marble/granite: ___________ % After final coat of polishing: __________% 8) Time of completion: Time is the essence of the contract. The entire work in your scope shall be completed in all respects and handed over to us before the targeted date of completion. Contractor shall adhere to the schedule fixed by the Site In charge to suit the site conditions. It shall be the Contractor responsibility to jointly workout the detailed program along with the Site in Charge so as to complete the work within the time period. Date of start of work : Targeted date of completion of the work : 9) Liquidated damages for delays: Amount of Rs ..................../- will be deducted every week from the payable amounts, for the delay, after the above mentioned targeted date OR intermediate targeted dates, if the delay is due to any reasons attributed to the contractor except Force Majeure or any other reasonable cause beyond control. 10) Space for storage of tools and materials: The Contractor will be provided with space for storing his tools, materials and equipments at site; however, the Contractor will be solely responsible for the safety and security of the items stored and no claims on account of theft or damage will be entertained. 11) Space for labour camp etc: Land for Labor Camp, office, stores etc. will be provided at site free of cost as and when it is available at site or nearby. Contractor shall provide hutments for his labor at site at his own cost including materials required for the same at a suitable location identified by the Project Manager. No workmen will be allowed to stay within the building under construction. It shall be responsibility of Contractor to maintain the cleanliness and hygienic condition at labor camp and at full site as well. You shall take the necessary action in this regards, as directed by our Project manager at no extra cost to the company. In case contractor fails to maintain the requisite hygienic conditions in labour camp as per the local authority’s health dept's requirements, company shall get the same done & debit an amount of Rs. ________/- per labour per month deployed by contractor. Contractor shall be responsible for his labor management thereof and upon completion of work you shall remove labor camp etc. outside of the site. 12)Weekly /fortnightly meetings: Weekly / Fortnightly Co-ordination and progress monitoring meetings will be held at site along with Contractor. 13) General conditions regarding workmanship & work procedures : a) The contractor should not puncture or chisel any RCC member under any circumstances. b) All the switch boards / light points /fan points /Db’s should be fixed at specific standard heights as mentioned in drawing and they should be perfectly vertical. c) The company reserves right to debit the contractor for the cost of any material damaged during the work & the cost of rectification of defective work. d) The contractor shall do shifting /lifting of all the materials from store to the work place through staircase, at his cost. e) Care shall be taken during the execution of work to avoid nuisance and disturbance to the neighborhood. f) Main distribution boards and Electrical switch boxes where ever provided shall be protected and thoroughly cleaned. g) A senior electrician and a helper should be present at the time of casting of the slab to take care of the intactness of the joints in the pipes during the concreting. h) Chasing of the conduits should be in straight line and using chiseling machine. i) The contractor shall clean the rabbit of the chiseled material and dump it at the given location at the site. j) The contractor shall provide good quality wire connectors at all free ends of wires. k) Any Departmental work directed by company’s Site In Charge (not in the scope of the contractor) shall be paid at actual. Contractor to keep proper record of the same duly certified by Site In charge with supporting reason, usage of labours, area of work etc. l) For all defective work, Labor Contractor shall be solely responsible and shall bear the cost material and labour for redoing same as directed by the Engineer-in-Charge. m) The Labor Contractor shall not remove any material from site either belonging to the company or the labour contractor without prior knowledge, consent and written instructions from Site-in-Charge. n) One copy of material requisition note (MRN) for the material which is brought on site by the contractor must be given to the company. o) No extra cost shall be paid to the Labor Contractor for any work that is carried out beyond the working hours of the day by way of night shift. p) Contractor or his representative shall give daily labor report to the Site-in-Charge. q) The company reserves right to debit the contractor for the cost of a) any company material damaged during the work, b) excessive wastage of material supplied by the company for the work, c) The cost of rectification of the defective work if the same has not been rectified by the contractor at his cost. 14) Measurements: The Contractor’s bills shall be properly supported by measurement charts for all items. In no case, the bill will be certified without this. The Contractor or his representative shall accompany the site in charge/Consultant when required to do so, to assist in taking measurements and he shall agree to the measurements on the spot, subject to finalization by the Consultant. The Contractor shall provide all items such as measuring tapes, ladders etc. and any labour required for taking measurements. 15) Guarantee /defect liability period: The total work executed shall be guaranteed for quality of workmanship for a period of ______ months from the date of handing over of the entire works to the satisfaction of the company. During the guarantee period contractor shall rectify / replace at his own cost the defective materials and workmanship, as instructed by the company. 18) Drawings for work execution: Drawings for construction will be issued progressively to meet the schedule. Drawings and sketches provided along with this work order document are provided to indicate intent and extent of the work and are provided for tender purpose only for enabling contractor to quote rates. Before commencement of work, detailed drawings for construction shall be issued for enabling contractor to carry out construction work. 19) Insurance, PF & labour laws: Contractor has to comply with all statutory and legal requirements for applicable labour laws and acts. Contractor shall acquire labour licenses & PF registration (in case not available at the time of tendering) once the contract is awarded to him. Contractor shall bear all the statutory & incidental charges on this account at no extra cost to owner. Contractor shall keep company indemnified from all the liabilities and proceedings arising from such statutory and/or legal requirements and in the event of any such liability arising there from, the same shall be deducted from the amounts payable to the contractor. Contractor will submit Workman's Compensation Policy to cover his labors as mentioned along with 1st RA Bill. Contractor shall adequately insure all men/women labours, machinery, shuttering material & other resources deployed by him on site & indemnify the company from the claims arising out of any such damages. All notices with regards to the labour laws/PF/Labour insurance, which are served to the Owner for default by the contractor, will be fully and effectively dealt with by the Contractor himself. 20) Safety & security norms: Contractor should take adequate precautions for safety at site by providing, safety helmets, safety shoes, goggles, hand gloves, reflector jackets, safety belts etc. to workmen while working /moving at site. All electrical lines temporary / permanent at site should be checked before usage to ensure leakage. If any accident occurs at site due to negligence of the above mentioned safety norms, the contractor will be solely responsible for all the consequences arising out of the above and the client is absolved of any claims /compensation if any payable by the contractor to his workman. Company / client shall be indemnified for any theft, damages, accident for the plant & machinery. Entire responsibility of safety, storage of machinery; consumables etc. shall be with the contractor after the issue of material. 21) Cleanliness at site: Contractor shall keep the site in a clean and tidy manner as instructed by site in charge and if contractor fails to maintain the desired cleanliness, contractor interim payments shall be withheld and the site shall be cleaned by other agencies appointed by site in charge and the cost of the same shall be recovered from contractor’s interim payment. 22) Electric supply for work execution /labours: Electricity for construction and Labor Hutment shall be provided free of cost by us at one point, at every floor. Further distribution shall be at your cost. Electricity for labor camps shall be arranged by us at one point in labor camp. It shall be your responsibility to ensure that there is no misuse / wastage of Electricity. 23) Water supply for work execution / labour: Water for construction shall be provided free of cost by us at one point at every floor. Further tapping of the water shall be done by you at your cost. Water for labour camp shall be supplied at one place and further distribution shall be at your expenses. It shall be your responsibility to ensure that there is no misuse / wastage of water. 24) Assignment or sub letting: The work included in the Contract shall be executed by the Contractor and he shall not directly or indirectly transfer, assign or sublet the Contract or any part thereof or interest therein without the written consent of the Owner / Consultants. 25) Non performance & termination of contract : The developer/company reserves the right to terminate this subcontract with immediate effect either wholly or in part without payment of compensation to the contractor in case of following circumstances: a) If the contractor fails within three day notice from the Developers to proceed diligently with the works to his satisfaction and at all times in such a manner as will not in the Developers opinion, prejudice the completion of the whole or any portion of the work under the Principal contract in accordance therewith. b) If the contractor refuses/delays or fails within three days notice to rectify any defective workmanship to the developer's satisfaction. c) If the contractor fails to complete and deliver any work or portion of the work by the time or times specified as in the work schedule or by such extended time or times as may be allowed by the developers in writing. d) If the contractor fails to withdraw/replace immediately, at developers instructions, any one or more of the employees to whom developer objects or whose presence on the works may not be good to maintain healthy working environment on site. e) If the contractor sublets whole or part to this work without developers written prior approval. f) If the contractor fails within three days notice from developer to take action on any of the obligations on the part of the contract herein contained. g) If the contractor fails to mobilize sufficient manpower, machineries etc. affecting quality and progress of work. Company shall engage another agency to complete the work at contractors risk and cost. I accept this Work order along with the annexure/s Contractor’s company/firm seal and signature NameDesignationCompany name PlaceDate--------------------------------------------------------------------------------------------------------------------------- Developer’s company/firm seal and signature Signed byDesignation- ANNEXURE I Sr No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Work Item Vitrified tile flooring 600mm x 600mm Ceramic tile flooring 300mm x 300mm Ceramic tile flooring 450mm x 450mm Vitrified tile flooring 800mm x 800mm Vitrified tile skirting 600mm x 600mm Granite flooring with polishing Italian marble flooring with polishing Italian marble dado with polishing Cement tile flooring for parking 300mm x 300mm Concrete paver tile flooring Vitrified tile skirting 300mm x 300mm Vitrified tile skirting 450mm x 450mm Vitrified tile skirting 800mm x 800mm Granite skirting with polishing Vitrified tile wall cladding 600mm x 600mm Vitrified tile wall cladding 600mm x 300mm Vitrified tile wall cladding 300mm x 300mm Granite kitchen otta supported on kadappa supports as per drawing Granite basin counter for above counter basin as per drawing Granite basin counter for below counter basin as per drawing Granite door frame ( Double patti) of size 2’6” x 7’ i/c chamfer, edge polish Qty Rate Amount 22 23 24 25 26 Marble door frame (Double patti) of size 2’6” x 7’ i/c chamfer, edge polish Granite door frame for lift opening as per drawing 3 “ Granite window sill i/c chamfer, edge polish (Single patti) Polished granite tread and riser i/c chamfer, edge polish, 2 grooves Polished kota tread and riser i/c chamfer, edge polish, 2 grooves Total amount