TERMS OF REFERENCE FOR THE PREPARATION OF AN INTEGRATED REGIONAL MASTER PLAN FOR GALLIYAT REGION, PROVINCE OF THE KHYBER PAKHTUNKHWA 1 INTRODUCTION The word Galliyat is the plural of the Urdu word ‘gali’, which means an alley between two mountains on both sides of which there are valleys and it is not the highest point in the range. Many of the towns in the area have the word gali as part of their names. These are popular summer-holiday destinations in Pakistan. Murree, one of the most popular hill stations of Pakistan, is the largest town of the Galliyat area, but is administratively excluded from the purview of this Master Plan and the functional control of Galliyat Development Authority. The Galliyat region is strategically located between the Northern Areas, Azad Kashmir, Punjab and the rest of the Khyber Pakhtunkhwa. Hill stations collectively known as the Gallis and the Kaghan valley are the best known parts of Hazara Division. Domestic and foreign tourists throng its cool and serene valleys during sizzling summers. The region of Hazara is unique on our planet, as opens up to visitors, a world replete with natural beauty. It was a favorite gateway from the plains into Kashmir during Mughal, Durrani and Sikh rules. It is a large area some 10,000 sq. km. The world famous Kara Kuram Highway starts from Havelian, a town in this region at a distance of 101 km from Islamabad. The mighty “Lion River” Indus or Abasin flows through the entire length of Hazara. On the Southern region of Galliyat lies the Pakistan’s famous hill station, Murree. Since the region is located in between the Murree and Abbottabad; the influx of tourists visiting Murree who further plan to explore the Galliyat region on their onward travel to upper Northern Areas of Naran, Kaghan and is hence visited by thousands of people, round the year through the only Murree-Abbottabad Road. The region is blessed with extravagant natural scenery, pleasant to cool summer and crispy cold winter, with a relatively low snow fall. The region is accessible from Rawalpindi/Islamabad via Murree or from Abbottabad to Murree. The construction of Motorways from Peshawar to Lahore has further contributed in attracting tourist influx from other parts of Pakistan to Galliyat. Due to its strategic location and favorable temperature, many academic institutions and organizations have established their remote summer campuses or resorts in this region. Besides providing various socio-economic benefits related to the tourism industry, the heavy influx of tourists in this region is posing problems to the tourists, locals, municipal and administrative authorities. Environmental degradation is increasing day by day as a result of extended tourist influx and related activities. Although the Galliyat region has a high level of transient population passing through to commute between Murree and Abbottabad to reach their further destinations; the local human settlements have inability to extend physically, at required level, the existing tourist facilities, infrastructure, civic amenities etc have become insufficient to cope with the demand of the increasing visitors and the local population. It has therefore, become inevitable to take revolutionary steps to organize the tourism, existing infrastructure, civic amenities, transport system, accommodation and allied facilities, in 2 environment friendly manner to make the Galliyat region a model for passing-by tourists besides creating ecological balance with a unique abundance of flora and fauna related to this region. Study Objectives Keeping in view the above factors, the Galliyat Development Authority (GDA), Government of the Khyber Pakhtunkhwa (KPK) intends to hire the services of the consultants to conduct various surveys and studies to formulate an integrated Master Plan for Galliyat Region (within its controlled area of 2000 square kilometers) to make it a sustainable tourist region having following aims & objectives: Develop Galliyat an ecological tourism destination with availability of state of the art civic amenities, housing (apartments/hotels/guest houses) restaurants, shopping areas, recreation, cultural/entertainment, health, sports, education, transport and allied facilities. To suggest measures to attain various community infrastructure (social and physical) including all weather good roads, water supply, sewerage, electricity supply, communication facilities, adequate parking, bus/wagon terminals, public washrooms, drinking water points, rain shelters, solid waste management system, garbage depot(s), guiding indicators/guided trails/paths, parks, piped gas supply, cultural activities areas, natural tourism precincts, schools, health centers etc. To suggest measures (policy and strategies) requiring all kinds of development in complete harmony with the environment. To suggest various recommendations aiming improving civic pride, urban design guidelines related to the area’s socio-cultural ambience. To suggest measures making town centre and roads, completely free of all vehicular traffic primarily pedestrian friendly. To suggest measures making all the transportation system, environment friendly i.e. introduction of environmental-friendly vehicles, areal ropeway system/transit system etc. To suggest areas suitable for developing more parks, recreational facilities/nature reserves, soft adventure elements i.e., linking/camping, mountain hiking for unique experience of enjoying nature, its splendor and diversity. To suggest measures for uplifting the quality of local life and socio-economic conditions. To suggest measures achieving efficient and sustainable resource utilization. To prepare a document acceptable to the procuring agency (GDA) that provides sufficient details and information to private investor(s) to access to invest on proposed transportation and allied tourist’s facilities on BOT/Joint Venture/Turn Key Basis. Salient Features of the Proposed Plans:The proposed Plans will consider the following components for their implementation-part subject to the recommendations of the surveys and studies to be undertaken further in PC-II schemes to be developed by concerned department later: Identify areas for the development of water supply scheme, sewerage/drainage system. Proposals for solid waste management system. Proposals for provision of electricity supply, telephone & communication facilities. Proposals related to provision of boarding/lodging facilities, recreational facilities, parks, camping sites, shopping areas, food facilities, civic amenities hiking / pony trails etc. Suggest measures for formulation of rules/regulations to protect the environment and to check the un-planned development. Identification of causes for environmental de-gradation and to formulate a plan to protect and conserve the natural assets to benefit from natural resources. Improvement and development of road network and formulation of a plan for pollution free public transportation system with supporting facilities. 3 SCOPE OF WORK Study Area The planning study area includes areas under the jurisdiction of Galliyat Development Authority (GDA), and surrounding rural fringes as shown in the map attached. Master Plan The Consultant shall perform; Critical examination of the any previous studies done for Galliyat region and highlight the deviations during its implementation. Inform and update the lessons learned from implementation of previous Master Plans / Studies (if any) and suggest the ways how the client could improve the implementation of new Regional Master Plan. Devise a realistic action plan for implementation of the proposed Regional Master Plan for next twenty year. The consultant shall keep in view, overall and touristic needs of the Galliyat region and its vicinity and prepare a comprehensive Regional Master Plan for next twenty years. (I) PHYSICAL SURVEYS &GIS DEVELOPMENT a) Study of the pattern on which Galliyat Region has developed in the span of more than a Century, for identification of problems arising due to un-planned development. b) Survey and reconnaissance of the entire area to know its characteristics in detail. c) Identification of root causes for environmental degradation in the area. d) To devise a mechanism and to prepare a workable integrated master plan of the project area to make desired/required developments and to maintain ecology of the area without affecting the development. e) Various surveys related to Master Planning studies such as socio-economic, traffic and transportation surveys, parking surveys, local community’s perceptions and reservations, various kind of data collection from line departments, demographic trends, development and sprawl identification etc. f) Production of a GIS-based map of Galliyat region further to be used for various data inputs to carry out various analysis using GIS. g) Preparation of development plan for the proposed construction installations, buildings and other components for better land use. h) The proposed Master Plan to include a strategic vision to benefit from natural resources with a sustainable manner while keeping urban development in harmony with the environment. i) Devising a mechanism for sewerage, solid waste management plan for project area. j) Preparation of a detailed plan by suggesting other services, amenities, developments etc. to facilitate the users and the operators. k) Estimation of traffic and tourist’s inflow and its economic impact on the area, including technical, financial and economic viability of the proposed project. l) To suggest recommendations to control unchecked/ill planned constructions / developments to save, preserve the beautification (natural and manmade) of the project area and its vicinities. m) To conduct land use pattern survey of the project area and to suggest measures to protect the project area from environment degradation and to suggest other developments in a well planned and controlled way for futuristic developments and extensions, if so required. n) Estimation of traffic and tourist’s inflow and its impact on the project area. o) To prepare schedule and recommend any other activity/measures required for successful execution /completion /commissioning of the proposed project by reflecting the anticipated barriers / bottlenecks, threats, weakness, strengths, risks involved i.e. natural / geological, geographical, human, others etc; including safety and security risks / measures. p) To prepare a document, acceptable at national/international level, by providing necessary details and information about the proposed project area to attract potential investors to invest on, against all the developments except infrastructure development i.e. roads, water supply, sewerage, solid waste management, electricity etc. 4 (ii)- TECHNICAL ASPECTS OF THE STUDY To develop Galliyat region environment friendly tourist destination; while the study should consider the regional dynamics (tourism, development pressure, socio-economic needs, political and geographical constraints etc.) giving utmost attention and treatment to formulate a technically, financially and socio-economically / socio-politically workable plan. In order to comprehend and evaluate the proposed master plan and Beautification Plan (before its finalization and recommendation to implement) from its all aspects, a number of surveys and studies have to be identified and carried out by the consultants in a wide variety of fields:(iii) SURVEYS & STUDIES DATA COLLECTION/SITE RECONNAISSANCE SURVEY The consultant shall carry out reconnaissance surveys of the entire area, to collect all possible data for use in the preparation of the required Plan(s), including collection of reports, maps, reference material and any other potential data or information. Procurement of satellite imagery for GIS development. Socio-economic, traffic and tourist surveys/demographic surveys. Surveys of hotels/apartments/rest houses/other accommodation. Considerations for geological, geo-technical hazards including seismic risks and landslides etc. Various planning surveys (subject area related). Collection of Hydrological studies and meteorological data. Fauna & Flora studies. (iv)SOCIO-ECONOMIC, TRAFFIC AND TOURISTS SURVEYS The consultant shall carry out surveys and studies to know/determine; The socio-economic life style of the locals and the visitors. Local Livelihood Assessment - means of income for the locals and the visitors. Average means and maximum per capita income of the locals and the visitors. Impact of tourism activities on the local socio-economic life. Demographic surveys to know the size of the existing local population of the project area, occupation(s) with male/female ratio and literacy rate (gender wise) and annual growth rate with future projections. Traffic circulation on the existing routes to and from Abbottabad &Murree to assess the travelling patterns, quantum of vehicles (with type) and their impact on local socioeconomic life, environment etc. Present and projected traffic load, existing facilities roads/paths, parking spaces, terminals and actual/present requirement with future projection to make recommendations for the enhancement/improvement. Quantum of tourist with respect to their stay profile (day trippers and night stayers) trend/motive, the existing boarding / lodging facilities/ restaurants / allied facilities / public amenities and to get feedback from the locals and the visitors to identify the problems to address the same and to meet present and future requirements/projections. Identification of suitable routes to operate tourist bus/van etc. shuttle service for the transportation of the tourist from recognized parking plazas / terminals. Identification of sites for construction of bus, van, stops, bays and terminals etc. (v) GEOLOGICAL AND SEISMIC CONSIDERATIONS. The Consultant(s) are required to consider the geological and seismic factors related to various kinds of development suitable for this region; Recommend slope(s) stability to develop various infrastructure. Recommend development options suitable for various slopes and geologically-sensitive areas. (vi) PHYSICAL SURVEYS The survey(s) shall be carried out to have a technically, financially and environmentally implementable and maintainable Master Plan for Galliyat region; Nature of environmental problems, their causes and impact on environment and to select areas for concentrated study. 5 (vii) (viii) IDENTIFICATION OF EXISTING LAND USE To up-date the existing land use and infrastructure data. To identify a phased programme of development. To conceive a phased development study—based on short term, medium and long term planning with identification of all major components to recommend required zoning to suggest; o Areas---easily developable. o Areas---relatively difficult to develop. o Areas---difficult or unsuitable to develop with status of land involved. To identify requirement of the area for new developments by measuring/demarcating the boundaries of the land required HYDROLOGICAL STUDIES Identification of suitable and regular source of water supply to the project area. Water availability and flood studies / hill torrents in and around Galliyat region to be carried out comprising such as:o Rainfall Data o Stream’s flow data o Existing water source o Flood studies o Snow fall data o Field surveys. The consultants shall also Conduct hydrological study on the basis of available data/information and assess availability in the area to evaluate present and future water supply sources, their sustainability for drinking purposes, including ground water, streams. Identification of new sources - possibility of lifting of water from river Haro and other streams to provide WHO water-needs standard for supply of water per person per day, on regular basis/consideration of alternative water supply system to select the most appropriate one. Ascertain design population and water demands for present and future (projected) different water uses including residential, commercial, and institutional and recreation areas. Identify existing and proposed water supply distribution network. Suggest various environmental-friendly measures to collect and store water at household level such as rain water harvesting, purification and usage at domestic level. (ix) The agents causing instability to environment and to suggest controlling measures. VARIOUS PLANNING SURVEYS The survey(s) shall be carried out to develop an integrated plan(s) which shall include; A frame work identification of form and direction of physical growth of Galliyat region for next 20-years. Short term plan for identification of scope of work pertaining to public utilities, urban developments, traffic and transportation, urban management, environmental improvements with respect to residential, food, recreation, civic amenities, horticulture and demarcation of areas for land use pertaining to housing, urban services, communications, commercial centres, institutional resources, essential infrastructure. Regulative and institutional framework for planning, programming and delivery of urban services. Plan shall be prepared conforming to master plan for water supply, sewerage, solid waste management, traffic management, public transport system, construction of roads, electrification, telecommunication, gas distribution, street lighting, storm water drainage, public toilets, street façade, parking places/bus wagon terminals, bus/van bays, rain shelters, sports facilities, park development, cultural complex(s) (movie theaters, art & artisan centre, museum etc.) shopping areas, hotels/guest houses, restaurants/roadside café(s), pedestrian paths/guided trails, cycling tracks, pony track, Tourism Information Centre, camping areas, view decks, signage, police posts, offices etc. Identification of existing buildings in dilapidated conditions, posing threat to public safety to suggest their demolishing strategic plan/reconstruction/safety measures. 6 (x) Identification of areas prone to land sliding for suggesting measures to mitigate the damage due to this behavior. BIODIVERSITY STUDIES The following will be studied and reported: (xi) Topography Source of irrigation (existing and proposed) Horticulture development (existing and proposed) potential Review of information about existing fruits / crops / plants. Nursery establishment (indigenous / exotic) Soil and water quality – spring water / ground water / surface water / sewerage water Selection of plants (indigenous fruits preferred) Floriculture development and production Forestry. Wildlife (birds and animal species). SEWERAGE & DRAINAGE (xii) To estimate the present and future population’s, water demand and daily waste water sewerage. To determine sewerage flow and characteristics/various types of uses i.e. domestic, commercial etc. Evaluate the need of separate/combined sewerage system treatment. Determine general agreement to configure trunk and lateral sewers as per local site conditions. To examine the need for rain water drainage plan. Prepare an effective plan for snow fight in the area to avoid damages caused to buildings, roads and allied infrastructure during and after snow fall. Prepare surface drainage measures/engineering design to protect slopes roads, buildings etc from surface run off caused by heavy precipitation. Suggest options to design for the collection and disposal of raw sewerage and of surface run off without affecting atmospheric environment and having no pollution in the project area. ROADS AND RELATED INFRASTRUCTURE The consultant shall suggest proposals to be indicated in the Master Plan including; Identification of existing and new roads for construction/improvement. Prepare inventory of type of roads, including their geometric features, type and condition of drainage structure(s), pavements and other major features. Study the hydrological regime based on analysis of rain fall, snow fall, and flood record supplemented by detailed field investigation to suggest the suitability of available road infrastructure and desired improvements if any. Identify roads requiring side railing(s) / other safety measures for pedestrians and beautification works. (xiii) TRAFFIC CONTROL & TRANSPORTATION SYSTEM Keeping in view the local traffic and transportation issues, the consultant shall carry out survey & study to suggest a workable plan/layout plan and give recommendations to address these problems in the following manners, but not limited to: Identification of new parking spaces and to improve the existing parking facilities at various locations. Suggest measures which segments of the settlements in the Galliyat region are best feasible to be converted predominantly pedestrian-districts for increasing holistic tourism value. Suggestions and identification of parking lots/bus and wagon bays/halting points for public transport at appropriate places with supporting facilities/public amenities. Suggest and identify measures to improvement/modification or conversion of existing chairlift in modern cable car system to increase the tourism experience. Introduction of convenient and swift public transport system for its operation from various proposed parking lots to various places in Galliyat region to facilitate the tourists. 7 (xiv) (xv) Any other possible system/measures to make Galliyat region pollution free town. SOLID WASTE MANAGEMENT To know the existing and future solid wastes and give management plan to ensure safety of environment. Suggest solid waste management plan, giving ways and means to collect solid waste from the town/project area and designate locations for its proper disposal. Any treatment if required before disposal for mitigation of environment pollution may also be suggested. Prepare detailed design report giving basis and standards used for designing. Prepare economic analysis of the proposed facilities. ENVIRONMENTAL CONCERNS The consultant is expected to focus his technical studies essentially linked to the environmental concerns related to the Galliyat region. The following issues/factors have to be considered in this regard: Suggest which areas are suitable for urban development with minimal disturbance to the natural environment. Suggest measures to pedestrianize various commercial centres of the Galliyat region completely free of vehicular traffic with access only through public transport system such as shuttle vans, and cable cars. Restricting the requirement for roads and pavements will not only reduce the need for clearing trees but will also address the other concern relating to reduced volume of surface runoff from snow and rainfall. All spring cracks and other sources of water within the project area may be left untouched. This will immensely help in maintaining the ecosystem. Possibility may be considered to lift water from river Haro or other sources to meet the present shortfall and future requirement (treated and pumped in stages). Study may be carried out for all waste water and other effluents to be treated through a number of sewerage treatment plants. Considerations for a technologically advanced solid waste handling system to be proposed to help in maintaining very high sanitation standards in the project area. Suggest measures to decrease the reliance on natural resources for domestic fuel requirements for cooking and other needs. This will help in minimizing illegal logging and protecting the forests in the area immensely. Suggest and identify areas for future built up areas with minimal disturbance to the forest lands. Suggestions should incorporate terrain characteristics in the Galliyat region. A comprehensive plan for afforestation and soil conservation shall be developed for the area. No stone excavation should be recommended from the area. Land use planning is the only way to locate development on stable ground and to allocate landslide prone areas for open space or low intensity uses. All the active landslide be identified and studied for proper mitigation (xvi) BUILDING REGULATIONS A review of the existing building regulations currently applicable for residential, commercial, educational, religious, health and office buildings including hotels and restaurants in the study area of Galliyat region. Suggest appropriate improvements in the building regulations. (xvii) ORGANIZATIONAL/INSTITUTIONAL SETUP To reviews existing institutional setup/frame work for implementation of the proposed Master Plan and the Beautification / Civic Amenities plan. Determine various functions of the various agencies for the implementation of the Master Plan and the Beautification / Civic Amenities plan. Examine existing land use control/bye-laws and development codes to determine consistency in implementation and sustainability of the proposed Master Plan and the Beautification / Civic Amenities plan. 8 (xviii) FINANCIAL & ECONOMIC SURVEYS To assess the local economy and tourism impact on the local socio-economic life to recommend type of new jobs/business opportunities to be created for the locals in environment friendly manner. To prepare a financial appraisal to evaluate different means of revenue collection including water/sewerage charges and taxes. (xix) Meetings/Consultation/Seminars The Consultant shall conduct public informational meeting to introduce the project intent, project components, and to seek guidance on the identification of goals, objectives, issues, concerns, opportunities, etc. with the concerned stakeholders as and when appropriate for the successful completion of the exercise. The Consultant(s) are also desired to hold such meetings with line public sector department and share the output in seminars as desired by the procuring agency (GDA). PROJECT TEAM / CONSULTANT’S PROFILE: The consulting firm is expected to be very familiar with regional development planning/strategic planning/master planning/tourism planning and integration of factors such as socio-economic and demographic trends, environmental sustainability, domains with having considerable experience in taking up / completion of Regional Master Plans. The consulting firm must be a multi-disciplinary team of professionals and technical personnel. The firm must have the capacity to use different analytical techniques and software; and must demonstrate past experience of conducting similar studies, locally and/or internationally for complex towns, regions which share the same characteristics as that of Galliyat Region. Time Period The time period to complete this assignment will be 8 months starting February 2016 to September 2016 enabling the Procuring Agency (GDA) to implement the Regional Master Plan for Galliyat Region from October 2016 till appropriate planning period as per the guidance of Regional Master Plan. Key Personnel and Man months Sl.No. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. Designation Team Leader / Project Manager – Regional Planner Regional/Urban Development Specialist Planning/Zoning Law Specialist Ecologist / Environmental Specialist GIS/MIS Specialist GIS/MIS Specialist Urban Finance Expert Urban Governance Specialist Urban Infrastructure Specialist Urban Transport Specialist Man Months 8 5 3 2 3 2 1 2 3 2 Deliverables The study deliverables will be written documents containing the study findings with supporting maps and analytical summaries and recommendations with respect to policy direction. All deliverables are to be submitted to the Procuring Agency i.e.Galliyat Development Authority (GDA). A minimum of 3 hard copies of each deliverable at each stage of the study, as well as an electronic version of the deliverable including all drawing files (i.e. AutoCAD, GIS, PDF etc.) are required to be submitted to the Client. Following deliverables shall include necessary part of the assignment: 1. 2. 3. 4. Inception Report Background Study / Analysis Report (Situational Report) Draft Regional Master Plan (Report & Maps) Final Regional Master Plan, Policy Recommendations (Report & Maps) 9 The delivered products resulting from the study are to be owned by the Galliyat Development Authority (GDA) as public documents and are, therefore, subject to the provisions of The Freedom of Information Act 2008. Consultants Qualification i) ii) iii) iv) v) The Consulting Firm/Consortiummust have prepared at least five Regional Plans/multi-sectoral Area Development Projects over the past five years. Firms having done more such projects will be given added advantage The firm/consortium should have considerable experience of working on planning related projects in Khyber Pakhtunkhwa in general, and Hazara Division in particular. The Team Leader/Projects Manager should have a Master’s Degree in City & Regional Planning with minimum of 25 years experience. The Team Leader should have worked on at least 8 Regional/District Level Planning Projects. All other Team Members must have Master’s degree in their respective fields with at least 15 years experience. For GIS Specialist, the minimum experience is 10 years. TECHNICAL EVALUATION OF CONSULTANTS Technical Evaluation will be based on the following Criteria: 1. Experience and Standing of the Firm/s (25 Marks): i. Experience in Projects of similar nature: 15 marks ii. Experience of Similar Projects in KPK: 7 Marks iii. Experience of Similar Projects in Hazara Division: 8 Marks 2. Experience and Standing of the Proposed Team (35 Marks) i. ii. iii. iv. v. vi. vii. viii. ix. x. Team Leader / Project Manager – Regional Planner Regional/Urban Development Specialist Planning/Zoning Law Specialist Ecologist / Environmental Specialist GIS/MIS Specialist Tourism Development Expert Urban Finance Expert Urban Governance Specialist Urban Infrastructure Specialist Urban Transport Specialist (10) (5) (4) (5) (3) (5) (4) (4) (5) (5) (Note: The distribution of marks for each team member will be the same as for firm, as given above) 3. Approach and Methodology (20 Marks) Marking for this will be based on: i. ii. iii. iv. v. vi. Comments on TOR Understanding of the Project Objectives Approach and Quality of Methodology Work and Planning Schedules Innovation Proposal Presentation 4. Financial Proposal (20 Marks) 5. The overall score will be determined by adding Technical Score and Financial Score, and the respective weightage in the same order will be 80:20. 10