Removal of Outdated and Unnecessary Policy Material

advertisement
National Capital Plan – Amendment 81 –
Removal of Outdated and Unnecessary Policy
Material
Australian Capital Territory (Planning and Land Management) Act 1988
I, Catherine King, Minister for Regional Services, Local Communities and Territories,
approve this amendment of the National Capital Plan under section 19(1)(a) of the
Australian Capital Territory (Planning and Land Management) Act 1988.
Dated 1 May 2013
CATHERINE KING
Minister for Regional Services, Local Communities and Territories
1
Name of instrument
This instrument is the National Capital Plan – Amendment 81 – Removal of
Outdated and Unnecessary Policy Material.
2
Commencement
This instrument commences on the date of its registration.
3
Amendment of National Capital Plan
Schedule 1 amends the National Capital Plan.
Schedule 1
Amendment
Schedule 1
Amendment
(section 3)
Part One Principles, Policies and Standards, Designated
Areas, Special Requirements
a.
Amend policy 1.2.3(d) to read as follows:
The water quality and hydraulic operation of the lake should be
maintained in a manner designed to protect Lake Burley Griffin and
Foreshores’ visual and symbolic role.
b.
Delete the following annotation on Figure 17 ‘The Central National Area
(Lake Burley Griffin & Foreshores)’:
For details of proposed widening of Morshead Drive refer to Appendix R.
c.
Delete the final sentence of paragraph six of section 4.1.
d.
Amendment Policy 8.6.3(b) to read as follows:
The streamflow and water quality of the rivers shall be protected from
adverse external influences and maintained in a manner which ensures
compatibility between land uses, water uses and environmental character
of the rivers.
e.
Delete policy 12.3(e).
Part Two Administration and Implementation
f.
Delete the following sections of Part Two Administration and
Implementation:

Gazetted Policies of the Former National Capital Development
Commission

Planning Appeals

Review Programme
g.
Delete paragraph two under section titled ‘Development and Management
of National Land’.
h.
Amend the Plan to recognise consequential changes of Amendment 81 to
page numbers, section titles and contents page.
Part Three Background Notes
i.
2
Delete Part Three Background Notes
National Capital Plan – Amendment 81 – Removal of Outdated and
Unnecessary Policy Material
Amendment
Schedule 1
Appendices
j.
Delete Appendix C – National Capital Development Commission Policies
Revoked by the National Capital plan
k.
Delete Appendix D – Declared National Land
l.
Delete Appendix E – Water Quality Policies
m.
Amend Appendix J – Lake Burley Griffin Technical and Management
Guidelines as follows:

Delete section titled ‘Hydraulics and Water Quality’

Delete section titled ‘Maintenance and Management’

Delete guidelines 1, 2, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17,
and18

Amend guideline 3 to read as follows:
The normal mode of operation of the Scrivener Dam floodgates should
be to release flow at approximately the same rate as the inflow to the
Lake from all sources less losses. This will maintain a nearly constant
Lake level in East Basin equal to the normal Lake level of RL555.93.

Delete the final three paragraphs of guideline 20.
n.
Delete Appendix K – Commonwealth Grants Commission 1986
Classification Criteria
o.
Delete Appendix R – Morshead Drive Widening
p.
Delete Appendix W – West Belconnen
Note
1.
All legislative instruments and compilations are registered on the Federal Register of
Legislative Instruments kept under the Legislative Instruments Act 2003. See
http://www.frli.gov.au.
National Capital Plan – Amendment 81 – Removal of Outdated and
Unnecessary Policy Material
3
Download