Laboratory - Documentation Checklist 17025 General Accreditation Requirements Laboratory Name Date Instructions: All documentation stated below indicated with an X are required to be sent to L-A-B at least 30 days prior to the scheduled assessment. L-A-B does not maintain any laboratory quality documentation on file. Any delays in receiving the necessary documentation may result in a rescheduling of the assessment per L-A-B Policy 004. Electronic documentation must be sent to operations@l-a-b.com or l-a-b.sharefile.com. L-A-B documents are available on our website at www.l-a-b.com. Laboratory Documentation Submittal Requirements Initial / Full Assessment Type I Surveillance Type II Surveillance X X X X If Changed If Changed X X X X X X X X X X X X Date Submitted New or Modified “Proposed Scope of Accreditation” Scope changes require a Form 19 Change Notice and an updated Word version. If the scope is new or modified a new estimate may be required. CMC changes typically do not require a new estimate. If the scope remains the same and is listed correctly on our website put SAME. L-A-B Form 48B - Assessment Checklist Complete on its latest revision level. Completely filled out Electronically. Required for surveillance if changed L-A-B Form 001 – Traceability Tracking (Per L-A-B Policy 001) Assure form is updated and current. Laboratory Quality Manual Lab Policies, Procedures, Scope Related Technical Procedures Examples include (but not limited to) – Policy for ethics, procedures for document control, technical procedures or work instructions supporting the scope, etc. X Supporting Uncertainty Budgets for the Scope (Calibration Only) Provide estimation of uncertainty to support all the CMC(s) (for calibration parameters) in accordance with L-A-B Policy 001. This is required to be reviewed every year and submitted to L-A-B. Critical for calibration parameters. Latest Management Review and Internal Audit Results Provide the most current Management Review and Internal Audit results completed to the requirements of ISO / IEC 17025. Form 18 – 17025 - Laboratory Documentation Checklist - Rev 22 – 02/11/15 Page 1 of 2 Laboratory - Documentation Checklist 17025 General Accreditation Requirements Laboratory Organizational Chart Proof of Purchase of ISO/IEC 17025:2005 Initial assessment only. X X X X X X X X X X X X X X X Initial Only Laboratory Calibration Certificate or Test Report Provide a copy of a typical example(s) of your Laboratory Calibration Certificate or Test Report in accordance with 5.10 of ISO/IEC17025 and L-A-B Policy 001. Form 002 – PT / ILC / IQA Tracking (Per L-A-B Policy 002) Assure form is updated and current. PT / ILC / IQA - 4 Year Plan (Per L-A-B Policy 002) Form 28.12 - ILC/PT/ IQA Tracking or equivalent plan. Updated. PT / ILC / IQA - Results Provide most recent PT / ILC / IQA results covering the last 365 days. As identified on the PT / ILC / IQA 4 Year Plan. Form 18 – 17025 - Laboratory Documentation Checklist - Rev 22 – 02/11/15 Page 2 of 2